DESIGN REPORT – MAJOR BRIDGE 147+533 Jan 2019

Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning of NH-31 D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur - Salsalabari section in the State of West Bengal on EPC mode

DETAILED ENGINEERING IN CONNECTION WITH REHABILITATION AND


UP-GRADATION TO FOUR LANING OF NH-31 D FROM KM. 113+200 TO KM.
154+854 (PACKAGE-2-A) OF GHOSHPUKUR - SALSALABARI SECTION IN
THE STATE OF WEST BENGAL ON EPC MODE

CLIENT: NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI)

CONTRACTOR: SIMPLEX INFRASTRUCTURE LTD.

DESIGN REPORT – MAJOR BRIDGE 123+518.5

Document Title Design Report – Major Bridge 123+518.5


Project no. 4800197
Document No. 4800197-GGN-DD-013
Version No. D0
Date of submission 29.11.2019
Designer Akshit
Checker Siddhartha

SUMMARY OF REVISIONS

Approved By
Description of
Rev Date
modification/revision
Name/Position Signature

D. Ray
D0 29.11.2019 For review
Design Director

NMDC–RLIANCE–RIZZANI JV
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal

Pier-P5 for Major Bridge at chainage - 123+518.5


(This design is applicable for Pier P3, P4 also)

Pier_P5_8.2m_123+518_9pile
Content

1 Input, Load Calculations, Design forces

2 Pier Section Design

3 Pile Base Pressure Check

4 Pile SLS check

5 Pile ULS Check

6 Pile Structural Desgin

Annex _I Confinement RF

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

1 Inputs:

16.00 Traffic
Direction
FRL 0.00%
+67.354
45.69m span 45.69 m span
2.40 4.1m

Top of pier 0.75


+64.504
cap

6.4m

6.979

GL 57.70
56.78

3.17
2.25
54.53

Finished Road Level (FRL) at the centre of Pier = 67.354 m

Pile cap bottom level / Founding level = 54.53 m

Max depth of scour For Pier from FSL (Ref: ANNEXURE-I)


= 10.46 m

Super Structure

Overall Length Span 1 = 45.69 m

Overall Length Span 2 = 45.69 m


Width of Deck Slab - Span 1 = 16.00 m
Width of Deck Slab - Span 2 = 16.00 m
Super structure Depth = 2.40 m

Crash barrier Height = 1.00 m

Wearing Coat thickness = 0.1 m

Effective Length of span 1 = 43.29 m

Effective Length of span 2 = 43.29 m


Sub Structure
Depth of Bearing + Pedestal = 0.35 m
Pier Cap Top Level = +64.504 m =+67.354-0.1-2.40-0.35 - cross slope
Pier cap - Length along the Traffic = 4.1 m
Pier cap - Length across the Traffic = 12.9 m
Pier cap - Overall Depth = 0.75 m
Centre to centre of bearing (Transverse) = 4.10 m
Centre to centre of bearing (Longitudinal) = 2.40 m
Height of sloping portion of piercap = 0.75 m
Existing GL = 57.70 m

Height of Pier from top of Pile Cap = 7.73 m =+64.504-56.775

Height of Pier below GL = 0.92 m

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design height of pier = 7.80 m
Dimension of Pier along traffic = 1.80 m
Dimension of Pier across traffic = 6.40 m LWL (RL) = +57.70
Scour level HFL = +50.69 m Scour level HFL-S = 51.73
HFL (RL) = +61.15 m Scour level LWL-S = 52.78
Max depth of scour = 10.46 m from HFL
Foundation
Pile - Diameter = 1.5 m Type of Foundation = PILE
No of Pile = 9.0 Nos
Pile cap/Footing -Along Traffic Direction = 10.8 m
Pile cap /Footing -Across Traffic Direction = 11.4 m
Pile cap - Depth = 2.3 m Footing depth at tip = 2.25 m
Min Thickness of soil above pile cap = 0.9 m offset from pier = 0 mm
Materials Modulur ratio = 10
Unit weight of PSC = 25 kN/m3
Unit weight of RCC = 25 kN/m3
Unit weight of Wearing course = 22 kN/m3
Unit weight of Soil fill = 20 kN/m3
Grade of Concrete for Pier = 35 N/mm²
Grade of Concrete for Piles (or Open Foundation) = 35 N/mm²
Grade of Steel used = 550 N/mm²

Load Calculation
1.1 Dead Load
1.1.1 SuperStructure
Load from Span 1
Total Weight = (360.2)×25.0 DL Extra Factor 1.05
Reaction on Bearing(Outer bearing) = 6338 kN

