Professional Documents
Culture Documents
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning of NH-31 D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur - Salsalabari section in the State of West Bengal on EPC mode
SUMMARY OF REVISIONS
Approved By
Description of
Rev Date
modification/revision
Name/Position Signature
D. Ray
D0 29.11.2019 For review
Design Director
NMDC–RLIANCE–RIZZANI JV
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal
Pier_P5_8.2m_123+518_9pile
Content
Annex _I Confinement RF
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1 Inputs:
16.00 Traffic
Direction
FRL 0.00%
+67.354
45.69m span 45.69 m span
2.40 4.1m
6.4m
6.979
GL 57.70
56.78
3.17
2.25
54.53
Super Structure
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design height of pier = 7.80 m
Dimension of Pier along traffic = 1.80 m
Dimension of Pier across traffic = 6.40 m LWL (RL) = +57.70
Scour level HFL = +50.69 m Scour level HFL-S = 51.73
HFL (RL) = +61.15 m Scour level LWL-S = 52.78
Max depth of scour = 10.46 m from HFL
Foundation
Pile - Diameter = 1.5 m Type of Foundation = PILE
No of Pile = 9.0 Nos
Pile cap/Footing -Along Traffic Direction = 10.8 m
Pile cap /Footing -Across Traffic Direction = 11.4 m
Pile cap - Depth = 2.3 m Footing depth at tip = 2.25 m
Min Thickness of soil above pile cap = 0.9 m offset from pier = 0 mm
Materials Modulur ratio = 10
Unit weight of PSC = 25 kN/m3
Unit weight of RCC = 25 kN/m3
Unit weight of Wearing course = 22 kN/m3
Unit weight of Soil fill = 20 kN/m3
Grade of Concrete for Pier = 35 N/mm²
Grade of Concrete for Piles (or Open Foundation) = 35 N/mm²
Grade of Steel used = 550 N/mm²
Load Calculation
1.1 Dead Load
1.1.1 SuperStructure
Load from Span 1
Total Weight = (360.2)×25.0 DL Extra Factor 1.05
Reaction on Bearing(Outer bearing) = 6338 kN
Total SIDL
Reaction (Outer Bearing) = 1268 kN
Reaction (Inner Bearing) = 1268 kN
Total reaction = 2536 kN
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.2 Live Load
Free bearing
u(Rg+Rq) 506 kN 405
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4 Seismic force
Calculation of Seismic coefficients
Z Sa
g
2
Ah
R
I
Importance factor , I = 1.20
Zone Factor, Z (for Zone II) = 0.36
Response reduction factor, R Long- direction = 3.00
Response reduction factor, R Trans - direction = 3.00
Fundamental natural period
D
T 2 (Annexure D , IRC:6-2017)
1000 F
D= Appropriate dead load of the superstructure and live load in kN
F = Horizontal force in kN required to be applied at the centre of mass of the superstructure for one mm
horizontal deflection at the top of the pier for the earthquake in the transverse direction
and the force to be applied at the top of the bearings for the earthquake in the longitudinal direction
1.4.1 Calculation of Stiffness
Pier
Dimension of Pier - Longitudinal direction = 1.80 m
Dimension of Pier - Transverse direction = 6.40 m
Pier - design height = 7.80 m
Grade of concrete = M 35
4
M.I in longitudinal direction IL (0.75 Cracked MOI) = 2.333 m =(6.40×1.80^3)/12
4
M.I in transverse direction IT (0.75 Cracked MOI) = 29.491 m =(1.80×6.40^3)/12
Modulus of elasticity of concrete E = 32000 N/mm2 (IRC:112-2011 Table 6.5)
Stiffness in trans direction K1T = 3EI/H3
=6×32000×1000×29.491/((8.15^2)×((3×(1.38))+(2
= 3270004 kN/m
×8.15)))
Total Stiffness
Stiffness " k " = 1/(1/k1+1/k2)
Stiffness in Longitudinal direction "KL" = =1/(1/413691+1/353808)
= 190707 kN/m
= 190.71 kN/mm 413.6908483
Stiffness in transverse direction "KT" = 1/(1/3270004+1/353808)
= 319264 kN/m
= 319.26 kN/mm 3270.003886
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4.2 Calculation of Seismic coefficient in the Longitudinal direction
D = 15212 kN
T = 0.384 (eq-1)
Sa/g = 2.500 2.50 for square pier link with this
= 2.500 for wall type pier full Sa/g considered
Horizontal accelaration longitudinal " AhL " = (Sa/g)*(Z/2)/(R/I)
= 0.180 =(0.36/2)×(2.500)/(3.00/1.20)
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017
T = 0.139 (eq-1)
Sa/g = 2.500
Horizontal acceleration Transverse " AhT " = (Sa/g)*(Z/2)/(R/I)
= 0.180 (=(0.36/2)×2.500/(3.00/1.20))
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
= 314 kN
Longitudinal wind load (FL) = 79 kN
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
h/b = 1.08
d/b = 0.281
Drag Coefficient (CD) = 2.20
2
Exposed area of substructure (A1) = 14 m
2
Wind pressure (Pz) = 777.6 N/m
Transverse wind load (FT) Pz x A1 x G x CD = 48 kN
h/b = 3.82
d/b = 3.556
Drag Coefficient (CD) 1.482222222 = 1.14
2
Exposed area of substructure (A1) = 84.6 m
2
Wind pressure (Pz) = 777.6 N/m
Longitudinal wind load (FL) = 151 kN
Variation of velocity with depth (at HFL -S) (at HFL -N)
(at HFL) 6.06 6.06 kN/m2
HFL
10.5 4.37
3.25 3.53 kN/m2 Pier bottom
1.80 9.41 2.22 kN/m2 Pile bottom
SCOUR LEVEL
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity
Bottom of footing level 2.2 0.940 =2.2×0.940 2.09 0.342 =2.2×0.342 0.76
1.209969789
Bottom of footing level 1.8 0.940 =1.8×0.940 1.69 0.342 =1.8×0.342 0.62
1.232648635
Longitudinal Forces & Moments:
1.232648635
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Buoyancy : LWL
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.52 Load Combination at the Top of Pier cap for ULS condition
7 Group III (Case-1) Seismic Transverse 18713 4243 169 7578 268
Refer Annexure
8 Group III (Case-2) Seismic Transverse 18625 4205 169 7314 429
9 Group III (Case-3) Seismic Transverse 18635 4195 169 8144 293
1.53 Load Combination at the Top of Pier cap for SLS condition
W1
0.750
0.750
W2 Traffic Direction
5.38
W3
6.40 1.80
0.92
2.25 m
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Load of Pier
W2 Area of flared portion (top) = 52.89 m2 Pedestal :
Area of flared portion (bot.) = 29.52 m2 Width = 1.100 m
Height of flared portion = 0.75 m Length = 1.100 m
Volume of flared portion = 30.5 m3 P (KN) e (m) from Pier Base
CG of the flared portion from top of straight
= 0.42 m 762.02 6.72
portion of pier
W3 Width = 6.40 m
Breadth = 1.80 m
Area of c/s of straight portion = 11.520 m2
Total Height of straight portion = 6.30 m =7.80-0.75-0.75
Volume of straight portion = 72.576 m3 P (KN) e (m) from Pier Base
1814.4 3.15
W1 Pier Cap
Length of pier cap = 12.90 m
Width of pier cap = 4.1 m
Avg.Thickness of pier cap = 0.75 m P (KN) e (m) from Pier Base
Volume of pier cap = 39.6675 m3 991.6875 7.425
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
8.4 Dead Load of Superstructure 0 0 0 0.00 0.00 0 0
8.5 Dead Load of Substructure 3568 0 0 0.00 0.00 0 0
8.6 Seismic Load Superstructure 0 0 0 9.11 0.00 0 0
8.7 Seismic Load Substructure 0 0 0 5.10 0.00 0 0
LWL - Case
Moment Resultant
P Horizontal Force (kN) Moment (kN-m) kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1 service-Rare) 20570 384 1350 5805 11773 13127
2 Group I (Case-2 service-Rare) 20000 217 1350 3343 12579 13015
3 Group I (Case-3 service-Rare) 20020 384 1350 9612 11897 15294
4 Group II (Case-1 wind load-Rare) 19725 639 1177 7919 10018 12771
5 Group II (Case-2 wind load-Rare) 19298 362 1177 1863 10010 10182
6 Group II (Case-3 wind load-Rare) 19312 639 1177 8324 9499 12630
7 Group III (Case-1 Service-Frequent) 20151 320 1028 4678 8938 10088
8 Group III (Case-2 Service-Frequent) 19724 181 1028 2672 9542 9909 Refer Annexure
9 Group III (Case-3 Service-Frequent) 19738 320 1028 7533 9031 11760
10 Group IV (Case 1 Wind Load-Frequent) 18957 384 413 4273 3392 5455
11 Group IV (Case 2 Wind Load-Frequent) 18843 217 413 2244 3553 4202
12 Group IV (Case 3 Wind Load-Frequent) 18847 384 413 5034 3417 6084
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - Case
4 Group II(Case-1) Wind Load 26980 959 1795 11927 15290 19391
5 Group II(Case-2) Wind Load 26324 544 1795 6503 16216 17471
6 Group II(Case-3) Wind Load 26347 959 1795 16304 15431 22449
7 Group III (Case-1A) Seismic Transverse(-V) 25212 5209 1690 45590 13612 47578
Refer Annexure
8 Group III (Case-1B) Seismic Transverse(+V) 27295 5209 1690 45590 13612 47578
9 Group III (Case-2A) Seismic Transverse (-V) 25106 5171 1690 45026 13773 47085
12 Group III (Case-3B) Seismic Transverse(+V) 27175 5161 1690 45780 13636 47768
18 Group V (Case-1A) Seismic Vertical(-V) 22782 1563 1690 13945 13612 19487
18 Group V (Case-1B) Seismic Vertical(+V) 29724 1563 1690 13945 13612 19487
18 Group V (Case-2A) Seismic Vertical(-V) 22694 1551 1690 13700 13773 19426
18 Group V (Case-2B) Seismic Vertical(+V) 29585 1551 1690 13700 13773 19426
18 Group V (Case-3A) Seismic Vertical(-V) 22704 1548 1690 14535 13636 19930
18 Group V (Case-3B) Seismic Vertical(+V) 29582 1548 1690 14535 13636 19930
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL- Case
Horizontal Force (kN) Moment (kN-m) Moment Resultant
P kNm
S.No Load Combination Remark
(kN) HT HL MT ML
4 Group II(Case-1) Wind Load 26920 995 1841 12011 15399 19529
5 Group II(Case-2) Wind Load 26265 579 1841 6587 16325 17604
