Design Data fy 250
Span Of Beam = 6.2 m fck 25
Spacing Of Beam = 2.111 m Slab Cover 20
Grade Of Steel = 250 N/mm²
Thickness Of Slab ds = 80 mm
α = 24.17
As = Area Of Steel = 5776.26 mm2
Xu = depth of plastic neutral axis PNA
Let Us Provided
ISMB 300 Section @ 0.46 Kn/m
Area A = mm2
D = 300 mm d= 273.8 mm
bt = 140 mm
tt = 13.1 mm
t = 7.7 mm
Moment Capacity Mp = 0.87 fy ( As (dc + 0.08 ds) - B(Xu -ds)(Xu + 0.16 ds))
= 240159739.2
= 240.16 Kn-m
Md / M u = 0.27 OK
DATE
Pratap Parikh
GRG Accessories Pvt. Ltd. PREP BY-
Associates CHKD BY-
Design Of Composite Beam APPD BY-
Let Us Provided
ISMB 600 Section @ 1226 N/m
Area A = 15621 mm2
D = 600 mm
B = 210 mm
T = 20.8 mm
t = 12 mm
Ixx = 918130000 mm4
Iyy = 26510000 mm4
Zxx = 3060400 mm3
Zyy = 252500 mm3
Depth of Stem Of T Section = 150
* Take Moment Of Area About Top Edge Of T -Section to Find Neutral Axis
Ӯ = 30.05 mm
N/mm2
N/mm2
mm
0.36 * 25 * 1.55 * 80
s
+ 0.87 * fy * tt * bt
* 140 * 13.1
###
R.S.
- 0.87 * fy - bt * tt
140 * 13.1