Load from Span 2


Total Weight = =(360.2)×25.0
Reaction on Bearing(Inner bearing) = 6338 kN

Total reaction on pier from two spans 12676 kN


=
ML due to different spans 0 kN-m
=
Transverse moment = 0 kN-m

Total SIDL
Reaction (Outer Bearing) = 1268 kN
Reaction (Inner Bearing) = 1268 kN
Total reaction = 2536 kN

Fixed SIDL ( crash barrier+services)


Reaction ( outer bearing ) = 514.0 kN
Reaction (Inner bearing) = 514.0 kN
Total reaction = 1028 kN
Long. Moment due to diff. Spans = 0.0 kN-m
Transverse Moment = 0.0 kN-m

Variable SIDL(Wearing coat+future overlay)


Reaction (Outer bearing) = 753.9 kN
Reaction (Inner Bearing ) = 753.9 kN
Total reaction due to SIDL(Wearing coat) = 1508 kN
Long. Moment due to diff. Spans = 0.0 kN-m
Transverse Moment = 0.0 kN-m

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.2 Live Load

1.2.1 Governing Load cases for Live Load

Case 1 (Maximum Axial Force case) Without any reduction factor


Axial force = 2520 kN
Longitudinal Moment = 1162 kNm
Transverse Moment = 2395 kNm

Case 2 (Maximum Longitudinal Moment case)-


Axial force = 1808 kN
Longitudinal Moment = 2169 kNm
Transverse Moment = 1718 kNm

Case 3 (Maximum Transverse Moment case)


Axial force = 1628 kN
Longitudinal Moment = 1170 kNm
Transverse Moment = 6358 kNm
1.3 Longitudinal Forces (Braking Force & Friction Force)
1.3.1 70R
Braking Force

No.of vehicles on span = 1 nos.


Total Live load of 1L 70R = 1000 kN 1L Class A 554 kN
For Contribution of B.F = 20% of First Train + 10% of Second train
Contribution of B.F (Fh) (In Normal case) = 318 kN Contribution of B.F (Fh) (In Trans Seis case)
Contribution of B.F (Fh) (Max Possible in Long Seis case) = 0 kN 64 kN
Friction Force

Left side Right side

S.No Description \ Type of Pier P1 P2 P3 P4


Fx Free
1 DL Rxn on free end (input value) 6338 6338 0 Put Max R only for EJ or FR pier.
2 SIDL on free end (input value) 1268 1268 0
Coefficient of Friction 0.05 0.05 0.05 0.05
Frictional force due to DL + SIDL 380 380 0 0

3 LL Reaction Without any reduction factor 2520 2520 0 0


Frictional force due to LL 126 126 0 0
Live Load Lane reduction factor to be
taken = 1.0 LL factor on Seismic = 0.2
Normal Case Trans Seismic Case
Fixed Bearing max of:
Fh-u(Rg+Rq) -189 kN -342 kN
Fh/2+u(Rg+Rq) 665 kN 437.256765 kN

Free bearing
u(Rg+Rq) 506 kN 405

Total Horizontal force normal 1171 kN

Design Longitudinal Force


= 1171 kN 843 kN
(B.F & F.F) - Service
Design Longitudinal Force - seismic = 0 kN DesignTransverse Force - seismic

Design Longitudinal Force - seismic

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4 Seismic force
Calculation of Seismic coefficients
 Z   Sa 
   g 
 2   
Ah 
 R 
 
 I 
Importance factor , I = 1.20
Zone Factor, Z (for Zone II) = 0.36
Response reduction factor, R Long- direction = 3.00
Response reduction factor, R Trans - direction = 3.00
Fundamental natural period

D
T 2 (Annexure D , IRC:6-2017)
1000 F
D= Appropriate dead load of the superstructure and live load in kN
F = Horizontal force in kN required to be applied at the centre of mass of the superstructure for one mm
horizontal deflection at the top of the pier for the earthquake in the transverse direction
and the force to be applied at the top of the bearings for the earthquake in the longitudinal direction
1.4.1 Calculation of Stiffness
Pier
Dimension of Pier - Longitudinal direction = 1.80 m
Dimension of Pier - Transverse direction = 6.40 m
Pier - design height = 7.80 m

Height of the C.G of Superstructure from soffit (DL+SIDL) (h) = 1.38 m

Grade of concrete = M 35
4
M.I in longitudinal direction IL (0.75 Cracked MOI) = 2.333 m =(6.40×1.80^3)/12
4
M.I in transverse direction IT (0.75 Cracked MOI) = 29.491 m =(1.80×6.40^3)/12
Modulus of elasticity of concrete E = 32000 N/mm2 (IRC:112-2011 Table 6.5)
Stiffness in trans direction K1T = 3EI/H3
=6×32000×1000×29.491/((8.15^2)×((3×(1.38))+(2
= 3270004 kN/m
×8.15)))

Stiffness - Longitudinal (3EIL/L3) K1L = 413691 kN/m =3×32000×1000×2.333/(8.15)^3


Height taken for the calculation (H) upto bearing top = 8.15 m
(H of shortest pier in the group)
Piles

Pile - Diameter = 1.50 m

Pile - Length ( L1+Lf) = 13.4 m

Number of pile per pier location "n" = 9 Nos.