6 Group II(Case-3) Wind Load 26287 995 1841 16389 15540 22585
7 Group III (Case-1A) Seismic Transverse(-V) 24814 5255 1739 45698 13727 47715 Refer annex
8 Group III (Case-1B) Seismic Transverse(+V) 26897 5255 1739 45698 13727 47715
9 Group III (Case-2A) Seismic Transverse (-V) 24708 5217 1739 45134 13888 47222
12 Group III (Case-3B) Seismic Transverse(+V) 26777 5207 1739 45889 13751 47905
20 Group V (Case-1B) Seismic Vertical(+V) 29327 1601 1739 14036 13727 19632
21 Group V (Case-2A) Seismic Vertical(-V) 22296 1589 1739 13791 13888 19572
22 Group V (Case-2B) Seismic Vertical(+V) 29187 1589 1739 13791 13888 19572
23 Group V (Case-3A) Seismic Vertical(-V) 22307 1586 1739 14626 13751 20075
24 Group V (Case-3B) Seismic Vertical(+V) 29185 1586 1739 14626 13751 20075
11.52 123
1.60 Summary of Load at pile cap bottom Footing 277
Depth of pile cap /Open foundation = 2.25 W1 6926 e1 1.125
Height from Piercap Top = 10.05 m W2 0 e2 2.250
Dead load of the Pier at this level = 3568 kN Soil W3 2053 e3 2.71
Dead load of the pile cap = 6926 kN W= 8979 e= 1.487
0.000
3.17
0.9 e3
Wt of soil 2053 KN e2
Wt of water from GL to HFL acting on Footing 3850 KN e1
buyoyancy on soil 1027 KN
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Pier +Piercap 3568 e11 = 7.350
Total weight to be used for seismic in foundation 6926 KN Sub+Fdn 12547 3.4809
(Only for exposed pile cap, Zero in case of embedded Open foundation or pile cap)
8 Water current
LWL Normal/Seismic
HFL Normal 101 71.1 243 242.7
HFL-seismic 92 67 231 235
9 Buyoyancy
LWL Normal/Seismic -3903
HFL Normal -4300
HFL-seismic -4300
10 Hydrodynamic
LWL Seismic 144 160 142 158
HFL Seismic 150 166 190 205
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.61 Seismic Force Combination
S.No Combination P HT HL MT ML
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -944 4718 1388 39801 10515
1.2 (0.3L+T+0.3V) Max. P 944 4718 1388 39801 10515
1.3 (0.3L+T-0.3V) Max ML -938 4692 1388 39440 10515
1.4 (0.3L+T+0.3V) Max ML 938 4692 1388 39440 10515
1.5 (0.3L+T-0.3V) Max MT -937 4686 1388 39349 10515
1.6 (0.3L+T+0.3V) Max MT 937 4686 1388 39349 10515
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -925 1415 4627 11940 35051
2.2 (L+0.3T+0.3V) Max. P 925 1415 4627 11940 35051
2.3 (L+0.3T-0.3V) Max ML -925 1408 4627 11832 35051
2.4 (L+0.3T+0.3V) Max ML 925 1408 4627 11832 35051
2.5 (L+0.3T-0.3V) Max MT -925 1406 4627 11805 35051
2.6 (L+0.3T+0.3V) Max MT 925 1406 4627 11805 35051
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -3145 1415 1388 11940 10515
3.2 (0.3L+0.3T+V) Max. P 3145 1415 1388 11940 10515
3.3 (0.3L+0.3T-V) Max ML -3128 1408 1388 11832 10515
3.4 (0.3L+0.3T+V) Max ML 3128 1408 1388 11832 10515
3.5 (0.3L+0.3T-V) Max MT -3124 1406 1388 11805 10515
3.6 (0.3L+0.3T+V) Max MT 3124 1406 1388 11805 10515
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.62 Summary of Load at pile cap bottom at SLS condition
LWL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
10 Group IV (Case 1 Wind Load-Frequent) 27367 384 413 5136 4322 6712
11 Group IV (Case 2 Wind Load-Frequent) 27253 217 413 2733 4483 5250
12 Group IV (Case 3 Wind Load-Frequent) 27256 384 413 5897 4346 7326
HFL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
4 Group II (Case-1 wind load-Rare) 31925 741 1248 9602 12909 16089
5 Group II (Case-2 wind load-Rare) 31498 463 1248 5371 13513 14542
6 Group II (Case-3 wind load-Rare) 31512 741 1248 12456 13002 18006
7 Group III (Case-1 Service-Frequent) 32351 421 1099 5641 11493 12803 Remark
8 Group III (Case-2 Service-Frequent) 31924 282 1099 3323 12097 12545
9 Group III (Case-3 Service-Frequent) 31938 421 1099 8496 11586 14367
10 Group IV (Case 1 Wind Load-Frequent) 31157 485 484 5379 4565 7055
11 Group IV (Case 2 Wind Load-Frequent) 31043 319 484 2977 4726 5585
12 Group IV (Case 3 Wind Load-Frequent) 31047 485 484 6141 4589 7666
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
4 Group II(Case-1) Wind Load 25019 639 1470 9837 15945 18735
5 Group II(Case-2) Wind Load 24450 362 1470 5471 16750 17621
6 Group II(Case-3) Wind Load 24469 639 1470 13644 16068 21079
7 Group III (Case-1A) Seismic Transverse(-V) 22985 6512 2765 53951 26612 60157
8 Group III (Case-1B) Seismic Transverse(+V) 25533 6512 2765 54257 23194 59007 Refer Annexure
9 Group III (Case-2A) Seismic Transverse (-V) 22878 6478 2765 53661 23355 58523
11 Group III (Case-3A) Seismic Transverse(-V) 22884 6469 2765 54408 23219 59155
12 Group III (Case-3B) Seismic Transverse(+V) 25414 6469 2765 54408 23219 59155
19 Group V (Case-1A) Seismic Vertical(-V) 20013 1954 3093 16545 26612 31336
20 Group V (Case-1B) Seismic Vertical(+V) 28505 1954 3093 16545 26612 31336
21 Group V (Case-2A) Seismic Vertical(-V) 19922 1943 3093 16291 26773 31340
22 Group V (Case-2B) Seismic Vertical(+V) 28368 1943 3093 16291 26773 31340
23 Group V (Case-3A) Seismic Vertical(-V) 19932 1941 3093 17123 26637 31666
24 Group V (Case-3B) Seismic Vertical(+V) 28366 1941 3093 17123 26637 31666
HFL- Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
4 Group II(Case-1) Wind Load 28472 741 1541 10081 16187 19070
5 Group II(Case-2) Wind Load 27902 463 1541 5715 16993 17928
6 Group II(Case-3) Wind Load 27922 741 1541 13887 16311 21422
7 Group III (Case-1A) Seismic Transverse(-V) 26438 6611 2833 54229 23442 59079
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
8 Group III (Case-1B) Seismic Transverse(+V) 28986 6611 2833 54536 23442 59361
9 Group III (Case-2A) Seismic Transverse (-V) 26331 6576 2833 53939 23604 58878
11 Group III (Case-3A) Seismic Transverse(-V) 26337 6567 2833 54686 23467 59508
12 Group III (Case-3B) Seismic Transverse(+V) 28867 6567 2833 54686 23467 59508
19 Group V (Case-1A) Seismic Vertical(-V) 23466 2048 3162 16791 26861 31677
20 Group V (Case-1B) Seismic Vertical(+V) 31958 2048 3162 16791 26861 31677
21 Group V (Case-2A) Seismic Vertical(-V) 23375 2037 3162 16536 27022 31680
22 Group V (Case-2B) Seismic Vertical(+V) 31821 2037 3162 16536 27022 31680
23 Group V (Case-3A) Seismic Vertical(-V) 23385 2035 3162 17369 26885 32008
24 Group V (Case-3B) Seismic Vertical(+V) 31819 2035 3162 17369 26885 32008
LWL- CASE
4 Group II(Case-1) Wind Load 38532 959 1525 14085 16526 21714
5 Group II(Case-2) Wind Load 37876 544 1795 7726 20254 21677
6 Group II(Case-3) Wind Load 37899 959 1795 18463 19469 26831
7 Group III (Case-1A) Seismic Transverse(-V) 32667 9697 3027 81123 23280 84397
8 Group III (Case-1B) Seismic Transverse(+V) 36489 9697 3027 81123 23280 84397
9 Group III (Case-2A) Seismic Transverse (-V) 32564 9645 3027 80283 23441 83635
Group III (Case-2B) Seismic Transverse
10 36364 9645 3027 80283 23441 83635
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 32570 9632 3027 80968 23305 84255
12 Group III (Case-3B) Seismic Transverse(+V) 36365 9632 3027 80968 23305 84255
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 32704 2909 9529 24605 71323 75448
V)
Group IV (Case-1B) Seismic
14 36452 2909 9529 24605 71323 75448
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 32590 2893 9529 24277 71484 75494
V)
Group IV (Case-2B) Seismic
16 36338 2893 9529 24277 71484 75494
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 32594 2890 9529 25091 71348 75631
V)
Group IV (Case-3B) Seismic
18 36342 2890 9529 25091 71348 75631
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 28209 2909 3027 24605 23964 34346
20 Group V (Case-1B) Seismic Vertical(+V) 40947 2909 3027 24605 23964 34346
21 Group V (Case-2A) Seismic Vertical(-V) 28130 2893 3027 24277 24125 34225
22 Group V (Case-2B) Seismic Vertical(+V) 40798 2893 3027 24277 24125 34225
23 Group V (Case-3A) Seismic Vertical(-V) 28142 2890 3027 25091 23988 34713
24 Group V (Case-3B) Seismic Vertical(+V) 40793 2890 3027 25091 23988 34713
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - CASE
4 Group II(Case-1) Wind Load 43670 1060 1596 14329 16768 22057
5 Group II(Case-2) Wind Load 43015 645 1866 7970 20496 21991
6 Group II(Case-3) Wind Load 43037 1060 1866 18706 19712 27175
7 Group III (Case-1A) Seismic Transverse(-V) 37468 9795 3096 81401 23529 84734
8 Group III (Case-1B) Seismic Transverse(+V) 41289 9795 3096 81401 23529 84734
9 Group III (Case-2A) Seismic Transverse (-V) 37364 9743 3096 80561 23690 83972
12 Group III (Case-3B) Seismic Transverse(+V) 41166 9730 3096 81246 23553 84591
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 37504 3003 9602 24850 71605 75794
V)
20 Group V (Case-1B) Seismic Vertical(+V) 45747 3003 3096 24850 24212 34696
21 Group V (Case-2A) Seismic Vertical(-V) 32930 2987 3096 24523 24373 34575
22 Group V (Case-2B) Seismic Vertical(+V) 45599 2987 3096 24523 24373 34575
23 Group V (Case-3A) Seismic Vertical(-V) 32943 2983 3096 25337 24237 35062
24 Group V (Case-3B) Seismic Vertical(+V) 45594 2983 3096 25337 24237 35062
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
11.4
1.80 10.8
Design of Pier
LOUIS BERGER Document no.
