2 - 03. Horas Luas PDF
2 - 03. Horas Luas PDF
2
(CONTINUED)
The second HORAS project (HORAS 3000) is currently in the
planning stage. When completed, it will be capable of supplying
3,000 Million Litres per Day (MLD). The total land area involved is
about 4,200 hectares.
Both HORAS schemes can supply a total of 3,600 MLD when
completed.
The HORAS project will increase the yield and storage of water
resource of the State of Selangor and mitigate flooding in
downstream areas in Bestari Jaya.
The HORAS project can also be used in an emergency for the
dilution of pollution of the Selangor River and reduction of turbidity
through a sedimentation pond. Thus shutdown of treatment plants
can be avoided when there is a pollution incident.
3
FLOOD FLOW AT SELANGOR
RIVER
Based on the National Water Resources Study (2000-2050), a
hydrological analysis was carried out. From the analysis, the flood
flow rate at Selangor River Station (Department of Irrigation Station,
Rantau Panjang) for duration of 50 years (1960-2010) are as
follows:
i) 1 : 50 ARI (Average Recurrence Interval) is 461 m3/s
(39,830 MLD)
ii) 1 : 100 ARI is 541 m3/s (46,742 MLD).
iii) 7 day low flow is 9.856 m3/s (851 MLD).
The above flows shows that there are excess river flow that can be
diverted for storage at the Selangor River.
4
25000.00
RESIDUAL FLOW AT BESTARI JAYA BARRAGE (2005,2014,2015)
TAHUN 2005
TAHUN 2014
20000.00
TAHUN 2015
5000.00
0.00
1/1
8/1
5/2
5/3
2/4
9/4
7/5
4/6
2/7
9/7
6/8
3/9
15/1
22/1
29/1
12/2
19/2
26/2
12/3
19/3
26/3
16/4
23/4
30/4
14/5
21/5
28/5
11/6
18/6
25/6
16/7
23/7
30/7
13/8
20/8
27/8
10/9
17/9
24/9
1/10
8/10
15/10
22/10
29/10
5/11
12/11
19/11
26/11
3/12
10/12
17/12
24/12
31/12
PROPOSED HORAS 3000 PROJECT
Construction of the HORAS ponds is to be implemented
in stages (divided into 4 phases) where 5 ponds will be
constructed.
14
RASA
MBI
13.25 MLD Hang Tuah 6
10.54 MLD 43.2 MLD
15.70
475.2 MLD
MLD 43.2 MLD KG TIMAH
25.85 MLD
11 PUMPS 86.40 MLD 50 MLD
MBI
70 MLD 2 PUMPS
70 MLD Kambing Susu C
12.5
43.2MLD
MLD
Hang Tuah 5 50 MLD
43.2 MLD
Hang Tuah KS B 70 MLD
KL 24 MLD 86.4 MLD
120 MLD
LARUT Tmn Ilmu 24MLDMLD
103.20 Kambing Susu B 2 PUMPS
43.2 MLD 48 MLD
20 MLD KS A 12 MLD
43.2 MLD 2 PUMPS
20 MLD 12 MLD
259.2 MLD
86.4 MLD 50 MLD
6 PUMPS
2 PUMPS HT KS A 20 MLD
48 MLD
1 PUMP TC
TAN CHONG
48 MLD 20 MLD
172.4 MLD
KL Larut 20 MLD
X 10MLD 4 PUMPS
13.08 Rantau Panjang
UNITMLD
12.31 JPS Station
480
20 MLD (TOTAL PUMPS CAPACITY)
MLD Pam sedia ada
70 MLD
10 HORAS HORAS 600 (1,934 MLD)
Pam tambahan 50 MLD : Pada 4/7/2014
26 MLD
PUMPS 12MLD 24 HOURS SUSTAINED CAPACITY
Pam tambahan 20 MLD : Pada 10/7/2014
192MLD
12.65 MLD 1,742 MLD
TOTAL
20 MLD Pam tambahan 70 MLD : Pada 21/7/2014
SSP 1, SSP 2 & 8 PUMPS
70 MLD Pam tambahan 70 MLD : Kolam ke Sg
SSP 3 70 MLD 48 NOS. OF PUMPS
(3,000 MLD) Pam tambahan 70 MLD : Kolam ke Kolam
10 NOS. OF PONDS
PUMPING OPERATION FROM ALTERNATIVE PONDS TO
SELANGOR RIVER FOR THE YEAR 2017
HT 2
HT 3
HT 4
28