4
Moment of inertia of one pile (I) = 0.2485 m =(3.142×(1.50)^4)/64
Grade of concrete = M 35
Young's modulus of elasticity of concrete E
(IRC:112-2011 Table 6.5)
= 32000 N/mm2
Stiffness of one pile k= 12EI / L3 = 39312 kN/m =(12×32000×1000×0.2485/(13.44)^3)
Stiffness of pile group = nk = 353808 kN/m =9×39312
Stiffness in trans direction K2T = 353808 kN/m
Stiffness in Long direction K2L = 353808 kN/m

Total Stiffness
Stiffness " k " = 1/(1/k1+1/k2)
Stiffness in Longitudinal direction "KL" = =1/(1/413691+1/353808)
= 190707 kN/m
= 190.71 kN/mm 413.6908483
Stiffness in transverse direction "KT" = 1/(1/3270004+1/353808)

= 319264 kN/m
= 319.26 kN/mm 3270.003886

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4.2 Calculation of Seismic coefficient in the Longitudinal direction

S.No Description DL SIDL


1 Left bearing 6338 1268
2 Right Bearing 6338 1268
3 Free Pier 0 0
4 Right EJ Pier 0 0
Sub total 12676 2536
Total Load 15212 kN (=12676+2536)

D = 15212 kN
T = 0.384 (eq-1)
Sa/g = 2.500 2.50 for square pier link with this
= 2.500 for wall type pier full Sa/g considered
Horizontal accelaration longitudinal " AhL " = (Sa/g)*(Z/2)/(R/I)
= 0.180 =(0.36/2)×(2.500)/(3.00/1.20)
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017

1.4.3 Calculation of Seismic coefficient in the Transverse direction

S.No Description Load (kN) Remark

1 Dead Load 12676 1.1


2 SIDL 2536 1.1.2
3 Live Load 504 Refer 1.2.1
5 Pier(50%) 0
Total Seismic load (D) 15716

T = 0.139 (eq-1)
Sa/g = 2.500
Horizontal acceleration Transverse " AhT " = (Sa/g)*(Z/2)/(R/I)
= 0.180 (=(0.36/2)×2.500/(3.00/1.20))
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017

1.5 Centrifugal force


C = (WV2)/(127R)
Max Reaction case load = 2520 kN
Max Longitudinal case load = 1808 kN
Max transverse case load = 1628 kN
Design Speed " V " = 0.00 km/hr
Radius of curve " R " = 460 m
Centrifugal force
C.F -max reaction = 0 kN =2520×0×0/(127x460)
C.F-max longitudinal case = 0 kN =1808×0×0/(127x460)
C.F-max transverse case = 0 kN =1628×0×0/(127x460)

1.6 Wind Load


Ht. of Parapet (From C/S) = 1.00 m
Ht. of parapet from GL = 10.63

For height of 10.63m as per IRC:6-2017, Table:4 wind pressure is as below,

Table:4 wind pressure is for basic wind speed 33m/s


Assume Terrain without Obstructions

Wind speed in Delhi location = 36 m/s


(As per IS:875-Part3)
H (m) Pressure
At vehicle top 12.63 582
At parapet top 10.63 559
At girder bot. 7.23 552
2
Avg. Wind pressure (Pz) = 777.60 N/m

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

I) For Superstructure (as per Cl.209.3.3 of IRC:6-2017)

Gust Factor (G) for spans upto 150m = 2.0


Drag Coefficient (CD) = 2(1+c/20d) 2.210344828 = 1.3
Where, c= c/c distance of adjacent girders & d=depth of windward girder
2
Exposed area of superstructure (A1) 45.69 155.346 = 155 m

Transverse wind load (FT) = Pz x A1 x G x CD

= 314 kN
Longitudinal wind load (FL) = 79 kN

Width of Superstructure = 16.0 m


2
Plan Area (A3) 731.04 = 731 m

Lift Coefficient (CL) = 0.75

Vertical wind load (FV) = Pz x A3 x G x CL

(-ve sign indicates upward direction of wind force) = -853 kN


CG of wind load on Superstructure above bearing = 1.70 m

II) For Live load (as per Cl.209.3.3 of IRC:6-2017)