Long Seismic
Element H r H/r Ce We Ah F
(m) (m) (t) (long) (kN)
Pier Shaft 0.92 0.900 1.022 0.575 2.341 0.18 2.377
Pile Cap 2.25 5.700 0.395 0.39 231.999 0.18 159.769
10.8
1.8 11.4
Element H r H/r Ce We Ah F
(m) (m) (t) (trans) (kN)
Pier Shaft 0.92 0.900 1.022 0.575 2.341 0.18 2.377
Pile Cap 2.25 5.400 0.417 0.39 208.461 0.18 143.559
Design of Pier
LOUIS BERGER Document no.
11.4
1.80 10.8
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
10.8
1.8 11.4
Element H r H/r Ce We Ah F M
(m) (m) (t) (trans) (kN) (kN-m)
Pier Shaft 4.37 0.900 4.856 0.73 11.120 0.18 14.334 26.848
Pile Cap 2.25 5.400 0.417 0.39 217.240 0.18 149.605 189.549
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Pier Section
Reinforcement Details
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
UR 0.86 OK
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Limit
Stress in concrete 5.2 Mpa 16.8 Mpa ok
Stress in Steel 27.5 Mpa 440 Mpa ok
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
As QP moments are less than cracking moments of section, therforcesection remains uncracked
Limit
Crack width 0 mm 0.3 mm OK
section is uncracked
Vertical Reinforcement
Transverse Reinforcement
Spacing Dia
Provided in Drawing 150 mm OK 12 mm OK
spacing of transverse RF should not be more than dia should not be less than
300 mm 8 mm
1800 mm 6.25 mm
200 mm
Pier_P5_8.2m_123+518_9pile
Shear Capapcity of pier (concrete)
bw 6400 mm Vz 5129 kN
deff 1734 mm N 22296362 N
Fck 35 Mpa Ac 11097600 mm^2
Asl 25513 mm^2 N/Ac 2.0091 ok
P1 0.0023
K 1.33962 ok 0.2fcd 3.12
Vrdc 6642 kN
Vmin 3155.7 kN Vrdc ok
Shear force is less than shear capacity of concrete hence no shear RF required
26
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date
No. of piles = 9 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
10.8
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = 0.15 m
-4.5, 4.8 0, 4.8 4.5, 4.8
Pile diameter = 1.5 m
Area of pile = 1.767 m2
Pier Size = 1.8 X 6.40 11.4 MT
3
Unit Weight of R.C.C = 2.5 t/m B B
Self weight of Pile cap = 693 t -4.5, 0 0, 0 4.5, 0
Total Length L1+Lf (Max scour) = 13.4 m
Length of pile = 21.0 m
Reduction factor for pile B.M = 0.90 (IS 2911 part 1, sec iv, fig 5)
LWL -Case
1
2587 192 1311 117 0 287 49 7 343 232 13 79
N
o 2
r 2530 137 1392 117 0 281 52 5 337 225 13 79
m
a 3
l 2532 572 1324 117 0 281 49 20 350 212 13 79
4
2502 984 1594 147 64 278 59 34 371 185 18 108
W
i 5
2445 547 1675 147 36 272 62 19 353 191 17 102
n
d 6
2447 1364 1607 147 64 272 60 47 379 165 18 108
7 2299 5395 2661 276 651 255 99 187 541 -30 79 475
8 2553 5426 2319 276 651 284 86 188 558 9 79 475
9 2288 5366 2335 276 648 254 86 186 527 -19 78 473
10 2541 5366 2335 276 648 282 86 186 555 10 78 473
11
2288 5441 2322 276 647 254 86 189 529 -21 78 473
12 2541 5441 2322 276 647 282 86 189 557 7 78 473
S 13 2301 1655 4766 641 195 256 177 57 489.65 22 74 450
e
14 2551 1655 4766 641 195 283 177 57 517.41 49 74 450
i
s 15 2290 1629 530 641 194 254 20 57 330.60 178 74 450
m 16 2539 1629 4782 641 194 282 177 57 515.85 48 74 450
i
17 2290 1712 4769 641 194 254 177 59 490.52 18 74 450
c
18 2540 1712 4769 641 194 282 177 59 518.28 46 74 450
19 2001 1655 2661 309 195 222 99 57 378.38 66 41 246
20 2851 1655 2661 309 195 317 99 57 472.74 161 41 246
21 1992 1629 2677 309 194 221 99 57 377.08 66 41 245
22 2837 1629 2677 309 194 315 99 57 470.92 159 41 245
23 1993 1712 2664 309 194 221 99 59 379.58 63 41 245
24 2837 1712 2664 309 194 315 99 59 473.29 157 41 245
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date
N 1
o 2932 216 1336 124 10 326 49 7 382.79 269 14 84
r 2
m 2876 162 1416 124 10 320 52 6 377.56 261 14 84
a
3
l 2877 597 1348 124 10 320 50 21 390.35 249 14 84
4 2847 1008 1619 154 74 316 60 35 411.31 221 19 115
W
5
i 2790 571 1699 154 46 310 63 20 392.81 227 18 108
n
6
d 2792 1389 1631 154 74 310 60 48 418.87 202 19 115
7 2644 5423 2344 283 661 294 87 188 568.88 19 80 483
8 2899 5454 2344 283 661 322 87 189 598.25 46 80 483
9 2633 5394 2360 283 658 293 87 187 567.28 18 80 481
10 2886 5394 2360 283 658 321 87 187 595.43 46 80 481
11 2634 5469 2347 283 657 293 87 190 569.43 16 79 481
12 2887 5469 2347 283 657 321 87 190 597.54 44 79 481
S 13 2646 1679 4794 648 205 294 178 58 529.90 58 75 457
e 14 2896 1679 4794 648 205 322 178 58 557.67 86 75 457
i
15 2635 1654 558 648 204 293 21 57 370.86 215 75 456
s
m 16 2885 1654 4811 648 204 321 178 57 556.11 85 75 456
i 17 2635 1737 4797 648 203 293 178 60 530.78 55 75 456
c
18 2885 1737 4797 648 203 321 178 60 558.54 83 75 456
19 2347 1679 2686 316 205 261 99 58 418.52 103 42 253
20 3196 1679 2686 316 205 355 99 58 512.87 197 42 253
21 2338 1654 2702 316 204 260 100 57 417.22 102 42 253
22 3182 1654 2702 316 204 354 100 57 511.06 196 42 253
23 2338 1737 2689 316 203 260 100 60 419.71 100 42 253
24 3182 1737 2689 316 203 354 100 60 513.43 194 42 253
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date
Minimum Thickness of
0.85
Pile cap = 2.25 m 4.8 4.8 4.8
Thickness of pile cap = 2.25 m
Pile offset from edge = 0.15 m
Pile diameter = 1.5 m
2
Area of pile = 1.767 m
Pier Size = 1.8 X 6.40
0 0 0
3
Unit Weight of R.C.C = 2.5 t/m
Self weight of Pile cap = 692.6 t 11.4
Total Length L1+Lf = 13.4 m
Loads on Pile
Normal HFL
Maximum Pile Load = 408 t. 451
Minimum Pile Load = 218 t. 259 .
Calculation of loads on piles for each load combination Max. horizontal load on pile = 16.69 T
LWL - Case
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date
..1 Calculation of depth of fixity and maximum moment in pile for Maximum scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
= 0.0042 m
4.2 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Pile Desgin-SLS
Pile design
SLS - Stress check
stress Limit
Compressive stress 3.1 Mpa 16.8 Mpa OK
Stress in steel 10.1 Mpa 440 Mpa OK
Result of critical case - SLS rare
Limit
Crack width 0 mm 0.3 mm OK
section is uncracked
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design of Pile Foundation-ULS
10.8
No. of piles = 9
Eccentricity between Column
0
and C.G of Pile group = m
4.8 4.8 4.8 0.85
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = 0.15 m
Pile diameter = 1.5 m
0 0 0
Area of pile = 1.767 m2 11.4
Pier Size = 1.8 X 6.40
11 3257 8097 2330 303 963 362 86 281 729 -6 112 678
12 3637 8097 2330 303 963 404 86 281 772 37 112 678
13 3270 2461 7132 953 291 363 264 85 713 14 111 670
14 3645 2461 7132 953 291 405 264 85 755 55 111 670
15 3259 2428 7148 953 289 362 265 84 711 13 111 669
16 3634 2428 7148 953 289 404 265 84 753 55 111 669
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - Case
1 4489 1025 2246 210 68 499 83 36 618 380 24 148
2 4403 599 2367 210 43 489 88 21 598 381 24 144
3 4406 1596 2265 210 68 490 84 55 629 350 24 148
4 4367 1433 1677 160 106 485 62 50 597 373 21 129
5 4301 797 2050 187 64 478 76 28 582 374 22 133
Load case No:7 to 24 seismic load combination is taken as 1.35 times the forces transmitted to it by substructure as per Cl.219.8 of IRC : 6-2017
Calculation of depth of fixity and maximum moment in pile for HFL scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Max scour
dia = Diameter of the pile = 1.500 m
T = (E * I / K1)^0.2
where
E = Youngs Modulus of the concrete in kg/cm2 = 32000000 kn/m^2
I = Moment of Inertia of the pile cross section in =cm 4 0.2485049 m^4
K1 = Modulus of subgrade reaction as per Table 1= 4100 kn/m^3
Q = Resultant horizontal force on pile - =
NORMAL CASE (MAX) 24.5 t
= Resultant horizontal force on pile - =
SEISMIC 114.1 t
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date
Cross - section
Reinforcement details
Main steel Shear RF
no. of bar 27 no. of bar 27 dia 16 mm
dia 32 mm dia 32 mm spacing 150 mm
Total Asr 21715 mm^2 Total Asr 21714.69 mm^2
% of r/f 2.46 %
Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.
