GENERAL NOTES LEGEND & SYMBOLS ABBREVIATIONS

SYMBOL DESCRIPTIONS (E) EXISTING KWH KILO WATT HOUR


1. ALL ELECTRICAL WORKS SHALL COMPLY WITH LATEST EDITION OF PHILIPPINE ELECTRICAL CODE. LIGHTING SYSTEM NOTES:
THE NEW ELECTRICAL ENGINEERING LAW (R.A. 7920), LAWS AND ORDINANCES OF THE LOCAL
POWER (N) NEW LPS LOW PRESSURE SODIUM
GOVERNMENT UNIT AND RULES AND REGULATIONS OF THE LOCAL ELECTRICAL POWER UTILITY. 1. THE ELECTRICAL CONTRACTOR TO SUPPLY OWNER WITH COMPLETE AS-BUILT
DRAWINGS AND PRODUCT MAINTENANCE MANUALS AT THE COMPLETION OF PROJECT. DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET W/ GROUND (R) REMOVED LV LOW VOLTAGE
2. ELECTRICAL CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS PRIOR TO BID. ANY
DISCREPANCIES BETWEEN DRAWINGS FOUND DURING INSTALLATION SHALL BE BROUGHT TO THE 2. THE ELECTRICAL CONTRACTOR SHALL COORDINATE AND VERIFY WITH OTHER TRADES GFCI (RR) REMOVED AND RELOCATE M METER OR MOTOR
DUPLEX RECEPTACLE OUTLET, GFCI, 16A, 250V, UNIVERSAL OUTLET WITH GROUND
ENGINEERING CONSULTANT’S ATTENTION AND SHOULD BE RESOLVED. THE EXACT LOCATION OF EACH LIGHTING FIXTURE PRIOR TO INSTALLATION.
WP DUPLEX RECEPTACLE OUTLET, WEATHERPROOF, 16A, 250V, GROUNDING TYPE A AMPERES MCB MAIN CIRCUIT BREAKER
3. ELECTRICAL CONTRACTOR TO SUPPLY OWNER WITH COMPLETE AS-BUILT DRAWINGS AND 3. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH OTHER TRADES THE LAYOUT
PRODUCT MAINTENANCE MANUALS AT COMPLETION OF PROJECT. OF CABLE CONTAINMENT/TRUNKING PRIOR TO INSTALLATION. REF DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET W/ GROUND, AMPERE FRAME (RATING)
AF MCC MOTOR CONTROL CENTER
DEDICATED FOR REFRIGERATOR AMPERE FUSE (RATING)
4. ALL WIRING INSTALLATION SHALL BE IN CONCEALED CONDUIT/ TRUNKING UNLESS OTHERWISE 4. ALL LIGHTING CIRCUITS SHALL BE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR.
SPECIFIED. MW DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET WITH GROUND, DEDICATED AFF ABOVE FINISH FLOOR MCP MOTOR CIRCUIT PROTECTOR
IF ANY DISCREPANCIES WITH SWITCHING LAYOUT, VERIFY ARCHITECT.
FOR MICROWAVE.
5. ALL WIRE TO BE THHN/THWN COPPER, STRANDED EXCEPT WHERE NOTED OTHERWISE. DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET W/ GROUND, AFG ABOVE FINISH GRADE MLO MAIN LUGS ONLY
5. VERIFY THE TYPE OF CEILING SYSTEM WITH GENERAL CONTRACTOR OR CEILING TEL/DATA
CONTRACTOR. PROVIDE FIXTURES WHICH ARE COMPATIBLE WITH THE CEILING SYSTEM DEDICATED FOR TELEPHONE & DATA BACKBOARD
6. ALL DEVICES AND EQUIPMENT INSTALLED OUTDOORS OR EXPOSED TO WEATHER SHALL BE OF AHU AIR HANDLING UNIT MOCP MAIN OVERCURRENT PROTECTION
AND INCLUDE ALL REQUIRED MOUNTING ACCESSORIES AND HARDWARE. DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET W/ GROUND,
WEATHERPROOF CONSTRUCTION. GP
DEDICATED FOR GAS SUPPRESSION PANEL AL ALUMINUM MV MEDIUM VOLTAGE
6. ALL SWITCH LOCATIONS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO ROUGH-IN.
7. THE ELECTRICAL PLANS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL OF FACP DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET WITH GROUND, DEDICATED
AS AMPERE SWITCH MVA MEGA VOLT AMPERES
THE ARCHITECTURAL DETAILS OR SPECIFICS OF ELECTRICAL CONSTRUCTION. TAKE ALL 7. ALL EXIT SIGNS SHALL BE READILY VISBILE FROM ANY DIRECTION OF EGRESS TRAVEL. FOR FACP
DIMENSIONS FROM THE ARCHITECTURAL DRAWINGS. ATS AUTOMATIC TRANSFER SWITCH NEC NATIONAL ELECTRICAL CODE
8. ANY FIXTURE SUBSTITUTION MUST BE APPROVED BY THE OWNER PRIOR TO BID. FABP DUPLEX RECEPTACLE OUTLET, 16A, 250V, UNIVERSAL OUTLET WITH GROUND, DEDICATED
8. THE PHASE COLOR CODING OF THE INSULATION OF CONDUCTORS SHALL BE: FOR FABP
AWG AMERICAN WIRE GAUGE PEC PHILIPPINE ELECTRICAL CODE
FOR THREE PHASE CIRCUITS: 9. PROVIDE 90 MINUTE MINIMUM EMERGENCY BATTERY PACK FOR EXIT SIGN.
PHASE A – RED GROUND – GREEN/BARE RANGE SPECIAL PURPOSE OUTLET 60A, 250V, DEDICATED FOR RANGE
BAT BATTERY NIC NOT IN CONTRACT
PHASE B – YELLOW NEUTRAL - WHITE 10. ALL QUANTITIES SHALL BE VERIFIED PRIOR TO BID. NOTIFY ENGINEER FOR ANY
PHASE C - BLUE DISCREPANCIES IN DRAWINGS. J JUNCTION BOX C CONDUIT NTS NOT TO SCALE