Gust Factor (G) = 2.0


Drag Coefficient (CD) = 1.95

Height of Vehicle = 3.0 m

Exposed ht. of vehicle = 2.00 m

For a height of 12.63m


2
Avg. Wind pressure (Pz) = 777.60 N/m

a) Max. Reaction case

Length of car on span 1 45.69 = 22.8 m

Length of car on span 2 45.69 = 22.8 m


2
Exposed area of Vehicle = 91.4 m
Transverse wind load (FT) = 277 kN

Longitudinal wind load (FL) = 69.3 kN

b) Max. long. moment case

Length of car on span 1 = 46 m

Length of car on span 2 = 46 m


2
Exposed area of Vehicle = 0.0 m
Transverse wind load (FT) = 0 kN

Longitudinal wind load (FL) = 0.0 kN

c) Max. trans. moment case

Length of car on span 1 = 23 m

Length of car on span 2 = 23 m


2
Exposed area of Vehicle 54.828 = 91.4 m
Transverse wind load (FT) = 277 kN

Longitudinal wind load (FL) = 69.3 kN

CG of wind load due to Live load above bearing = 4.35 m

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

III) For Substructure (as per Cl.209.4 of IRC:6-2017)

Height of pier (Piercap top to GL) h = 6.880 m

Dim. Parallel to wind d = 1.8 m

Dim. Perpendicular to wind b = 6.40 m

h/b = 1.08
d/b = 0.281
Drag Coefficient (CD) = 2.20
2
Exposed area of substructure (A1) = 14 m
2
Wind pressure (Pz) = 777.6 N/m
Transverse wind load (FT) Pz x A1 x G x CD = 48 kN

Height of pier (Piercap top to GL) h = 6.9 m

Dim. Parallel to wind d = 6.40 m

Dim. Perpendicular to wind b = 1.8 m

h/b = 3.82
d/b = 3.556
Drag Coefficient (CD) 1.482222222 = 1.14
2
Exposed area of substructure (A1) = 84.6 m
2
Wind pressure (Pz) = 777.6 N/m
Longitudinal wind load (FL) = 151 kN

1.9 Horizontal Force due to Water Current:


Average velocity of flow (Ref:Annexure-v) V = 3 m/sec

Lowest Bed level (As per hydrologycal data) = 57.695 m


say = 57.695 m
High Flood level = 61.15 m

Height of the pier exposed to water pressure - HFL condition = 4.37


Height of the pier exposed to water pressure - LWL condition = 0.92
Component of maximum velocity in lateral direction =(2)^0.5×3 = 4.24 m/sec
Width of the pier perpendicular to the direction of water flow = 1.80 m
Width of the Pile cap perpendicular to the direction of water flow = 10.80 m
Width of the pier parellal to the direction of water flow = 6.40 m
Width of the Pile cap parellal to the direction of water flow = 11.40 m

Intensity of pressure due to water P = 52KV2


Constant K depends on the shape - For pier & footings K = 0.66
Intensity of pressure =52×0.66×4.24^2 = 617.8 kg/m2
=617.76×9.81/1000 = 6.1 kN/m2
Variation of force due to water current over pier

Variation of velocity with depth (at HFL -S) (at HFL -N)
(at HFL) 6.06 6.06 kN/m2

HFL

10.5 4.37
3.25 3.53 kN/m2 Pier bottom
1.80 9.41 2.22 kN/m2 Pile bottom

SCOUR LEVEL

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity

HFL 6.1 0.940 =6.1×0.940 5.69 0.342 =6.1×0.342 2.07


Bottom of pier level 3.5 0.940 =3.5×0.940 3.32 0.342 =3.5×0.342 1.21

Bottom of footing level 2.2 0.940 =2.2×0.940 2.09 0.342 =2.2×0.342 0.76

Transverse Forces & Moments:


Force Transverse Moment at
Direction Component transverse
HT Lever arm Pier bottom Lever arm Pile Bottom

on pier 35.44 2.377 84.246 - -


Transverse
on pile cap 65.69 - - 1.210 243.46

1.209969789

Longitudinal Forces & Moments:


Longitudinal Moment at
Force long
Direction Component
HL Lever arm Pier bottom Lever arm Pile Bottom

on pier 45.86 2.3773 109.025 - -


Longitudinal
on pile cap 25.24 - - 1.21 242.75
1.209969789

HFL - SEISMIC CASE


degree to20
be considered
Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity
HFL 6.1 0.940 =6.1×0.940 5.69 0.342 =6.1×0.342 2.07
Bottom of pier level 3.2 0.940 =3.2×0.940 3.05 0.342 =3.2×0.342 1.11