4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date
Section check
UR 0.91 OK
Pier_P5_8.2m_123+518_9pile
Annexure - I
General
Ductile detailing shall be carried out for bridges located in zones III,IV and V of
seismic zone map of IRC:6
6250 mm
B core dimension (along trans dimension)
1650 mm
D core dimension (along longitudinal dimension)
Dia. Of stirrup along B f = 12 mm
no. of legs along width (along trans dimension) = 27
Area of the stirupps and ties Asp = 3054 mm2
Dia. Of stirrup along D f = 10 mm
no. of legs along Depth (along long dimension) = 10
Area of the stirupps and ties Asp = 785 mm2
2
Confined area = 10312500 mm
100 mm
Spacing of hoops or ties SL =
Confinement RF
DESIGN OF PILE CAP FOR PIER-P5
INPUT AND
LOAD CALCULATIONS
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
ULS CONDITION
HFL
CASE
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
No. of piles = 9
Size of Pile cap = 10.8 x 11.4
SECTION MODULUS
PILE 1 2 3
ZT 28.8 1.00E+09 -28.8
ZL 27 27 27
Group I (Case-1)
559 524 489 1572
Group I (Case-2)
539 519 499 1557
Group I (Case-3)
570 515 461 1546
LWL CASE
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
ULS CONDITION
Group V (Case-2A) Seismic Vertical(-V) 541 456 371 1368
Longitudinal direction:-
Transverse direction:-
SECTION MODULUS
PILE 1 4 7
ZL 27 1.00E+09 -27
Group I (Case-1)
559 476 394 1429
Group I (Case-2)
539 452 365 1356
Group I (Case-3)
570 487 404 1461
LWL
Group II(Case-1) Wind Load
538 477 416 1431 CASE
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Group I (Case-1)
618 534 451 1603
Group I (Case-2)
598 510 422 1530
Group I (Case-3)
629 545 461 1635
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
SLS CONDITION
No. of piles = 9
SECTION MODULUS
PILE 1 2 3 0
ZT 28.8 1E+09 -28.8 0
ZL 27 27 27 0
LWL CASE
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Longitudinal direction:-
MAXIMUM SHEAR = 1259.61 t
LEVER ARM = 3.60 m
MOMENT = 4534.60 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.8 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 288.56 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 649.27 tm
Net moment = 3885.33 tm
Transverse direction:-
SECTION MODULUS
PILE 1 4 7
ZT 28.8 28.8 28.8
ZL 27 1.00E+09 -27
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
SLS CONDITION
MAXIMUM SHEAR = 1185.63 t
LEVER ARM = 1.60 m
MOMENT = 1897.02 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.80 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 151.88 t
Lever arm = 1.25 m
Moment due to S.W. & Cushion = 189.84 tm
Net moment = 1707.17 tm
CRACK WIDTH
V = 3127 t
Max Load on a Pile= 347 t
Long. Dir
Downward Weight due to pile cap = 288.56 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 649 tm
Net B.M in Long. Dir = 3103 t-m
Trans. Dir
Downward Weight due to pile cap = 151.88 t
Lever arm = 1.25 m
Moment due to S.W. & Cushion = 190 tm
Net B.M in Long. Dir = 1478 t-m
ULS CHECK
LOUIS BERGER Document no.
Material Specification:
STRENGTH CHECK
Pile cap
Pile cap
Sl No. Parameters Units Trans.
Long. Dir
Dir
1 MOMENT KN-M 7680 4983
2 SHEAR FORCE KN 2133 3114
MATERIAL DATA
3 Grade of Steel 550 550
4 Characteristic strength of reinf. (fyk) Mpa 550 550
5 Partial factor for steel (Уs) 1.15 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200 200
8 Grade of Concrete 35 35
9 Charecterstic comp. strength (fck) Mpa 35 35
10 α 0.67 0.67
11 Concrete material factor (Уm) 1.50 1.50
Design value for Concrete comp. strength (fcd =
12 Mpa 15.63 15.63
αfck/Уm)
Geometric Data
13 Width of slab(b) mm 1000 1000
14 depth of Member mm 2250 2250
15 Clear Cover mm 75 75
16 Dia of reinforcement mm 25 20
17 Spacing of bars mm 80 80
18 Dia of reinforcement mm 25 20
19 Spacing of bars mm 80 80
20 Area of reinforcement mm² 12266 7850
21 Reinforcement (Ast/bd) 0.0057 0.0037
22 Hence Pt= (100*Ast/bd) % 0.57 0.37
23 Dia of Shear Reinforcement links mm 10 10
24 Spacing of reinforcement in other direction mm 160 160
25 number of legs Nos. 6 6
26 Reinforcement(% )
Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 2163 2130
32 Depth of NA from comp. flange (x) mm 469 300
33 λ 0.80 0.80
34 η 1.00 1.00
35 Depth of stress Block (λx) mm 375 240
36 Stress on stress Block (η fcd) MPa 15.63 15.63
37 Total comp. force (Fc = λxηfcdb) KN 5866 3754
38 Total tension Force (Fs = fyd At) KN 5866 3754
39 Diff (Fc-Fs) KN 0 0
40 Depth of Lever arm (z) = d-λx/2 mm 1975 2010
41 Moment of resistance (Fc*z) KN-m 11585 7546
42 UR for pure bending 0.66 0.66
43 Status O.K. O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 1081 1065
58 2d = mm 4325 4260
59 αv = m 3.600 1.600
60 β= 0.832 0.370
61 Design Shear force,Ved = kN 1776 1152
62 K = 1+sqrt(200/d)<=2 1.304 1.306
63 σcp MPa 0.000 0.000
64 ρ1=At/(bd)<=0.02 0.006 0.004
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.273 0.274
66 Concrete Shear Capacity Vrd.c =
KN 843 721
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 591 583
69 [Vmin+(0.15σcp)]bwd
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning 4800197-GGN-DD-
Job No 4800197
013
of NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee 29-11-2019
Design of Pier P5 for Ch: 123+518.5
DESIGN FOR PUNCHING SHEAR IN PILE CAP AS PER IRC : 112 - 2011
3
Density of concrete 25 KN/m
3
Density of soil 18 KN/m
Characteristic Strength, fck 35 Mpa
Design Strength of concrete, fcd 15.63 Mpa
Net Applied Force, Ved 8128 KN
Net downward force within the control perimeter, DVEd 1605.8 KN
Overall depth of pile cap 2250 mm
Effective Depth of Pile Cap, d 2130.0 mm
Reinforcement Ratio, rl 0.0046
Distance between the edge of pile to the edge of pier 2.850 < 2d
VEd,red = VEd - DVEd 6522.26 KN
n = 0.6 x [1-fck/310] 0.532
Maximum Punching Shear Resistance, nRd.max = 0.5 x n x fcd 4.16 Mpa
0.5
K = 1 + (200/d) 1.31 ≤2
1.5 0.5
nmin = 0.031 x K x (fck) 0.274 Mpa
Distance of control perimeter from column periphery, a 2.850 mm
2xd/a 1494.74
Perimeter along control line, p 7682 mm
2
Area enclosed by control line 18.23 m
nEd,red = VEd,red /(bd) 0.399 MPa
nmin x 2d/a 409.343 MPa
0.333
nRd = 0.12 x K x (80.r1.fck) x (2d/a) 547.711 MPa
HENCE, OK
SLS CHECK
LOUIS BERGER Document no.
4800197-GGN-DD-
Detailed Engineering in Connection with Rehabilitation and Up-Gradation Job No 4800197 013
to Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-
A) of Ghoshpukur-Salsalabari section in the State of West Bengal on EPC
mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Load Data
1 Moment KN-m 38115 16747
Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Fe 550 Fe 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
Design value for concrete compressive strength (fcd=
11 αfck/γm) Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32
Geometric Data
13 Width of Slab/Beam (b) mm 11400 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 20
18 Effective depth of beam/Slab (d) mm 2163 2130
19 Spacing of Reinforcement (s) or mm 80 80
20 Number of Bar (n) Nos 143 135
21 Area of Reinforcement (At) mm2 69950 42412
22 Reinforcement (%) 0.273 0.175
Stress Check
23 Concrete Cross Sectional Area (AC) mm2 25650000 24300000
24 Perimeter in contact with atmosphere (u) mm 27300 26100
25 Notional Size (=2AC/u) mm 1879 1862
26 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.50 1.50
27 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112MPa 12800 12800
28 Modular ratio (m) 15.63 15.63
29 Allowable stress in Steel Cl 12.2.2,IRC 112MPa 330 330
30 Allowable stress in Concrete Cl 12.2.2,IRC 112MPa 16.80 16.80
31 Position of nuetral axis from comp. face (x) mm 555.2 453.6
32 MOA of Compression area mm2 1.76E+09 1.11E+09
33 MOA of Tension area mm2 1.76E+09 1.11E+09
34 Diff. mm2 0 0
35 MOI of cracked section mm4 3.47E+12 2.20E+12
36 Stress in tension reinf. MPa 275.554 199.553
UR 0.84 0.60
37 Status O.K. O.K.
38 Stress in concrete MPa 6.091 3.455
UR 0.36 0.21
39 Status O.K. O.K.
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Load Data
1 Moment KN-m 30437 1478
Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Table 18.1,IRC 112MPa 550 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
