You are on page 1of 2

Bar Bending Schedule GOHAR

ZAMAN
Steel Weight Calculator AE-E(PRJ)

Dia Spacing
Total Cut Length (Mtr)
S.no Bar Referance (mm) (Cm) No's No's in
each T.No's C/L Shape Remarks
6 mm 8 mm 10 mm 12mm 14 mm 16 mm 20 mm

1
640
Top main bars 16 - 2 4 8 24.20 40 40
178 850 850

Bottom main bars 12 - 2 4 8 25.50 40 640 40


435 545 640 595

Side rebar 10 - 2 2 4 21.40 10.7


10.7
38
Stirrups 10 - 4 88 352 1.80 42

2 TR_P2_02,03 & 04
640
Top main bars 20 - 3 4 12 24.20 40 40
850 850

Bottom main bars 20 - 3 4 12 25.50 40 640 40


545 640 595

Side rebar 10 - 3 2 6 21.40 10.7


10.7
38
Stirrups 10 - 3 116 348 1.88 42

U-Rebar for Tr_P2_03 20 - 1 32 32 1.65

U-Rebar for Tr_P2_02 &


20 - 2 32 64 1.50
04

3 TR_P2_07,08 & 09
590
Top main bars 20 - 3 3 9 22.20 40 40
775 775
Page 1 of 2
Bottom main bars 20 - 3 3 9 23.50 40 590 40
585 590 585

Side rebar 10 - 3 2 6 19.40


22
Stirrups 10 - 3 84 252 1.48 42

L shape Rebar for 20 - 2 8 16 0.75


Tr_P2_07 & 09

4 TR_P2_06 & 10 0
590
Top main bars 20 - 2 4 8 22.20 40 40
775 775

Bottom main bars 20 - 2 4 8 23.50 40 590 40


585 590 585

Side rebar 10 - 2 2 4 19.40 9.7


9.7
38
Stirrups 10 - 2 108 216 1.88 42

Total length = 0 0 0 435 0 178 0

Weight per meter length 0.222 0.395 0.617 0.888 1.209 1.579 2.467

Weight of steel 0 0 0 386.28 0 281.06 0

Total weight in Kgs 667.342

Total weight in M.ton 0.667

Page 2 of 2