Bottom of footing level 1.8 0.940 =1.8×0.940 1.69 0.342 =1.8×0.342 0.62

Transverse Forces & Moments:


Force Transverse Moment at
Direction Component transverse
HT Lever arm Pier bottom Lever arm Pile Bottom
on pier 34.40 2.405 82.732 - -
Transverse
on pier cap 57.61 - - 1.233 231.14

1.232648635
Longitudinal Forces & Moments:

Force long Longitudinal Moment at


Direction Component
HL Lever arm Pier bottom Lever arm Pile Bottom
on pier 44.51 2.405 107.065 - -
Longitudinal
on pier cap 22.13 - - 1.23 234.50

1.232648635

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

1.10 Buoyancy : HFL

Upto pier level Volume of water displaced 50.3 m^3


Weight to be deducted 503.4 kN

Upto pile cap Volume of water displaced 277.0 m^3


bottom / fdn
Weight to be deducted 2770.2 kN

Buoyancy : LWL

Volume of water displaced 10.6 m^3


Upto pier level
Weight to be deducted 106.0 kN

Upto pile cap Volume of water displaced 277.0 m^3


bottom
Weight to be deducted 2770.2 kN

1.51 Summary of Loads at the Top of Pier cap

P Horizontal Force (kN) Lever arm (m) Moment (kN-m)


S.No Description of Load
(kN) HT HL eT eL MT ML
1 D.L (Superstructure ) 12676 0 0 0 0 0 0
D.S.S 0
2 S.I.D.L- Fixed 1028 0 0 0 0 0 0
S.I.D.L- variable 1508 0 0 0 0 0 0
3 Live Load
L.L (Case 1-Max P) 2520 0 0 0.00 0.00 2395 1162
L.L (Case 2-Max ML) 1808 0 0 0.00 0.00 1718 2169
L.L (Case 3 - Max MT) 1628 0 0 0.00 0.00 6358 1170
4 Longitudinal Forces (additional vertical force is neglected)
4.1 Normal Condition 0 0 1171 0 0.35 0 410
4.2 During Seismic Condition 0 0 0 0 0.35 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -1521 2282 0 1.38 0 3151 0
5.1.2 Superstructure (SIDL) -304 456 0 2.80 0 1278 0
5.1.3 Superstructure (LL)
L.L (-Max P) -60 91 0 4.050 0 367 0
L.L ( Max ML) -43 65 0 4.050 0 264 0
L.L (- Max MT) -39 59 0 4.050 0 237 0
5.1.4 Substructure
5.2 Seismic Force (Longitudinal)
5.2.1 Superstructure (DL) -1521 0 2282 0 0.35 0 799
5.2.2 Superstructure (SIDL) -304 0 456 0 0.35 0 160
5.2.3 Substructure 0 0 0 0 0 0 0
6 Centrifugal Force
Max P 0 0 0 4.05 0 0 0
Max ML 0 0 0 4.05 0 0 0
Max MT 0 0 0 4.05 0 0 0
7 Wind Load
On superstructure -853 314 79 2.05 2.05 644 161
Live load max reaction case 0 277 69 4.35 4.35 1205 301
Live load max longitudinal case 0 0 0 4.35 4.35 0 0
Live load max Transverse case 0 277 69 4.35 4.35 1205 301
8 Buoyancy 0 0 0 0 0 0 0
9 Water Current 0 0 0 0 0 0 0

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.52 Load Combination at the Top of Pier cap for ULS condition

P Horizontal Force (kN) Moment (kN-m)


S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1) 23396 532 1890 4538 2426
2 Group I (Case-2) 22541 283 1828 2641 3363
3 Group I (Case-3) 22570 532 1890 10248 2611
4 Group II(Case-1) Wind Load 22179 887 1569 4977 2234
5 Group II(Case-2) Wind Load 21523 471 1465 2546 2708
6 Group II(Case-3) Wind Load 21545 887 1569 9354 2376

7 Group III (Case-1) Seismic Transverse 18713 4243 169 7578 268

Refer Annexure
8 Group III (Case-2) Seismic Transverse 18625 4205 169 7314 429

9 Group III (Case-3) Seismic Transverse 18635 4195 169 8144 293

10 Group IV (Case-1) Seismic Longitudinal 18804 0 4107 383 1624

11 Group IV (Case-2) Seismic Longitudinal 18690 0 4107 275 1785

12 Group IV (Case-3) Seismic Longitudinal 18694 0 4107 1144 1648

1.53 Load Combination at the Top of Pier cap for SLS condition

P Horizontal Force (kN) Moment (kN-m)