11 Design value for concrete compressive strength (fcd= αfck/γm)
Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32
Geometric Data
13 Width of Slab/Beam (b) mm 11400 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 20
17 Effective depth of beam/Slab (d) mm 2163 2130
18 Spacing of Reinforcement (s) or mm 80 80
19 Number of Bar (n) Nos 143 135
20 Area of Reinforcement (At) mm2 69950 42412
21 Reinforcement (%) 0.273 0.175
Stress Check
22 Concrete Cross Sectional Area (AC) mm2 25650000 24300000
23 Perimeter in contact with atmosphere (u) mm 27300 26100
24 Notional Size (=2AC/u) mm 1879 1862
25 Age at Loading days 28 28
26 Relative humidity Table 6.9 , IRC %
112 12800 12800
27 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 15.6 15.6
28 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112
MPa 1924.8 1924.8
29 Modular ratio (m) 103.906 103.906
30 Allowable stress in Steel Cl 12.2.2,IRC 112
MPa 440.0 440.0
31 Allowable stress in Concrete Cl 12.2.2,IRC 112
MPa 12.60 12.60
32 Position of nuetral axis from comp. face (x) mm 1141.2 972.1
33 MOA of Compression area mm2 7.42E+09 5.10E+09
34 MOA of Tension area mm2 7.42E+09 5.10E+09
35 Diff. mm2 0.000 0.000
36 MOI of cracked section mm4 1.32E+13 9.22E+12
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019
CALCULATION FOR CRACK WIDTH FOR BENDING As per 12.3.4 of IRC 112-2011
41 Wk = Sr,max (esm-ecm)
42 ae = Es/Ecm 6.25 6.25
43 depth hc,eff mm 218.8 300.0
44 Eff area of conc in tension surrounding reinf Ac,eff mm2 2493750 3240000
45 Rr,eff 0.0280 0.0131
46 fctm Mpa 2.800 2.800
47 fct,eff Mpa 2.800 2.800
48 kt 1.500 1.500
49 (esm-ecm)= {ssc - kt(fct,eff/Rr,eff)(1+aeRr,eff)}/Es 0.0003 -0.0016
50 0.6*ssc/Ec 0.0007 0.0001
51 (esm-ecm) 0.0007 0.0001
52 K1 0.80 0.80
53 K2 0.50 0.50
54 Minimum clear cover c 75.00 75.00
55 Srmax = 3.4c+0.425k1k2f/Rreff 407 515
56 Wk = Sr,max (esm-ecm) 0.298 0.030
57 Allowable crack width 0.300 1.300
58 UR 0.99 0.02
59 Status O.K. O.K.
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal
Pier_P7_9.6m_12piles
Content
Annex _I Confinement RF
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1 Inputs:
16.00 Traffic
Direction
FRL 0.00%
+67.378
45.69m span 45.69 m span
2.40 4.1m
6.4m
8.378
GL 55.98
55.40
2.83
2.25
53.15
Super Structure
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design height of pier = 9.20 m
Dimension of Pier along traffic = 1.80 m
Dimension of Pier across traffic = 6.40 m LWL (RL) = +55.98
Scour level HFL = +47.77 m Scour level HFL-S = 49.10
HFL (RL) = +61.15 m Scour level LWL-S = 50.44
Max depth of scour = 13.38 m from HFL
Foundation
Pile - Diameter = 1.5 m Type of Foundation = PILE
No of Pile = 12.0 Nos
Pile cap/Footing -Along Traffic Direction = 10.8 m
Pile cap /Footing -Across Traffic Direction = 15.3 m
Pile cap - Depth = 2.3 m Footing depth at tip = 2.25 m
Min Thickness of soil above pile cap = 0.6 m offset from pier = 0 mm
Materials Modulur ratio = 10
Unit weight of PSC = 25 kN/m3
Unit weight of RCC = 25 kN/m3
Unit weight of Wearing course = 22 kN/m3
Unit weight of Soil fill = 20 kN/m3
Grade of Concrete for Pier = 35 N/mm²
Grade of Concrete for Piles (or Open Foundation) = 35 N/mm²
Grade of Steel used = 550 N/mm²
Load Calculation
1.1 Dead Load
1.1.1 SuperStructure
Load from Span 1
Total Weight = (360.2)×25.0 DL Extra Factor 1.05
Reaction on Bearing(Outer bearing) = 6338 kN
Total SIDL
Reaction (Outer Bearing) = 1268 kN
Reaction (Inner Bearing) = 1268 kN
Total reaction = 2536 kN
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.2 Live Load
Free bearing
u(Rg+Rq) 506 kN 405
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4 Seismic force
Calculation of Seismic coefficients
Z Sa
g
2
Ah
R
I
Importance factor , I = 1.20
Zone Factor, Z (for Zone II) = 0.36
Response reduction factor, R Long- direction = 3.00
Response reduction factor, R Trans - direction = 3.00
Fundamental natural period
D
T 2 (Annexure D , IRC:6-2017)
1000 F
D= Appropriate dead load of the superstructure and live load in kN
F = Horizontal force in kN required to be applied at the centre of mass of the superstructure for one mm
horizontal deflection at the top of the pier for the earthquake in the transverse direction
and the force to be applied at the top of the bearings for the earthquake in the longitudinal direction
1.4.1 Calculation of Stiffness
Pier
Dimension of Pier - Longitudinal direction = 1.80 m
Dimension of Pier - Transverse direction = 6.40 m
Pier - design height = 9.20 m
Grade of concrete = M 35
4
M.I in longitudinal direction IL (0.75 Cracked MOI) = 2.333 m =(6.40×1.80^3)/12
4
M.I in transverse direction IT (0.75 Cracked MOI) = 29.491 m =(1.80×6.40^3)/12
Modulus of elasticity of concrete E = 32000 N/mm2 (IRC:112-2011 Table 6.5)
Stiffness in trans direction K1T = 3EI/H3
=6×32000×1000×29.491/((9.55^2)×((3×(1.38))+(2
= 2167624 kN/m
×9.55)))
Total Stiffness
Stiffness " k " = 1/(1/k1+1/k2)
Stiffness in Longitudinal direction "KL" = =1/(1/257122+1/427825)
= 160601 kN/m
= 160.60 kN/mm 257.1216373
Stiffness in transverse direction "KT" = 1/(1/2167624+1/427825)
= 357304 kN/m
= 357.30 kN/mm 2167.624218
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4.2 Calculation of Seismic coefficient in the Longitudinal direction
D = 15212 kN
T = 0.486 (eq-1)
Sa/g = 2.500 2.50 for square pier link with this
= 2.500 for wall type pier full Sa/g considered
Horizontal accelaration longitudinal " AhL " = (Sa/g)*(Z/2)/(R/I)
= 0.180 =(0.36/2)×(2.500)/(3.00/1.20)
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017
T = 0.170 (eq-1)
Sa/g = 2.500
Horizontal acceleration Transverse " AhT " = (Sa/g)*(Z/2)/(R/I)
= 0.180 (=(0.36/2)×2.500/(3.00/1.20))
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
= 314 kN
Longitudinal wind load (FL) = 79 kN
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
h/b = 1.35
d/b = 0.281
Drag Coefficient (CD) = 2.20
2
Exposed area of substructure (A1) = 17 m
2
Wind pressure (Pz) = 777.6 N/m
Transverse wind load (FT) Pz x A1 x G x CD = 59 kN
h/b = 4.79
d/b = 3.556
Drag Coefficient (CD) 1.579166667 = 1.14
2
Exposed area of substructure (A1) = 91.8 m
2
Wind pressure (Pz) = 777.6 N/m
Longitudinal wind load (FL) = 163 kN
Variation of velocity with depth (at HFL -S) (at HFL -N)
(at HFL) 6.06 6.06 kN/m2
HFL
13.4 5.75
3.17 3.46 kN/m2 Pier bottom
2.04 12.04 2.44 kN/m2 Pile bottom
SCOUR LEVEL
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity
Bottom of footing level 2.4 0.940 =2.4×0.940 2.29 0.342 =2.4×0.342 0.83
1.189804147
Bottom of footing level 2.0 0.940 =2.0×0.940 1.91 0.342 =2.0×0.342 0.70
1.206569026
Longitudinal Forces & Moments:
1.206569026
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Buoyancy : LWL
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.52 Load Combination at the Top of Pier cap for ULS condition
7 Group III (Case-1) Seismic Transverse 18713 4243 169 7578 268
Refer Annexure
8 Group III (Case-2) Seismic Transverse 18625 4205 169 7314 429
9 Group III (Case-3) Seismic Transverse 18635 4195 169 8144 293
1.53 Load Combination at the Top of Pier cap for SLS condition
W1
0.750
0.750
W2 Traffic Direction
7.13
W3
6.40 1.80
0.58
2.25 m
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Load of Pier
W2 Area of flared portion (top) = 52.89 m2 Pedestal :
Area of flared portion (bot.) = 29.52 m2 Width = 1.100 m
Height of flared portion = 0.75 m Length = 1.100 m
Volume of flared portion = 30.5 m3 P (KN) e (m) from Pier Base
CG of the flared portion from top of straight
= 0.42 m 762.02 8.12
portion of pier
W3 Width = 6.40 m
Breadth = 1.80 m
Area of c/s of straight portion = 11.520 m2
Total Height of straight portion = 7.70 m =9.20-0.75-0.75
Volume of straight portion = 88.704 m3 P (KN) e (m) from Pier Base
2217.6 3.85
W1 Pier Cap
Length of pier cap = 12.90 m
Width of pier cap = 4.1 m
Avg.Thickness of pier cap = 0.75 m P (KN) e (m) from Pier Base
Volume of pier cap = 39.6675 m3 991.6875 8.825
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
LWL - Case
Moment Resultant
P Horizontal Force (kN) Moment (kN-m) kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1 service-Rare) 20979 390 1358 6352 13636 15043
2 Group I (Case-2 service-Rare) 20409 224 1358 3657 14441 14897
3 Group I (Case-3 service-Rare) 20429 390 1358 10158 13759 17103
4 Group II (Case-1 wind load-Rare) 20134 650 1190 8830 11619 14594
5 Group II (Case-2 wind load-Rare) 19707 373 1190 1946 11501 11664
6 Group II (Case-3 wind load-Rare) 19721 650 1190 8796 10989 14076
7 Group III (Case-1 Service-Frequent) 20560 325 1034 5134 10354 11556
8 Group III (Case-2 Service-Frequent) 20133 187 1034 2933 10957 11343 Refer Annexure
9 Group III (Case-3 Service-Frequent) 20148 325 1034 7988 10446 13150
10 Group IV (Case 1 Wind Load-Frequent) 19366 390 421 4819 3942 6226
11 Group IV (Case 2 Wind Load-Frequent) 19252 224 421 2558 4103 4835
12 Group IV (Case 3 Wind Load-Frequent) 19256 390 421 5581 3967 6847
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - Case
4 Group II(Case-1) Wind Load 27530 975 1814 13293 17732 22162
5 Group II(Case-2) Wind Load 26875 560 1814 7288 18658 20031
6 Group II(Case-3) Wind Load 26897 975 1814 17671 17874 25134
7 Group III (Case-1A) Seismic Transverse(-V) 25774 5317 1723 52954 16092 55346
Refer Annexure
8 Group III (Case-1B) Seismic Transverse(+V) 27900 5317 1723 52954 16092 55346
9 Group III (Case-2A) Seismic Transverse (-V) 25668 5278 1723 52337 16253 54802
12 Group III (Case-3B) Seismic Transverse(+V) 27781 5268 1723 53078 16117 55471
18 Group V (Case-1A) Seismic Vertical(-V) 23294 1595 1723 16155 16092 22802
18 Group V (Case-1B) Seismic Vertical(+V) 30381 1595 1723 16155 16092 22802
18 Group V (Case-2A) Seismic Vertical(-V) 23205 1583 1723 15893 16253 22732
18 Group V (Case-2B) Seismic Vertical(+V) 30241 1583 1723 15893 16253 22732
