Professional Documents
Culture Documents
Removal of Sub-grade GSB CC M10 bed for Drains CC M15 for Dra
Colony Road Total
Unserveciable soil
ID length
L B D L B D MB ref L B D MB ref L B D MB ref L
MR1 - - -
MR2
17 & 18
137/A/PRI/
MR3 162.05 2014-15
206.40 -- d0--
MD Colony
MR4
IR1
IR2
IR3
IR4
IR5
IR6
IR7
IR8
IR9
CC M15 for Drains
Remarks
B D MB ref
1 Inspection report on deviations executed Sub-Grade,GSB,CC pavement
widths and depths against the IRC-SP62-2014 Code for various reaches.
3 The reaches executed are not tallying with the orinal sanctioned
reaches .Clarify the same duly submitting the reach wise strip map and
key map of the sanctioned and executed length of CC Pavements and
Drains.
Construction of CC roads and Drains to Internal roads in SC Locality of Palaparru GP in
Pedanandipadu Mandal.
Est Cost : Rs 275.00 Lakhs SCP 2015-16
SC (AMBEDKAR COLONY (MD) COLONY-1
Total Length
length executed
m m Mbook reference Remarks
MR1 10.00
MR2 117.00
70.90
The slushy and unserserviceable BC soil
MR3 53.00 between drain was removed to accodate
Pno 92 & 94 of MB No selected earth,GSB and CC road ie this soil
137/A/PRI/2014-15
64.00 lies upto and above the level of top drain
wall.
MR4 100.00
IR7 28.80
33.80
IR2 27.00
26.70
27.60
IR3 27.95
26.80
IR4 28.05
66.25
IR6 28.30
28.75
28.90
35.00
IR8 34.00
Total Length
length executed
m m Mbook reference Remarks
MR1 10.00
MR2 117.00
70.90
The slushy and unserserviceable BC soil
MR3 53.00 between drain was removed to accodate
Pno 92 & 94 of MB No selected earth,GSB and CC road ie this soil
137/A/PRI/2014-15
64.00 lies upto and above the level of top drain
wall.
MR4 100.00
IR7 28.80
33.80
IR2 27.00
26.70
27.60
IR3 27.95
26.80
IR4 28.05
IR8 28.20 The slushy and unserserviceable BC soil
between drain was removed to accodate
Pno 1 & 2 of MB No
IR5 28.00 selected earth,GSB and CC road ie this soil
084/A/PRI/2014-15 lies upto and above the level of top drain
27.90 wall.
66.25
IR6 28.30
28.75
28.90
35.00
IR8 34.00
Asst Executive Engineer
PRISD.,Prathipadu @ Guntur