WARRANTY NOTICE OF (Worri Environmental ) Project No.

MINUTES OF MEETING (MOM)

Place:
Purpose: To close warranty issued by TEC in
CEMS System. Date

Prepared by
Attendees:
Nak Hyun Lee DAELIM Lee Sang-Gyun
Vinod Kumar DAELIM

No. Description

Worri Environmental Techonlogy Engineer Mr. Lee Sang-Gyun reac


on 18 March, 2019 late evening.
Warranty Notice N-2018-0154:
Installation of cable for the IO Module & pow
module with proper support in the control panel was succsfully completed

module signal input and output normal condition.


1 Installation of the additional Communication Module (C
done by Electrobyte Local veneor in 2018) as built drawings have to provi
owner prior to close Warranty Notice officially.
No. Description

Warranty Notice N-2018-0176:


Replaced the new AR-600 Computer card, af
replaced new card. =CO Value is different to DCS to (Analyser at local 20m
DCS 50mg/m3, Re-installed the existing card to check the CEMS paramete
weather new computer working or not since several time exchanging Exis
computer card. AR-600 Software become faulty, Vendor re-installed new c
2 card once again and normalize CEMs System.CO Value at local 20mg'm3,
50mg/m3.
Problem:
CESM AR-600 to data-logger there is no reading. Even through the replace
the AR-600 Computer care. Owner strongly requested to vendor to solve t
matter as soon as possible.

Worri Environmental Techonlogy Engineer Mr. Lee Sang-Gyun, wil


the site on 22 March,2019.
Pagbilao 420 MW CFPP

DPI Cmmp Office

March 21, 2019

Vinod Kumar Prasad


ttendees:
Worri Enviromental
Tech.

Action
on Remark
By
r Mr. Lee Sang-Gyun reached site

ble for the IO Module & power


el was succsfully completed.
Check the
on.
l Communication Module (CM) was Worri
built drawings have to provide to
Action
on Remark
By

w AR-600 Computer card, after


CS to (Analyser at local 20mg/m3,
o check the CEMS parameters
veral time exchanging Existing /New
y, Vendor re-installed new computer
O Value at local 20mg'm3, DCS Worri

g. Even through the replacement of


uested to vendor to solve this

r Mr. Lee Sang-Gyun, will leave


WARRANTY NOTICE OF (SIEMENS) Project No.
MINUTES OF MEETING (MOM)

Place:

Purpose: To close warranty issued by TEC in Firealarm System. Date

Prepared by

Attendees:

Vinod Kumar Prasad DAELIM Dae sung Lee

No. Description

Siemens engineer Mr. Dae Sung Lee reached at diamond hotel on May 29, 20
evening.

May 30,2019:
1.Morning meeting with owner for the action item.

2.Warranty Notice N-2019-0004, Replacement of the fire alarm network dev


(3U-LFAP-2520-101 Coal handling & 3U-LFAP-2510-101 Crusher House)
1 3.During the deluge valve simulatio
Siemens vendor was discovered in fire alarm, Communication cable is not responding
coal handling MCC Room.

May 31,2019:
1.Warranty Notice N-2019-0134/N-2019-0135,Installation of the smo
and test was conducted. 2.Spare DLC ( Device Loop Card ) b
from TEC was installed at 3U-LFAP-2100-1019(STG).Siemens Vendor will send new DLC
replacement.
2 noticed that Siemens brought new smoke detector, but it is not the same as existing a
refused to accept different model number (Existing FD0421, New HFP-11).
4. Siemens have to provide
model number smoke detector total : 3PCs. DPI will install.
5.On May 31,2019 in the evening after replacement of the fire alarm netw
accidental discharge happens at JH-10 and 11 without any actual fire in the system.
No. Description

June 01, 2019:


1. Siemens Vendor conduct uploading again the existing program f
smoke detector ( existing SD ) at STG LFAP as per TEC request.
2. Identifying the RCA (
Cause Analysis ) for Coal Handling LFAP accidental discharge happens 31 May 2019.Si
Vendor think that the communication cable has problem causing the accidental discha
3 According to Siemens vendor findings in the event history and his recommendation th
communication cable need to be replace to prevent false alarms, Warranty Notice N-2
Still under observation.

Worri Environmental Techonlogy Engineer Mr. Lee Sang-Gyun, will leave the
May,2019.
Pagbilao 420 MW CFPP

DPI Camp Office

1-Jun-19

Vinod Kumar Prasad

Attendees:

Siemens

n Action By Remark

diamond hotel on May 29, 2019 late

ner for the action item.

nt of the fire alarm network device Panel


Crusher House)
ring the deluge valve simulation test. Siemens
nication cable is not responding properly,At

19-0135,Installation of the smoke detector


pare DLC ( Device Loop Card ) borrowed
mens Vendor will send new DLC to TEC as
3. Owner
t it is not the same as existing and owner Siemens
0421, New HFP-11).
4. Siemens have to provide existing
tall.
placement of the fire alarm network device,
any actual fire in the system.
n Action By Remark

ng again the existing program for FD0421


request.
2. Identifying the RCA ( Root
charge happens 31 May 2019.Siemens
m causing the accidental discharge.
tory and his recommendation that the Siemens
se alarms, Warranty Notice N-2019-0004

e Sang-Gyun, will leave the site on 09


Total Close Open Reject Item
12 11 0 1
ject Item