You are on page 1of 1

Length: No.

of Thickness: PU Line 12 meter press


Width: Operators: UNION GALVASTEEL CORP.
EVENT TRIAL 1 TRIAL 2 TRIAL 3 TRIAL 4 TRIAL 5
Inspect for excess
tape, foam and check
air vents.
Clean working area.
Walk to sheets
location, put sheets in
working area.
Prepare the bottom
sheets.
Arrange the jigs.
Arrange the molds.
Inspect alignment.
Set up bottom sheets
in the mold.
Put tapes.
Putting stopper
Put wax.
Place spacer, prepare
the top sheets.
Walk to sheets
location, put sheets in
working area.
Arrange the top
sheets.
Seal using tape.
Inspects the seal.
Put proper label.
Wait until the sheets
are put to press
machine.
Curing
Demolding
Finishing

REMARKS:

You might also like