18 Group V (Case-3A) Seismic Vertical(-V) 23216 1581 1723 16724 16117 23226
18 Group V (Case-3B) Seismic Vertical(+V) 30239 1581 1723 16724 16117 23226
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL- Case
Horizontal Force (kN) Moment (kN-m) Moment Resultant
P kNm
S.No Load Combination Remark
(kN) HT HL MT ML
4 Group II(Case-1) Wind Load 27441 1022 1874 13438 17920 22399
5 Group II(Case-2) Wind Load 26785 606 1874 7432 18845 20258
6 Group II(Case-3) Wind Load 26807 1022 1874 17816 18061 25369
7 Group III (Case-1A) Seismic Transverse(-V) 25179 5379 1786 53143 16290 55583 Refer annex
8 Group III (Case-1B) Seismic Transverse(+V) 27305 5379 1786 53143 16290 55583
9 Group III (Case-2A) Seismic Transverse (-V) 25072 5341 1786 52525 16451 55041
12 Group III (Case-3B) Seismic Transverse(+V) 27185 5331 1786 53266 16315 55709
20 Group V (Case-1B) Seismic Vertical(+V) 29785 1645 1786 16311 16290 23052
21 Group V (Case-2A) Seismic Vertical(-V) 22610 1634 1786 16049 16451 22983
22 Group V (Case-2B) Seismic Vertical(+V) 29646 1634 1786 16049 16451 22983
23 Group V (Case-3A) Seismic Vertical(-V) 22620 1631 1786 16881 16315 23476
24 Group V (Case-3B) Seismic Vertical(+V) 29643 1631 1786 16881 16315 23476
11.52 165
1.60 Summary of Load at pile cap bottom Footing 372
Depth of pile cap /Open foundation = 2.25 W1 9295 e1 1.125
Height from Piercap Top = 11.45 m W2 0 e2 2.250
Dead load of the Pier at this level = 3971 kN Soil W3 1768 e3 2.54
Dead load of the pile cap = 9295 kN W= 11063 e= 1.351
0.000
2.83
0.6 e3
Wt of soil 1768 KN e2
Wt of water from GL to HFL acting on Footing 7947 KN e1
buyoyancy on soil 884 KN
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Pier +Piercap 3971 e11 = 8.161
Total weight to be used for seismic in foundation 9295 KN Sub+Fdn 15034 3.3895
(Only for exposed pile cap, Zero in case of embedded Open foundation or pile cap)
8 Water current
LWL Normal/Seismic
HFL Normal 114 94.6 329 363.5
HFL-seismic 104 89 315 352
9 Buyoyancy
LWL Normal/Seismic -4668
HFL Normal -5264
HFL-seismic -5264
10 Hydrodynamic
LWL Seismic 143 286 139 277
HFL Seismic 152 295 217 355
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.61 Seismic Force Combination
S.No Combination P HT HL MT ML
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -1043 5217 1538 45280 12121
1.2 (0.3L+T+0.3V) Max. P 1043 5217 1538 45280 12121
1.3 (0.3L+T-0.3V) Max ML -1038 5191 1538 44883 12121
1.4 (0.3L+T+0.3V) Max ML 1038 5191 1538 44883 12121
1.5 (0.3L+T-0.3V) Max MT -1037 5185 1538 44783 12121
1.6 (0.3L+T+0.3V) Max MT 1037 5185 1538 44783 12121
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -1025 1565 5126 13584 40404
2.2 (L+0.3T+0.3V) Max. P 1025 1565 5126 13584 40404
2.3 (L+0.3T-0.3V) Max ML -1025 1557 5126 13465 40404
2.4 (L+0.3T+0.3V) Max ML 1025 1557 5126 13465 40404
2.5 (L+0.3T-0.3V) Max MT -1025 1555 5126 13435 40404
2.6 (L+0.3T+0.3V) Max MT 1025 1555 5126 13435 40404
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -3478 1565 1538 13584 12121
3.2 (0.3L+0.3T+V) Max. P 3478 1565 1538 13584 12121
3.3 (0.3L+0.3T-V) Max ML -3461 1557 1538 13465 12121
3.4 (0.3L+0.3T+V) Max ML 3461 1557 1538 13465 12121
3.5 (0.3L+0.3T-V) Max MT -3456 1555 1538 13435 12121
3.6 (0.3L+0.3T+V) Max MT 3456 1555 1538 13435 12121
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.62 Summary of Load at pile cap bottom at SLS condition
LWL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
10 Group IV (Case 1 Wind Load-Frequent) 29739 390 421 5697 4889 7508
11 Group IV (Case 2 Wind Load-Frequent) 29625 224 421 3061 5051 5906
12 Group IV (Case 3 Wind Load-Frequent) 29628 390 421 6458 4914 8115
HFL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
4 Group II (Case-1 wind load-Rare) 38364 764 1284 10622 14660 18104
5 Group II (Case-2 wind load-Rare) 37937 487 1284 6004 15263 16402
6 Group II (Case-3 wind load-Rare) 37951 764 1284 13477 14752 19981
7 Group III (Case-1 Service-Frequent) 38791 439 1129 6194 13044 14440 Remark
8 Group III (Case-2 Service-Frequent) 38363 300 1129 3682 13648 14136
9 Group III (Case-3 Service-Frequent) 38378 439 1129 9049 13136 15951
10 Group IV (Case 1 Wind Load-Frequent) 37597 504 515 6026 5253 7994
11 Group IV (Case 2 Wind Load-Frequent) 37483 337 515 3391 5414 6388
12 Group IV (Case 3 Wind Load-Frequent) 37486 504 515 6787 5278 8598
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
4 Group II(Case-1) Wind Load 26741 650 1482 10772 17984 20964
5 Group II(Case-2) Wind Load 26171 373 1482 6018 18789 19730
6 Group II(Case-3) Wind Load 26191 650 1482 14579 18107 23247
7 Group III (Case-1A) Seismic Transverse(-V) 24572 7186 3005 61345 30455 68489
8 Group III (Case-1B) Seismic Transverse(+V) 27389 7186 3005 61651 26577 67136 Refer Annexure
9 Group III (Case-2A) Seismic Transverse (-V) 24465 7151 3005 61006 26738 66609
11 Group III (Case-3A) Seismic Transverse(-V) 24471 7142 3005 61741 26602 67228
12 Group III (Case-3B) Seismic Transverse(+V) 27271 7142 3005 61741 26602 67228
19 Group V (Case-1A) Seismic Vertical(-V) 21286 2156 3333 18764 30455 35771
20 Group V (Case-1B) Seismic Vertical(+V) 30676 2156 3333 18764 30455 35771
21 Group V (Case-2A) Seismic Vertical(-V) 21195 2145 3333 18494 30616 35769
22 Group V (Case-2B) Seismic Vertical(+V) 30539 2145 3333 18494 30616 35769
23 Group V (Case-3A) Seismic Vertical(-V) 21205 2143 3333 19323 30480 36089
24 Group V (Case-3B) Seismic Vertical(+V) 30537 2143 3333 19323 30480 36089
HFL- Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
4 Group II(Case-1) Wind Load 34093 764 1577 11101 18348 21445
5 Group II(Case-2) Wind Load 33523 487 1577 6348 19153 20177
6 Group II(Case-3) Wind Load 33542 764 1577 14908 18471 23736
7 Group III (Case-1A) Seismic Transverse(-V) 31924 7299 3096 61737 26952 67364
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
8 Group III (Case-1B) Seismic Transverse(+V) 34741 7299 3096 62044 26952 67645
9 Group III (Case-2A) Seismic Transverse (-V) 31817 7264 3096 61399 27113 67119
11 Group III (Case-3A) Seismic Transverse(-V) 31823 7256 3096 62133 26977 67737
12 Group III (Case-3B) Seismic Transverse(+V) 34622 7256 3096 62133 26977 67737
19 Group V (Case-1A) Seismic Vertical(-V) 28638 2263 3425 19102 30830 36268
20 Group V (Case-1B) Seismic Vertical(+V) 38028 2263 3425 19102 30830 36268
21 Group V (Case-2A) Seismic Vertical(-V) 28547 2252 3425 18833 30991 36265
22 Group V (Case-2B) Seismic Vertical(+V) 37891 2252 3425 18833 30991 36265
23 Group V (Case-3A) Seismic Vertical(-V) 28556 2250 3425 19662 30855 36587
24 Group V (Case-3B) Seismic Vertical(+V) 37889 2250 3425 19662 30855 36587
LWL- CASE
4 Group II(Case-1) Wind Load 41774 975 1544 15488 18634 24230
5 Group II(Case-2) Wind Load 41119 560 1814 8547 22739 24292
6 Group II(Case-3) Wind Load 41141 975 1814 19865 21955 29608
7 Group III (Case-1A) Seismic Transverse(-V) 35057 10707 3368 92216 26803 96032
8 Group III (Case-1B) Seismic Transverse(+V) 39283 10707 3368 92216 26803 96032
9 Group III (Case-2A) Seismic Transverse (-V) 34954 10655 3368 91302 26964 95201
Group III (Case-2B) Seismic Transverse
10 39158 10655 3368 91302 26964 95201
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 34960 10642 3368 91969 26828 95802
12 Group III (Case-3B) Seismic Transverse(+V) 39160 10642 3368 91969 26828 95802
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 35094 3212 10666 27933 82280 86892
V)
Group IV (Case-1B) Seismic
14 39246 3212 10666 27933 82280 86892
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 34980 3196 10666 27583 82441 86933
V)
Group IV (Case-2B) Seismic
16 39132 3196 10666 27583 82441 86933
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 34984 3193 10666 28392 82305 87064
V)
Group IV (Case-3B) Seismic
18 39136 3193 10666 28392 82305 87064
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 30127 3212 3368 27933 27579 39253
20 Group V (Case-1B) Seismic Vertical(+V) 44213 3212 3368 27933 27579 39253
21 Group V (Case-2A) Seismic Vertical(-V) 30048 3196 3368 27583 27740 39119
22 Group V (Case-2B) Seismic Vertical(+V) 44064 3196 3368 27583 27740 39119
23 Group V (Case-3A) Seismic Vertical(-V) 30061 3193 3368 28392 27603 39599
24 Group V (Case-3B) Seismic Vertical(+V) 44059 3193 3368 28392 27603 39599
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - CASE
4 Group II(Case-1) Wind Load 52414 1089 1639 15817 18997 24720
5 Group II(Case-2) Wind Load 51758 673 1908 8876 23102 24749
6 Group II(Case-3) Wind Load 51780 1089 1908 20194 22318 30098
7 Group III (Case-1A) Seismic Transverse(-V) 45190 10820 3460 92608 27178 96514
8 Group III (Case-1B) Seismic Transverse(+V) 49416 10820 3460 92608 27178 96514
9 Group III (Case-2A) Seismic Transverse (-V) 45087 10768 3460 91695 27339 95684
12 Group III (Case-3B) Seismic Transverse(+V) 49293 10755 3460 92362 27203 96285
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 45227 3319 10764 28271 82710 87408
V)
20 Group V (Case-1B) Seismic Vertical(+V) 54346 3319 3460 28271 27954 39758
21 Group V (Case-2A) Seismic Vertical(-V) 40181 3303 3460 27921 28115 39624
22 Group V (Case-2B) Seismic Vertical(+V) 54197 3303 3460 27921 28115 39624
23 Group V (Case-3A) Seismic Vertical(-V) 40194 3300 3460 28730 27978 40103
24 Group V (Case-3B) Seismic Vertical(+V) 54192 3300 3460 28730 27978 40103
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
15.3
1.80 10.8
Design of Pier
LOUIS BERGER Document no.
Long Seismic
Element H r H/r Ce We Ah F
(m) (m) (t) (long) (kN)
Pier Shaft 0.575 0.900 0.639 0.39 1.463 0.18 1.008
Pile Cap 2.25 7.650 0.294 0.39 415.134 0.18 285.887
10.8
1.8 15.3
Element H r H/r Ce We Ah F
(m) (m) (t) (trans) (kN)
Pier Shaft 0.575 0.900 0.639 0.39 1.463 0.18 1.008
Pile Cap 2.25 5.400 0.417 0.39 207.583 0.18 142.955
Design of Pier
LOUIS BERGER Document no.
