Professional Documents
Culture Documents
NAME
SIGN
DATE
A ACCOMMODATION
1 BATTERY ROOM YES NO REMARKS
Battery room to have valid PPE and in good condition. Eye wash
b
should be valid and sealed (gloves, eye protection, hydrometer, etc.)
Is there a Proper Testing Kit for Smoke, Heat & Flame sensor in
c
onboard. (Testing without correct equipment is a deficiency)
Spare Sensor:
How many spare sensor are onboard for following
1.
1. Smoke.
d 2.
2. Heat
3.
3. Flame
Rescue Boat Davit all Limit switches are tested weekly and are
a
working satisfactory.
Port:
1. Life boat battery Renewal date: Stbd:
Port Side: Freefall:
c Stbd Side:
Free Fall:
2. Rescue boat Battery Renewal date:
Date Of Last
How are the cargo hold water ingress alarms tested (is there a test
d Test:
unit provided and where is this kept)
Dewatering alarm tested for Fore Peak store + Other Fwd stores (
e
Alarm on Bridge working satisfactory)
115 volt or 220 volt Main and emergency switchboards, and feeder
a
panels are clear of any low insulation readings
d What are the alarm setting value for 110 v / 220v Insulation
1. Confirm each Electrical panel & Starter Panel have insulation mat
under it for safety. 2.
f Yellow marking to be made under Electrical Panel as a indication for
rubber mat. And visible Yellow sign will identify missing insulation
mats.