S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1 service-Rare) 17018 355 1260 3025 1617
2 Group I (Case-2 service-Rare) 16448 188 1219 1760 2242
3 Group I (Case-3 service-Rare) 16467 355 1260 6832 1741
4 Group II (Case-1 wind load-Rare) 16173 591 1026 3286 1467
5 Group II (Case-2 wind load-Rare) 15745 314 957 1674 1770
6 Group II (Case-3 wind load-Rare) 15760 591 1026 6141 1560
7 Group III (Case-1 Service-Frequent) 16599 296 952 2361 1236
8 Group III (Case-2 Service-Frequent) 16172 157 918 1353 1689 Refer Annexure
9 Group III (Case-3 Service-Frequent) 16186 296 952 5216 1329

10 Group IV (Case 1 Wind Load-Frequent) 15405 355 323 1493 545

11 Group IV (Case 2 Wind Load-Frequent) 15291 188 281 275 526

12 Group IV (Case 3 Wind Load-Frequent) 15295 355 323 1868 570

13 Group V (Case-1- Quasi permanent) 15513 0 0 0 0

1.54 Dead Load - Substructure


12.90 4.10
4.1 m

W1
0.750

0.750
W2 Traffic Direction

5.38
W3

6.40 1.80
0.92
2.25 m

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Load of Pier
W2 Area of flared portion (top) = 52.89 m2 Pedestal :
Area of flared portion (bot.) = 29.52 m2 Width = 1.100 m
Height of flared portion = 0.75 m Length = 1.100 m
Volume of flared portion = 30.5 m3 P (KN) e (m) from Pier Base
CG of the flared portion from top of straight
= 0.42 m 762.02 6.72
portion of pier

W3 Width = 6.40 m
Breadth = 1.80 m
Area of c/s of straight portion = 11.520 m2
Total Height of straight portion = 6.30 m =7.80-0.75-0.75
Volume of straight portion = 72.576 m3 P (KN) e (m) from Pier Base
1814.4 3.15
W1 Pier Cap
Length of pier cap = 12.90 m
Width of pier cap = 4.1 m
Avg.Thickness of pier cap = 0.75 m P (KN) e (m) from Pier Base
Volume of pier cap = 39.6675 m3 991.6875 7.425

Self wt of pier + pier cap = 3568 kN


Combined 3568 5.100
1.55 Summary of Load at the Pile Cap Top
Height of the pier = 7.800 m

P Horizontal Force (kN) Lever arm (m) Moment (kN-m)


S.No Description of Load
(kN)
HT HL eT eL MT ML
1 D.L (Super + Substructure ) 16244 0 0 0 0 0 0
D.S.S 0 0 0 0 0 0 0
2 S.I.D.L- Fixed 1028 0 0 0 0 0 0
S.I.D.L- variable 1508 0 0 0 0 0 0
3 Live Load
L.L (Case 1- Max P) 2520 0 0 0 0 2395 1162
L.L (Case 2 - Max ML) 1808 0 0 0 0 1718 2169
L.L (Case 3 - MT) 1628 0 0 0 0 6358 1170
4 Longitudinal Forces (additional vertical force is neglected)
4.1 Normal Condition 0 0 1171 0 8.15 0 9547
4.2 During Seismic Condition 0 0 0 0 8.15 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -1521 2282 0 9.18 0 20948 0
5.1.2 Superstructure (SIDL) -304 456 0 10.60 0 4838 0
5.1.3 Superstructure (LL)
L.L (Case 1-Max P) -60 91 0 11.85 0 1075 0
L.L (Case 2 - Max ML) -43 65 0 11.85 0 771 0
L.L (Case 3 - Max MT) -39 59 0 11.85 0 695 0
5.1.4 Substructure -428 642 0 5.10 0 3275 0
5.2 Seismic Force (Longitudinal)
5.2.1 Superstructure (DL) -1521 0 2282 0 8.15 0 18596
5.2.2 Superstructure (SIDL) -304 0 456 0 8.15 0 3720
5.2.3 Substructure -428 0 642 0.00 5.10 0 3275
6 Centrifugal Force
Max P 0 0 0 11.85 0 0 0
Max ML 0 0 0 11.85 0 0 0
Max MT 0 0 0 11.85 0 0 0
7 Wind Load
On superstructure -853 314 79 9.85 9.85 3094 773
Live load max reaction case 0 277 69 11.55 11.55 3201 800
Live load max longitudinal case 0 0 69 11.55 11.55 0 800
Live load max transverse case 0 277 69 11.55 11.55 3201 800
On substructure 0 48 151 3.90 3.90 188 587
8 Vehicle Collision Load
Longitudinal - Main Component 0 0 1000 0 2.4 0 2420
Transverse - Main Component 0 500 0 3.92 0 1960 0
Longitudinal - Residual Component 0 0 500 0 2.4 0 1210
Transverse - Residual Component 0 250 0 3.92 0 980 0
8 Construction Load
8.1 L.G. Case 1 (Max 'P') 0 0 0.00 7.80 7.80 0 0
8.2 L.G. Case 2 (Max 'ML') 0 0 0 7.80 7.80 0 0
8.3 L.G. Case 3 (Max 'MT') 0 0 0 7.80 7.80 0 0