15.3
1.80 10.8
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
10.8
1.8 15.3
Element H r H/r Ce We Ah F M
(m) (m) (t) (trans) (kN) (kN-m)
Pier Shaft 5.745 0.900 6.383 0.73 14.619 0.18 18.845 46.401
Pile Cap 2.25 5.400 0.417 0.39 220.739 0.18 152.015 217.224
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Pier Section
Reinforcement Details
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
UR 0.78 OK
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Limit
Stress in concrete 5.4 Mpa 16.8 Mpa ok
Stress in Steel 31.1 Mpa 440 Mpa ok
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
As QP moments are less than cracking moments of section, therforcesection remains uncracked
Limit
Crack width 0 mm 0.3 mm OK
section is uncracked
Vertical Reinforcement
Transverse Reinforcement
Spacing Dia
Provided in Drawing 150 mm OK 12 mm OK
spacing of transverse RF should not be more than dia should not be less than
384 mm 8 mm
1800 mm 8 mm
200 mm
Pier_P7_9.6m_12piles
Shear Capapcity of pier (concrete)
bw 6400 mm Vz 5256 kN
deff 1740.00 mm N 22609705.65 N
Fck 35 Mpa Ac 11136000 mm^2
Asl 108131 mm^2 N/Ac 2.030325579 ok
P1 0.00971
K 1.33903 ok 0.2fcd 3.12
Vrdc 8713.1 kN
Vmin 3164.54 kN Vrdc ok
Shear force is less than shear capacity of concrete hence no shear RF required
26
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date
No. of piles = 12 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
10.8
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = 0.15 m -4.5, 6.75 0, 6.75 4.5, 6.75
Pile diameter = 1.5 m
Area of pile = 1.767 m2
Pier Size = 1.8 X 6.40 15.3 MT
-4.5, 2.25 0, 2.25 4.5, 2.25
3
Unit Weight of R.C.C = 2.5 t/m B B
Self weight of Pile cap = 929 t
Total Length L1+Lf (Max scour) = 13.9 m
-4.5, -2.25 0, -2.25 4.5, -2.25
Length of pile = 22.0 m
Reduction factor for pile B.M = 0.90 (IS 2911 part 1, sec iv, fig 5)
LWL -Case
1
2759 192 1475 117 0 230 41 4 275 185 10 61
N
o 2
r 2702 137 1556 117 0 225 43 3 271 179 10 61
m
a 3
l 2704 572 1488 117 0 225 41 13 279 171 10 61
4
2674 1077 1798 148 65 223 50 24 297 149 13 84
W
i 5
2617 602 1879 148 37 218 52 13 284 153 13 80
n
d 6
2619 1458 1811 148 65 218 50 32 301 136 13 84
7 2457 6134 3046 300 719 205 85 136 426 -16 65 406
8 2739 6165 2658 300 719 228 74 137 439 17 65 406
9 2447 6101 2674 300 715 204 74 136 414 -6 65 404
10 2727 6101 2674 300 715 227 74 136 437 17 65 404
11
2447 6174 2660 300 714 204 74 137 415 -7 65 403
12 2727 6174 2660 300 714 227 74 137 438 16 65 403
S 13 2460 1876 5501 721 216 205 153 42 399.47 10 63 392
e
14 2736 1876 5501 721 216 228 153 42 422.54 34 63 392
i
s 15 2448 1849 616 721 215 204 17 41 262.24 146 63 391
m 16 2725 1849 5517 721 215 227 153 41 421.44 33 63 391
i
17 2449 1932 5503 721 214 204 153 43 399.87 8 63 391
c
18 2725 1932 5503 721 214 227 153 43 422.93 31 63 391
19 2129 1876 3046 333 216 177 85 42 303.68 51 33 207
20 3068 1876 3046 333 216 256 85 42 381.93 129 33 207
21 2119 1849 3062 333 215 177 85 41 302.77 50 33 206
22 3054 1849 3062 333 215 254 85 41 380.63 128 33 206
23 2120 1932 3048 333 214 177 85 43 304.31 49 33 206
24 3054 1932 3048 333 214 254 85 43 382.08 127 33 206
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date
N 1
o 3495 224 1512 127 11 291 42 5 338.19 244 11 66
r 2
m 3438 170 1592 127 11 286 44 4 334.48 238 11 66
a
3
l 3439 605 1524 127 11 287 42 13 342.40 231 11 66
4 3409 1110 1835 158 76 284 51 25 359.74 208 15 91
W
5
i 3352 635 1915 158 49 279 53 14 346.67 212 14 86
n
6
d 3354 1491 1847 158 76 280 51 33 363.96 195 15 91
7 3192 6174 2695 310 730 266 75 137 478.09 54 66 413
8 3474 6204 2695 310 730 290 75 138 502.25 77 66 413
9 3182 6140 2711 310 726 265 75 136 476.90 53 66 411
10 3462 6140 2711 310 726 289 75 136 500.26 77 66 411
11 3182 6213 2698 310 726 265 75 138 478.20 52 66 411
12 3462 6213 2698 310 726 289 75 138 501.53 76 66 411
S 13 3195 1910 5544 730 226 266 154 42 462.68 70 64 398
e 14 3472 1910 5544 730 226 289 154 42 485.75 93 64 398
i
15 3183 1883 659 730 225 265 18 42 325.45 205 64 398
s
m 16 3460 1883 5560 730 225 288 154 42 484.65 92 64 398
i 17 3184 1966 5546 730 225 265 154 44 463.07 68 64 398
c
18 3461 1966 5546 730 225 288 154 44 486.14 91 64 398
19 2864 1910 3083 342 226 239 86 42 366.73 111 34 214
20 3803 1910 3083 342 226 317 86 42 444.98 189 34 214
21 2855 1883 3099 342 225 238 86 42 365.83 110 34 213
22 3789 1883 3099 342 225 316 86 42 443.69 188 34 213
23 2856 1966 3085 342 225 238 86 44 367.37 109 34 213
24 3789 1966 3085 342 225 316 86 44 445.14 186 34 213
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date
Minimum Thickness of
0.85
Pile cap = 2.25 m 6.75 6.75 6.75
Thickness of pile cap = 2.25 m
Pile offset from edge = 0.15 m
Pile diameter = 1.5 m
Area of pile = 2 2.25 2.25 2.25
1.767 m
Pier Size = 1.8 X 6.40
Loads on Pile
Normal HFL
Maximum Pile Load = 328 t. 395
Minimum Pile Load = 182 t. 245 .
Calculation of loads on piles for each load combination Max. horizontal load on pile = 12.81 T
LWL - Case
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date
..1 Calculation of depth of fixity and maximum moment in pile for Maximum scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
= 0.0036 m
3.6 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Pile Desgin-SLS
Pile design
SLS - Stress check
stress Limit
Compressive stress 2.5 Mpa 16.8 Mpa OK
Stress in steel 8.8 Mpa 440 Mpa OK
Result of critical case - SLS rare
Limit
Crack width 0 mm 0.3 mm OK
section is uncracked
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design of Pile Foundation-ULS
10.8
No. of piles = 12
Eccentricity between Column
0
and C.G of Pile group = m
6.75 6.75 6.75 0.85
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = m 2.25 2.25 2.25
0.15
Pile diameter = 1.5 m
Area of pile = 2 15.3
1.767 m
Pier Size = 1.8 X 6.40 -2.25 -2.25 -2.25
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - Case
1 5363 1117 2540 213 70 447 71 25 542 352 19 117
2 5278 657 2661 213 45 440 74 15 528 351 18 113
3 5281 1688 2559 213 70 440 71 38 549 331 19 117
4 5241 1582 1900 164 109 437 53 35 525 349 16 102
5 5176 888 2310 191 67 431 64 20 515 347 17 105
Load case No:7 to 24 seismic load combination is taken as 1.35 times the forces transmitted to it by substructure as per Cl.219.8 of IRC : 6-2017
Calculation of depth of fixity and maximum moment in pile for HFL scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Max scour
dia = Diameter of the pile = 1.500 m
T = (E * I / K1)^0.2
where
E = Youngs Modulus of the concrete in kg/cm2 = 32000000 kn/m^2
I = Moment of Inertia of the pile cross section in =cm 4 0.2485049 m^4
K1 = Modulus of subgrade reaction as per Table 1= 7700 kn/m^3
Q = Resultant horizontal force on pile - =
NORMAL CASE (MAX) 18.7 t
= Resultant horizontal force on pile - =
SEISMIC 94.7 t
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date
Cross - section
Reinforcement details
Main steel Shear RF
no. of bar 24 no. of bar 24 dia 16 mm
dia 32 mm dia 25 mm spacing 150 mm
Total Asr 19302 mm^2 Total Asr 11780.97 mm^2
% of r/f 1.76 %
Pier_P7_9.6m_12piles
LOUIS BERGER Document no.
4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date
Section check
UR 0.91 OK
Pier_P7_9.6m_12piles
Annexure - I
General
Ductile detailing shall be carried out for bridges located in zones III,IV and V of
seismic zone map of IRC:6
6250 mm
B core dimension (along trans dimension)
1650 mm
D core dimension (along longitudinal dimension)
Dia. Of stirrup along B f = 12 mm
no. of legs along width (along trans dimension) = 27
Area of the stirupps and ties Asp = 3054 mm2
Dia. Of stirrup along D f = 10 mm
no. of legs along Depth (along long dimension) = 10
Area of the stirupps and ties Asp = 785 mm2
2
Confined area = 10312500 mm
100 mm
Spacing of hoops or ties SL =
Confinement RF
DESIGN OF PILE CAP FOR PIER-P7
INPUT AND
LOAD CALCULATIONS
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
ULS CONDITION
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
No. of piles = 12
Size of Pile cap = 10.8 x 15.3
SECTION MODULUS
PILE 1 2 3 4
ZT 45 135 -135 -45
ZL 36 36 36 36
Group I (Case-1)
452 436 420 404 1711
Group I (Case-2)
438 429 419 410 1696
Group I (Case-3)
458 434 409 385 1686
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
ULS CONDITION
Group V (Case-2B) Seismic Vertical(+V) 592 550 509 468 2119
Longitudinal direction:-
Transverse direction:-
SECTION MODULUS
PILE 1 5 9
ZT 45 45 45
ZL 36 1.00E+09 -36
Group I (Case-1)
452 382 313 1147
Group I (Case-2)
438 365 292 1095
Group I (Case-3)
458 388 318 1164
LWL
Group II(Case-1) Wind Load
434 383 331 1148 CASE
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Group I (Case-1)
542 472 401 1415
Group I (Case-2)
528 454 380 1363
Group I (Case-3)
549 478 406 1433
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
SLS CONDITION
No. of piles = 12
SECTION MODULUS
PILE 1 2 3 4
ZT 45 135 -135 -45
ZL 36 36 36 36
LWL CASE
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Longitudinal direction:-
MAXIMUM SHEAR = 1496.48 t
LEVER ARM = 3.60 m
MOMENT = 5387.35 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.8 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 387.28 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 871.38 tm
Net moment = 4515.96 tm
Transverse direction:-
SECTION MODULUS
PILE 1 5 9
ZT 45 45 45
ZL 36 1.00E+09 -36
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
CRACK WIDTH
V = 3770 t
Max Load on a Pile= 314 t
Long. Dir
Downward Weight due to pile cap = 387.28 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 871 tm
Net B.M in Long. Dir = 3653 t-m
Trans. Dir
Downward Weight due to pile cap = 270.34 t
Lever arm = 2.23 m
Moment due to S.W. & Cushion = 602 tm
Net B.M in Long. Dir = 2745 t-m
ULS CHECK
LOUIS BERGER Document no.
