You are on page 1of 6

WEEKLY REPORT

SITE: FUJAIRAH CITY CENTER

SI DATE ENGINEER/TECHNICIANS SYSTEM

Engg :Sajin Mohammed

Tech: Safdar, Saqlain, Sheikh

21/01/2018
Fire Alarm/ Fire
1 to Fighting
28/01/2018
OVERALL SITE STATUS
The fire alarm control panel is in good condition but having some disablements due to construction of the closed sh
1

2
3
4
WEEKLY REPORT
SITE: FUJAIRAH CITY CENTER

WORK DONE FINDINGS


1.Maintenance for VOX cinemas started

2. Device Disable for the following shops


a.cotton on, b. Candelite,c.
Aeropostale,d.Sayadiya
3.False alarm in Burger King

4. Fault shows in Monsoon Children

5. False alarm in carpisa


Rectification and installation of
Fire alarm & Fire fighting system

6. Fault shows in BMS room panel


OVERALL SITE STATUS
e disablements due to construction of the closed shops. The following are the disablements, 1. Subway,2.Aeropostale 3.Cotton kid
REMARKS
Fire extinguishers and fire hose reel completed

The mentioned shops already closed

Heat detector activated, rectified

Other Fire Fighting contractor is doing


maintenance

Rectified

Rectified
sablements, 1. Subway,2.Aeropostale 3.Cotton kid