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
8.4 Dead Load of Superstructure 0 0 0 0.00 0.00 0 0
8.5 Dead Load of Substructure 3568 0 0 0.00 0.00 0 0
8.6 Seismic Load Superstructure 0 0 0 9.11 0.00 0 0
8.7 Seismic Load Substructure 0 0 0 5.10 0.00 0 0

Newly added 8 Water current


LWL Normal/Seismic
HFL Normal 35 45.9 84 109.0
HFL-seismic 34 45 83 107
9 Buyoyancy
LWL Normal/Seismic -106
HFL Normal -503
HFL-seismic -503
10 Hydrodynamic
LWL Seismic 2 2 1 1
HFL Seismic 14 14 27 27

1.56 Seismic Force Combination


S.No Combination P HT HL MT ML
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -694 3471 1014 30137 7677
1.2 (0.3L+T+0.3V) Max. P 694 3471 1014 30137 7677
1.3 (0.3L+T-0.3V) Max ML -689 3445 1014 29833 7677
1.4 (0.3L+T+0.3V) Max ML 689 3445 1014 29833 7677
1.5 (0.3L+T-0.3V) Max MT -688 3439 1014 29757 7677
1.6 (0.3L+T+0.3V) Max MT 688 3439 1014 29757 7677
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -676 1041 3380 9041 25591
2.2 (L+0.3T+0.3V) Max. P 676 1041 3380 9041 25591
2.3 (L+0.3T-0.3V) Max ML -676 1034 3380 8950 25591
2.4 (L+0.3T+0.3V) Max ML 676 1034 3380 8950 25591
2.5 (L+0.3T-0.3V) Max MT -676 1032 3380 8927 25591
2.6 (L+0.3T+0.3V) Max MT 676 1032 3380 8927 25591
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -2314 1041 1014 9041 7677
3.2 (0.3L+0.3T+V) Max. P 2314 1041 1014 9041 7677
3.3 (0.3L+0.3T-V) Max ML -2297 1034 1014 8950 7677
3.4 (0.3L+0.3T+V) Max ML 2297 1034 1014 8950 7677
3.5 (0.3L+0.3T-V) Max MT -2293 1032 1014 8927 7677
3.6 (0.3L+0.3T+V) Max MT 2293 1032 1014 8927 7677

1.57 Load Combination at the Top of Pile cap - SLS

LWL - Case
Moment Resultant
P Horizontal Force (kN) Moment (kN-m) kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1 service-Rare) 20570 384 1350 5805 11773 13127
2 Group I (Case-2 service-Rare) 20000 217 1350 3343 12579 13015
3 Group I (Case-3 service-Rare) 20020 384 1350 9612 11897 15294
4 Group II (Case-1 wind load-Rare) 19725 639 1177 7919 10018 12771
5 Group II (Case-2 wind load-Rare) 19298 362 1177 1863 10010 10182
6 Group II (Case-3 wind load-Rare) 19312 639 1177 8324 9499 12630
7 Group III (Case-1 Service-Frequent) 20151 320 1028 4678 8938 10088
8 Group III (Case-2 Service-Frequent) 19724 181 1028 2672 9542 9909 Refer Annexure

