Project: Date/Time: October 26-27 2019 Workers/Personnell Present: Ross Andre Ricamara Vonn Ryan Rabang Randy Dargantes Jonathan Malsit
Project: Date/Time: October 26-27 2019 Workers/Personnell Present: Ross Andre Ricamara Vonn Ryan Rabang Randy Dargantes Jonathan Malsit
Workers/Personnell Present:
Ross Andre Ricamara
Vonn Ryan Rabang
Randy Dargantes
Jonathan Malsit
A. WORK ACCOMPLISHED:
Replacement of 3 units of Manual Call Points at building 1.
Replacement of 3 units of Horn at building 1.
Testing of the system per zone and general alarm to ensure the proper operating
conditions.
Testing of control panel
B. PROBLEMS ENCOUNTERED:
1. Pre alarm at the QA Room.
2. MCP fire condition at the CLINIC HALL-WAY and ICTC Room.
3. Six Faults in Smoke Detector at the 3M STORAGE and OKURA Warehouse.
Comments
Note: some of smoke detector are inappropriate location, and some of notification alarm circuit
Has no supply/OL set another meeting to discuss it. for recommendation