Place:
Purpose: To close warranty issued by TEC in
CEMS System. Date
Prepared by
Attendees:
Nak Hyun Lee DAELIM Lee Sang-Gyun
Vinod Kumar DAELIM
No. Description
Action
on Remark
By
r Mr. Lee Sang-Gyun reached site
Place:
Prepared by
Attendees:
No. Description
Siemens engineer Mr. Dae Sung Lee reached at diamond hotel on May 29, 20
evening.
May 30,2019:
1.Morning meeting with owner for the action item.
May 31,2019:
1.Warranty Notice N-2019-0134/N-2019-0135,Installation of the smo
and test was conducted. 2.Spare DLC ( Device Loop Card ) b
from TEC was installed at 3U-LFAP-2100-1019(STG).Siemens Vendor will send new DLC
replacement.
2 noticed that Siemens brought new smoke detector, but it is not the same as existing a
refused to accept different model number (Existing FD0421, New HFP-11).
4. Siemens have to provide
model number smoke detector total : 3PCs. DPI will install.
5.On May 31,2019 in the evening after replacement of the fire alarm netw
accidental discharge happens at JH-10 and 11 without any actual fire in the system.
No. Description
Worri Environmental Techonlogy Engineer Mr. Lee Sang-Gyun, will leave the
May,2019.
Pagbilao 420 MW CFPP
1-Jun-19
Attendees:
Siemens
n Action By Remark