0% found this document useful (0 votes)
186 views1 page

TMS Form

The document appears to be a table detailing the steps in a manufacturing process across 5 trials. It lists events like inspecting for defects, cleaning areas, arranging sheets and molds, applying tapes and wax, sealing, curing, demolding and finishing. The table tracks the process over 5 trials and includes a remarks section to note any issues.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views1 page

TMS Form

The document appears to be a table detailing the steps in a manufacturing process across 5 trials. It lists events like inspecting for defects, cleaning areas, arranging sheets and molds, applying tapes and wax, sealing, curing, demolding and finishing. The table tracks the process over 5 trials and includes a remarks section to note any issues.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Length: No.

of Thickness: PU Line 12 meter press


Width: Operators: UNION GALVASTEEL CORP.
EVENT TRIAL 1 TRIAL 2 TRIAL 3 TRIAL 4 TRIAL 5
Inspect for excess
tape, foam and check
air vents.
Clean working area.
Walk to sheets
location, put sheets in
working area.
Prepare the bottom
sheets.
Arrange the jigs.
Arrange the molds.
Inspect alignment.
Set up bottom sheets
in the mold.
Put tapes.
Putting stopper
Put wax.
Place spacer, prepare
the top sheets.
Walk to sheets
location, put sheets in
working area.
Arrange the top
sheets.
Seal using tape.
Inspects the seal.
Put proper label.
Wait until the sheets
are put to press
machine.
Curing
Demolding
Finishing

REMARKS:

You might also like