Material Specification:
STRENGTH CHECK
Pile cap
Pile cap
Sl No. Parameters Units Trans.
Long. Dir
Dir
1 MOMENT KN-M 6528 6488
2 SHEAR FORCE KN 1813 1828
MATERIAL DATA
3 Grade of Steel 550 550
4 Characteristic strength of reinf. (fyk) Mpa 550 550
5 Partial factor for steel (Уs) 1.15 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200 200
8 Grade of Concrete 35 35
9 Charecterstic comp. strength (fck) Mpa 35 35
10 α 0.67 0.67
11 Concrete material factor (Уm) 1.50 1.50
Design value for Concrete comp. strength (fcd =
12 Mpa 15.63 15.63
αfck/Уm)
Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 2163 2125
32 Depth of NA from comp. flange (x) mm 385 385
33 λ 0.80 0.80
34 η 1.00 1.00
35 Depth of stress Block (λx) mm 308 308
36 Stress on stress Block (η fcd) MPa 15.63 15.63
37 Total comp. force (Fc = λxηfcdb) KN 4810 4810
38 Total tension Force (Fs = fyd At) KN 4810 4810
39 Diff (Fc-Fs) KN 0 0
40 Depth of Lever arm (z) = d-λx/2 mm 2009 1971
41 Moment of resistance (Fc*z) KN-m 9662 9482
42 UR for pure bending 0.68 0.68
43 Status O.K. O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 1081 1063
58 2d = mm 4325 4250
59 αv = m 3.600 3.550
60 β= 0.832 0.821
61 Design Shear force,Ved = kN 1509 1500
62 K = 1+sqrt(200/d)<=2 1.304 1.307
63 σcp MPa 0.000 0.000
64 ρ1=At/(bd)<=0.02 0.005 0.005
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.273 0.274
66 Concrete Shear Capacity Vrd.c =
KN 789 782
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 591 582
69 [Vmin+(0.15σcp)]bwd
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning 4800197-GGN-DD-
Job No 4800197
of NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari 013
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Design of Pier P7 for Ch: 123+518.5 Akshit S.Chatterjee 29-11-2019
DESIGN FOR PUNCHING SHEAR IN PILE CAP AS PER IRC : 112 - 2011
3
Density of concrete 25 KN/m
3
Density of soil 18 KN/m
Characteristic Strength, fck 35 Mpa
Design Strength of concrete, fcd 15.63 Mpa
Net Applied Force, Ved 6909 KN
Net downward force within the control perimeter, DVEd 1605.8 KN
Overall depth of pile cap 2250 mm
Effective Depth of Pile Cap, d 2142.0 mm
Reinforcement Ratio, rl 0.0047
Distance between the edge of pile to the edge of pier 3.070 < 2d
VEd,red = VEd - DVEd 5302.75 KN
n = 0.6 x [1-fck/310] 0.532
Maximum Punching Shear Resistance , nRd.max = 0.5 x n x fcd 4.16 Mpa
0.5
K = 1 + (200/d) 1.31 ≤2
nmin = 0.031 x K1.5 x (fck)0.5 0.274 Mpa
Distance of control perimeter from column periphery, a 3.070 mm
2xd/a 1395.44
Perimeter along control line, p 7682.00 mm
2
Area enclosed by control line 18.23 m
nEd,red = VEd,red /(bd) 0.322 MPa
nmin x 2d/a 381.773 MPa
nRd = 0.12 x K x (80.r1.fck)0.333 x (2d/a) 515.410 MPa
HENCE, OK
SLS CHECK
LOUIS BERGER Document no.
4800197-GGN-DD-
Detailed Engineering in Connection with Rehabilitation and Up-Gradation Job No 4800197 013
to Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-
A) of Ghoshpukur-Salsalabari section in the State of West Bengal on EPC
mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Load Data
1 Moment KN-m 44302 30396
Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Fe 550 Fe 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
Design value for concrete compressive strength (fcd=
11 αfck/γm) Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32
Geometric Data
13 Width of Slab/Beam (b) mm 15300 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 25
18 Effective depth of beam/Slab (d) mm 2163 2125
19 Spacing of Reinforcement (s) or mm 80 80
20 Number of Bar (n) Nos 191 135
21 Area of Reinforcement (At) mm2 93880 66268
22 Reinforcement (%) 0.273 0.273
Stress Check
23 Concrete Cross Sectional Area (AC) mm2 34425000 24300000
24 Perimeter in contact with atmosphere (u) mm 35100 26100
25 Notional Size (=2AC/u) mm 1962 1862
26 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.50 1.50
27 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112MPa 12800 12800
28 Modular ratio (m) 15.63 15.63
29 Allowable stress in Steel Cl 12.2.2,IRC 112MPa 330 330
30 Allowable stress in Concrete Cl 12.2.2,IRC 112MPa 16.80 16.80
31 Position of nuetral axis from comp. face (x) mm 555.2 549.6
32 MOA of Compression area mm2 2.36E+09 1.63E+09
33 MOA of Tension area mm2 2.36E+09 1.63E+09
34 Diff. mm2 0 0
35 MOI of cracked section mm4 4.66E+12 3.17E+12
36 Stress in tension reinf. MPa 238.640 236.215
UR 0.72 0.72
37 Status O.K. O.K.
38 Stress in concrete MPa 5.275 5.274
UR 0.31 0.31
39 Status O.K. O.K.
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Load Data
1 Moment KN-m 35838 2745
Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Table 18.1,IRC 112MPa 550 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
11 Design value for concrete compressive strength (fcd= αfck/γm)
Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32
Geometric Data
13 Width of Slab/Beam (b) mm 15300 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 25
17 Effective depth of beam/Slab (d) mm 2163 2125
18 Spacing of Reinforcement (s) or mm 80 80
19 Number of Bar (n) Nos 191 135
20 Area of Reinforcement (At) mm2 93880 66268
21 Reinforcement (%) 0.273 0.273
Stress Check
22 Concrete Cross Sectional Area (AC) mm2 34425000 24300000
23 Perimeter in contact with atmosphere (u) mm 35100 26100
24 Notional Size (=2AC/u) mm 1962 1862
25 Age at Loading days 28 28
26 Relative humidity Table 6.9 , IRC %
112 12800 12800
27 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 15.6 15.6
28 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112
MPa 1924.8 1924.8
29 Modular ratio (m) 103.906 103.906
30 Allowable stress in Steel Cl 12.2.2,IRC 112
MPa 440.0 440.0
31 Allowable stress in Concrete Cl 12.2.2,IRC 112
MPa 12.60 12.60
32 Position of nuetral axis from comp. face (x) mm 1141.2 1127.7
33 MOA of Compression area mm2 9.96E+09 6.87E+09
34 MOA of Tension area mm2 9.96E+09 6.87E+09
35 Diff. mm2 0.000 0.000
36 MOI of cracked section mm4 1.78E+13 1.20E+13
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019
CALCULATION FOR CRACK WIDTH FOR BENDING As per 12.3.4 of IRC 112-2011
41 Wk = Sr,max (esm-ecm)
42 ae = Es/Ecm 6.25 6.25
43 depth hc,eff mm 218.8 312.5
44 Eff area of conc in tension surrounding reinf Ac,eff mm2 3346875 3375000
45 Rr,eff 0.0280 0.0196
46 fctm Mpa 2.800 2.800
47 fct,eff Mpa 2.800 2.800
48 kt 1.500 1.500
49 (esm-ecm)= {ssc - kt(fct,eff/Rr,eff)(1+aeRr,eff)}/Es 0.0002 -0.0011
50 0.6*ssc/Ec 0.0006 0.0001
51 (esm-ecm) 0.0006 0.0001
52 K1 0.80 0.80
53 K2 0.50 0.50
54 Minimum clear cover c 75.00 75.00
55 Srmax = 3.4c+0.425k1k2f/Rreff 407 471
56 Wk = Sr,max (esm-ecm) 0.261 0.033
57 Allowable crack width 0.300 1.300
58 UR 0.87 0.03
59 Status O.K. O.K.
DESIGN OF PIER CAP
INPUT AND
LOAD CALCULATIONS
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019
12.9
2.35 2.05 2.05 2.05 2.05 2.35
0.85 P1 P3 P1
P1
1.2
4.1
1.2
A2
P2 P4 P2
0.85
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019
Load Calculation
Case-2: For maximum torsional moment case (One Span Dislodged case)
LL Reaction on P1 = 0.00 t
Reaction on P1 due to transverse moment = ± 0.00 t
** Ref CWLL analysis page for total LL
Total reaction on P1 = 254.26 t Reaction. It is distributed among 10 bearings
Total reaction on P2 = 0.00 t of one side span only
From the above it is clear that maximum Transverse moment case is governing.
956.824 890.217387
Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 1591 Ton = 286.4 Tons
Force to be resisted by each reaction block = 286.4 Tons for 1.0 blocks
Factored load for seismic 1.5 times = 1.5 429.6 Tons
Height of the Reaction Block 1500 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 4100 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 1125 mm
Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.
At = Hu 10109 mm2
.85*fy
Fed 957 ton > Vrd,c 331.6 ton Vert Stirrups reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 10998 mm2
Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.
Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 507.0667 Ton = 91.3 Tons
Force to be resisted by each reaction block = 91.3 Tons for 1.0 blocks
Factored load for seismic 1.5 times = 1.5 136.9 Tons
Height of the Reaction Block 970 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 1360 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 1500 mm
Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.
At = Hu 3221 mm2
.85*fy
Fed 492 ton > Vrd,c 150.8 ton Vert Stirrups reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 1574 mm2
Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
Designed by: Checked by: Date
of West Bengal on EPC mode
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019
PIER PILES
It is proposed to provide following reinforcement (Grade Fe500 having minimum elongation of 14.5% &
conforming to IS: 1786) in the test pile:
Same test pile as used in lateral load test shall be used. Hence, reinforcement proposed is Pt =0.43%
Under vertical load compression in concrete governs
Vu = 1250 t
2
A= 1.7671 m (for 1500mm dia pile section)
2 2
c = Vu/A = 707.36 t/m < 1680 t/m for M35.