.1 RIGID GALVANIZED STEEL, WITH THREADED FITTINGS, WHERE SUBJECT TO .1 THE VEHICLE STORAGE AREA, AND ADJACENT ROOMS, UP TO A LEVEL OF 50mm EXISTING
1 GENERAL: MECHANICAL INJURY, IN SERVICE AREAS ONLY. ABOVE THE FLOOR SHALL BE CONSIDERED A CLASS I (FLAMMABLE GASES OR ELECTRICAL PANEL
.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, .2 ELECTRICAL METALLIC TUBING (EMT), HOT DIPPED GALVANIZED STEEL, WITH VAPOURS) ZONE 2 LOCATION.
AND THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FOR THREADED CONNECTORS AND COUPLINGS, WHERE NOT SUBJECT TO .2 ALL ELECTRICAL EQUIPMENT USED WITHIN THE AREA SHALL BE APPROVED FOR
CONSTRUCTION PROJECTS. MECHANICAL INJURY, IN SERVICE AREAS ONLY. THE CLASSIFICATION. ZONE 9
.2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING: .3 ALL WIRING PRACTISES SHALL BE DONE IN ACCORDANCE WITH THE ONTARIO
.1 ONTARIO ELECTRICAL SAFETY CODE; 6 WIRES AND CABLE: ELECTRICAL SAFETY CODE FOR THE ABOVE CLASSIFICATION. Ex
.2 ELECTRICAL SAFETY AUTHORITY. .1 VOLTAGE DROP: TOP OF WOMEN'S
.3 SUBMIT TO MUNICIPAL BUILDING DEPARTMENT AND ELECTRICAL SAFETY .1 BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR A MAXIMUM VOLTAGE 12 EQUIPMENT SUPPORT: ELEVATOR SHAFT CEILING WR ZONE 8
AUTHORITY, NECESSARY NUMBER OF DRAWINGS AND SPECIFICATIONS FOR DROP OF 3% AT DESIGN LOAD. .1 ALL ELECTRICAL AND FIRE ALARM EQUIPMENT, CONDUIT, WIRING, DEVICES, CHANGE
Ex
APPROVAL PRIOR TO COMMENCEMENT OF WORK. .2 BUILDING WIRES IN CONDUIT SYSTEMS TO BE STRANDED COPPER CONDUCTORS AND RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED AND
.4 PAY ALL PERMIT AND INSPECTION FEES. FOR 10 AWG AND LARGER, MINIMUM SIZE 12 AWG, TYPE RWU90. FASTENED TO BUILDING STRUCTURE.
.5 GROUND COMPLETE SYSTEM IN ACCORDANCE WITH THE ONTARIO ELECTRICAL .3 ALL WIRING SHALL BE CONCEALED IN WALLS AND CEILINGS, UNLESS .2 HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN STOR
SAFETY CODE AND ELECTRICAL SAFETY AUTHORITY. OTHERWISE NOTED OR APPROVED. SURFACE-MOUNTED WIRING IS PERMITTED ACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS - Ex EXISTING
.6 IDENTIFICATION AND LABELLING: WHERE APPROVED BY OWNER. MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, AND MEN'S ELECTRICAL PANEL
.1 CLEARLY IDENTIFY BRANCH CIRCUIT SUPPLY TO FIRE ALARM SYSTEM. INSTALLATION. WR
.7 PROVIDE THREE COPIES OF COMPLETE OPERATING AND 7 LIGHTING: Ex
MAINTENANCE INSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER .1 EXIT AND EMERGENCY LIGHTING: 13 COORDINATION: F
THIS CONTRACT. BIND INSTRUCTIONS IN 3-RING BINDERS. INCLUDE THE .1 CONNECT DC CIRCUIT FROM EMERGENCY LIGHT BATTERY .1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL
FOLLOWING: PACK TO ALL EXIT AND EMERGENCY LIGHTS. BE TAKEN FROM SITE BY CONTRACTOR. Ex
.1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS. .2 SIZE EMERGENCY LIGHTING POWER PACK TO PROVIDE FULL .2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF BAR
.2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING WIRING LOAD POWER FOR THE FOLLOWING PERIOD - 30 MIN. WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICAL KITCHEN
OF COMPONENTS. .3 EMERGENCY LIGHT BATTERY PACKS (UNIT EQUIPMENT) SHALL BE LOCATION OF ALL EQUIPMENT WITH OWNER AND ALLOW FOR ANY ADDITIONAL
.3 WIRING DIAGRAM OF CONTROL PANELS. INSTALLED IN SUCH A MANNER THAT IT WILL BE AUTOMATICALLY CONDUIT, WIRING, FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOID
.4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN ACTUATED UPON FAILURE OF THE POWER SUPPLY TO THE NORMAL INTERFERENCE AND FACILITATE THE WORK.
PROCEDURE. LIGHTING IN THE AREA COVERED BY THAT UNIT EQUIPMENT PER OESC .3 ALL DEVICE AND OUTLET LOCATIONS SHALL BE CAREFULLY COORDINATED Ex
.5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE 46-304(4). WITH THE OWNER, TO ACCOMMODATE ALL ARCHITECTURAL AND EQUIPMENT
INSTRUCTIONS FOR COMPONENTS OF THE EQUIPMENT. FEATURES.
