You are on page 1of 2

November 7, 2019

Project : EMS Preventive Maintenance of Alarm System at Building 1 and Building 2

Date/Time: October 26-27 2019

Workers/Personnell Present:
Ross Andre Ricamara
Vonn Ryan Rabang
Randy Dargantes
Jonathan Malsit

A. WORK ACCOMPLISHED:
 Replacement of 3 units of Manual Call Points at building 1.
 Replacement of 3 units of Horn at building 1.
 Testing of the system per zone and general alarm to ensure the proper operating
conditions.
 Testing of control panel

B. PROBLEMS ENCOUNTERED:
1. Pre alarm at the QA Room.
2. MCP fire condition at the CLINIC HALL-WAY and ICTC Room.
3. Six Faults in Smoke Detector at the 3M STORAGE and OKURA Warehouse.

Comments

Note: Some of smoke detector is install in an inappropriate location, and some of


notifications in alarm circuit.

Prepared and Submitted by:


Ross Andre Ricamara
November 7, 2019

Project : EMS Preventive Maintenance of Alarm System at Building 1 and Building 2

Date/Time: October 26-27 2019

Type of System: Fire Detection Alarm System

Visual Functional Tested Satisfactory REMARKS

Type Yes/No Yes/No Yes/no YES NO


FACP Yes Yes Yes the system is running
Battery Yes Yes Yes In normal status.
SD Yes Yes Yes
Horn Strobe Yes Yes Yes
MCP Yes Yes Yes

Troubles that encountered


1.Pre alarm at the QA room
2.MCP fire condition at the CLINIC HALL-WAY and ICTC ROOM
3.six fault smoke detector at the 3M STORAGE and OKURA WARE HOUSE

Note: some of smoke detector are inappropriate location, and some of notification alarm circuit
Has no supply/OL set another meeting to discuss it. for recommendation

Prepared and Submitted by:


Ross Andre Ricamara

You might also like