Professional Documents
Culture Documents
Construction team work Hours (Previous Day) 227 500 Has the carne opt fullfill theDaily machine 159
364
Improper scaffolding(ID /TAGS etc)
546
Operational Team work Hours(Previous Day) 1208 using uninspected electrical cable
400
are the cylinder ,regulater stored /used 134
88
# of Recordable Accident (RIR) 0 total manpower Safety supervisor(PG izhar) at the
300 izhar Supervisor,engineer,are formen.etc 247
31
Unproper/uninspected sling/hoist/shackle.
# of Lost Time Accident (LTI) 1 353
200 Uninspected/damaged/broken fall…
Is the crane operation area clearly marked? 86
# of the lost days 0 Workers below the suspended load. 13
100
Is flagman available during the heavy vehicle… 64
LTI (Lost Time Incident) Frequency Rate 0.14739208 Not use LOTO where and when required.
630
0 Wearing bracelet, watch 1267
LTI (Lost Time Incident) Severity Rate 0 Housekeeping
Uproper waste storage 435
Using unproper ladder. 248