FOR SINGLE PHASE CIRCUITS: 11. ROUTE ALL EXTERIOR LIGHTING CIRCUITS VIA LIGHTING CONTROL PANEL VIA LCP. J HD JUNCTION BOX, DEDICATED FOR HAND DRYER CB CIRCUIT BREAKER OC ON CENTER
PHASE – RED ELECTRICAL CONTRACTOR TO PROVIDE LIGHTING CONTROL PANEL WITH
GROUND – GREEN/BARE DISCONNECT SWITCH, RATING AS NOTED CCTV CLOSED CIRCUIT TELEVISION OL OVERLOAD
ASTRONOMICAL TIME CLOCK, LCD DISPLAY AND PHOTO CELL SWITCHING. VERIFY
NEUTRAL – WHITE LOCATION WITH THE OWNER PRIOR TO INSTALLATION.
DISTRIBUTION BOARD

IG ISOLATED GROUND
18. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE ELECTRICAL LOAD BALANCING
POE SWITCH
AND LABELLING OF ALL EQUIPMENT AND SWITCHBOARDS THROUGHOUT THE INSTALLATION. ISC SHORT-CIRCUIT CURRENT

19. THE ELECTRICAL CONTRACTOR TO PROVIDE GROUNDING ELECTRODE SYSTEM. GROUND KAIC KILO AMPERE INTERRUPTING CAPACITY
ELECTRODE RESISTANCE SHALL COMPLY WITH THE LATEST EDITION OF PHILIPPINE ELECTRICAL CCTV RACK
CODE. KV KILO VOLT

20. ALL DISCHARGE LIGHTING FIXTURE SHALL BE COMPLETED WITH BUILT-IN CONTROL GEAR, LAMP, IP BASED CEILING MOUNTED CCTV CAMERA
KVA KILO VOLT AMPERE
LOW-LSS BALLAST, ETC.
IP BASED WALL MOUNTED CCTV CAMERA KVAR KILO VAR
21. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR SEALING OF ALL CABLE/RACEWAY
PENETRATION WITH APPROVED FIRE RATING MATERIAL/SEALANT. KW KILO WATT
SWITCHING
22. THE ELECTRICAL CONTRACTOR TO PROVIDE GROUND FAULT AND OVERCURRENT TRIPPING Sa SINGLE POLE SWITCH 15A, 230VAC, "a" INDICATES CONTROL
DISCRIMINATION BETWEEN THE SWITCHBOARD AND THE INCOMING FEEDER TO COMPLY WITH
THE LOCAL POWER UTILITY COMPANY REQUIREMENTS. S3Wa THREE-WAY SWITCH 15A, 230VAC, "a" INDICATES CONTROL

23. THE ELECTRICAL CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR MATERIALS AND
EQUIPMENT FOR SATISFACTORY COMPLETION OF ALL ELECTRICAL INSTALLATION AS GENERALLY
DESCRIBED IN THE SPECIFICATION AND/OR AS SHOWN IN THE DRAWINGS.

24. ALL SWITCHBOARDS AND PANELBOARDS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE.

25. EACH CIRCUIT SHALL UNDERGO INSULATION RESISTANCE TESTING BY APPLYING A VOLTAGE OF
NOT LESS THAN 1000V D.C. UPON CIRCUIT UNDER TEST.

26. ALL INSULATION RESISTANCE TEST SHALL BE CARRIED OUT WITH A 1000V MEGGER TEST
INSTRUMENT AND IN ACCORDANCE WITH THE LATEST PHILIPPINE ELECTRICAL CODE
REQUIREMENTS.

27. LIGHTNING PROTECTION SYSTEM SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST
EDITION OF THE PHILIPPINE ELECTRICAL CODE.

28. UPON COMPLETION OF ELECTRICAL CONSTRUCTION WORKS, NECESSARY TESTING SHALL BE


PERFORMED BY THE CONTRACTOR INCLUSIVE INSTALLATION TO BE REPORTED IN DETAILS AND
IN FORMS APPROVED BY THE OWNER’S REPRESENTATIVE.