.6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS, 8 FIRE ALARM SYSTEM: Ex
SHOWING MANUFACTURER'S NAME, CATALOGUE NUMBER, AND NEAREST .1 FIRE ALARM SYSTEM VERIFICATION CONTRACTOR SHALL REVIEW THE 14 START-UP, COMMISSIONING AND TRAINING:
REPLACEMENT SOURCE. DRAWINGS AND SHALL NOTE ALL AREAS OF DEVICE DEFICIENCY, PRIOR TO .1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:
.7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TO BE COMPLETION OF EQUIPMENT AND WIRING ROUGH-IN. .1 EXIT AND EMERGENCY LIGHTING;
STOCKED. .2 FIRE ALARM SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH .2 FIRE ALARM.
.8 MANUFACTURERS' WARRANTIES AND GUARANTEES. .2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS
.8 CLEAN ALL ELECTRICAL SYSTEMS AT PROJECT COMPLETION. .3 FIRE ALARM SYSTEM SHALL BE VERIFIED IN ACCORDANCE WITH CAN/ULC-S537, FOLLOWS:
.9 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK .1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS,
PROGRESSES. .4 FIRE ALARM SYSTEM MONITORING STATION CONNECTION SHALL NOTIFY THE DESIGN CRITERIA AND INTENT, AND MANUFACTURER'S REQUIREMENTS;
FIRE DEPARTMENT BY WAY OF SIGNALS TO A CENTRAL STATION CONFORMING .2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;
2 CONTRACTOR QUALIFICATIONS: .3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF.
.1 .3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL
.5 FIRE ALARM SYSTEM SHALL BE PROVIDED WITH AN EMERGENCY POWER DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUM PERFORMANCE.
WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (AS SUPPLY, WITH IMMEDIATE AUTOMATIC TRANSFER, IN ACCORDANCE WITH OBC .4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT
APPLICABLE): 3.2.7.8. OPERATIONAL CONDITIONS AND PARAMETERS.
.1 ELECTRICIAN: CONSTRUCTION & MAINTENANCE; .6 FIRE ALARM CONTROL AND ANNUNCIATOR PANEL SHALL HAVE SUFFICIENT
.2 ELECTRICIAN: DOMESTIC & RURAL. POWER FOR UP TO 25% ADDITIONAL AUDIBLE DEVICES. ZONE 7
.2 ALL FIRE ALARM SYSTEM WORK SHALL BE PERFORMED BY PERSONS WHO HOLD .7 ELEVATOR EMERGENCY RETURN (OBC 3.2.4.15):
ELECTRICIAN QUALIFICATIONS (ABOVE), AND IN ADDITION, WHO HOLD THE .1 PROVIDE CONNECTION FROM THE FIRE ALARM CONTROL PANEL TO THE HALL
FOLLOWING CURRENT REGISTRATION WITH THE CANADIAN FIRE ALARM ELEVATOR CONTROLLER, AS FOLLOWS:
ASSOCIATION (CFAA): .1 TO RECALL THE ELEVATOR TO MAIN FLOOR FOR AN ALARM CONDITION PEAK
.1 FIRE ALARM TECHNICIAN. WHICH DOES NOT OCCUR IN THE ANNUNCIATION ZONE CONTAINING
THE MAIN FLOOR ELEVATOR LANDING SMOKE DETECTOR.
3 EXISTING FACILITIES AND DEMOLITION: .2 TO RECALL THE ELEVATOR TO THE SECOND FLOOR FOR A GENERAL
.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES. ALARM CONDITION THAT DOES OCCUR IN THE ANNUNCIATION
.2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING ZONE CONTAINING THE MAIN FLOOR ELEVATOR LANDING SMOKE
FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THIS WORK. DETECTOR.
.3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THE
OWNER. 9 FIRE PROTECTION:
.4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TO .1 ALL CABLING AND CONDUIT SHALL BE TIGHTLY FITTED AND SEALED WITH
NORMAL USE OF THE EXISTING BUILDING. FIRESTOPPING MATERIAL AT ALL FLOORS, WALLS AND CEILINGS.
.2 ALL MATERIALS WITHIN PLENUMS SHALL A FLAME-SPREAD RATING NOT MORE
4 FIXTURES AND EQUIPMENT: THAN 25 AND A SMOKE DEVELOPED CLASSIFICATION NOT MORE THAN 50.
BEAM
BEAM
.1 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL ELECTRICAL FIXTURES
AND EQUIPMENT FOR APPROVAL, PRIOR TO PROCUREMENT. 10 EARTHQUAKE LOAD:
.2 INSTALL ALL ELECTRICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH .1 ALL ELECTRICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS. EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDING CODE.
.3 EQUIPMENT AND MATERIAL TO BE CSA CERTIFIED. WHERE THERE IS NO .2 ELECTRICAL ELEMENTS AND COMPONENTS (FIXTURES, EQUIPMENT, CONDUIT,
ALTERNATIVE TO SUPPLYING EQUIPMENT WHICH IS NOT CSA CERTIFIED, OBTAIN ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BE CONSTRUCTED IN
. . . .
SPECIAL APPROVAL FROM ELECTRICAL SAFETY AUTHORITY. ACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OR OTHER
GUIDELINE REFERENCED IN THE ONTARIO BUILDING CODE. 3 MP 2016-05-18 FOR TENDER
MACH RM WR WR
COORDINATE
INSTALLATION ZONE 4
WITH ELEVATOR NORTH LOBBY/WASHROOMS
CONTRACTOR
STOR STOR STORAGE ROOMS BELOW STADIUM STANDS
LEGEND
ZONE 5
ARENA DISTRIBUTION PANEL 72"/1825mm (TOP)
ARENA EXIT LIGHT, SURFACE MOUNTED, SINGLE FACE 90"/2300mm
Vertical: AS SHOWN
E1