9 Group III (Case-3 Service-Frequent) 19738 320 1028 7533 9031 11760

10 Group IV (Case 1 Wind Load-Frequent) 18957 384 413 4273 3392 5455

11 Group IV (Case 2 Wind Load-Frequent) 18843 217 413 2244 3553 4202

12 Group IV (Case 3 Wind Load-Frequent) 18847 384 413 5034 3417 6084

13 Group V (Case-1- Quasi permanent) 19066 0 0 0 0 0

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

HFL - Case

Horizontal Force (kN) Moment (kN-m) Moment Resultant


P
S.No Load Combination kNm Remark
(kN) HT HL MT ML

1 Group I (Case-1 service-Rare) 20510 419 1396 5890 11882 13262


2 Group I (Case-2 service-Rare) 19941 253 1396 3428 12688 13142
3 Group I (Case-3 service-Rare) 19960 419 1396 9696 12006 15432
4 Group II (Case-1 wind load-Rare) 19665 675 1223 8004 10128 12908
5 Group II (Case-2 wind load-Rare) 19238 398 1223 1947 10119 10305
6 Group II (Case-3 wind load-Rare) 19252 675 1223 8409 9608 12768
7 Group III (Case-1 Service-Frequent) 20092 355 1074 4762 9047 10224 Refer Annexure
8 Group III (Case-2 Service-Frequent) 19664 217 1074 2756 9651 10037
9 Group III (Case-3 Service-Frequent) 19679 355 1074 7617 9140 11898
10 Group IV (Case 1 Wind Load-Frequent) 18898 419 459 4357 3501 5589
11 Group IV (Case 2 Wind Load-Frequent) 18784 253 459 2328 3662 4339
12 Group IV (Case 3 Wind Load-Frequent) 18787 419 459 5118 3526 6215
13 Group V (Case-1- Quasi permanent) 19006 0 0 0 0 0

1.58 Load Combination at the Top of Pile cap - ULS


LWL- Case
P Horizontal Force (kN) Moment (kN-m) Moment Resultant
S.No Load Combination kNm Remark
(kN) HT HL MT ML
1 Group I (Case-1) 28197 576 2026 8708 17660 19690
2 Group I (Case-2) 27342 326 2026 5015 18868 19523
3 Group I (Case-3) 27371 576 2026 14417 17845 22941

4 Group II(Case-1) Wind Load 26980 959 1795 11927 15290 19391

5 Group II(Case-2) Wind Load 26324 544 1795 6503 16216 17471

6 Group II(Case-3) Wind Load 26347 959 1795 16304 15431 22449

7 Group III (Case-1A) Seismic Transverse(-V) 25212 5209 1690 45590 13612 47578
Refer Annexure
8 Group III (Case-1B) Seismic Transverse(+V) 27295 5209 1690 45590 13612 47578

9 Group III (Case-2A) Seismic Transverse (-V) 25106 5171 1690 45026 13773 47085

Group III (Case-2B) Seismic Transverse


10 25106 5171 1690 45026 13773 47085
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 25111 5161 1690 45780 13636 47768

12 Group III (Case-3B) Seismic Transverse(+V) 27175 5161 1690 45780 13636 47768

Group IV (Case-1A) Seismic Longitudinal(-


13 25239 1563 5073 13945 38574 41017
V)
Group IV (Case-1B) Seismic
14 27287 5169 1524 45133 11703 46626
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 25125 1551 5073 13700 38735 41086
V)
Group IV (Case-2B) Seismic
16 27153 1551 5073 13700 38735 41086
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 25129 1548 5073 14535 38598 41244
V)
Group IV (Case-3B) Seismic
18 27157 1548 5073 14535 38598 41244
Longitudinal(+V)

18 Group V (Case-1A) Seismic Vertical(-V) 22782 1563 1690 13945 13612 19487

18 Group V (Case-1B) Seismic Vertical(+V) 29724 1563 1690 13945 13612 19487

18 Group V (Case-2A) Seismic Vertical(-V) 22694 1551 1690 13700 13773 19426

18 Group V (Case-2B) Seismic Vertical(+V) 29585 1551 1690 13700 13773 19426

18 Group V (Case-3A) Seismic Vertical(-V) 22704 1548 1690 14535 13636 19930

18 Group V (Case-3B) Seismic Vertical(+V) 29582 1548 1690 14535 13636 19930

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL- Case
Horizontal Force (kN) Moment (kN-m) Moment Resultant
P kNm
S.No Load Combination Remark
(kN) HT HL MT ML

1 Group I (Case-1) 28137 611 2071 8792 17769 19825

2 Group I (Case-2) 27283 362 2071 5099 18977 19650

3 Group I (Case-3) 27311 611 2071 14502 17954 23079

4 Group II(Case-1) Wind Load 26920 995 1841 12011 15399 19529

5 Group II(Case-2) Wind Load 26265 579 1841 6587 16325 17604

6 Group II(Case-3) Wind Load 26287 995 1841 16389 15540 22585

7 Group III (Case-1A) Seismic Transverse(-V) 24814 5255 1739 45698 13727 47715 Refer annex

8 Group III (Case-1B) Seismic Transverse(+V) 26897 5255 1739 45698 13727 47715

9 Group III (Case-2A) Seismic Transverse (-V) 24708 5217 1739 45134 13888 47222

Group III (Case-2B) Seismic Transverse


10 26775 5217 1739 45134 13888 47222
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 24714 5207 1739 45889 13751 47905

12 Group III (Case-3B) Seismic Transverse(+V) 26777 5207 1739 45889 13751 47905

Group IV (Case-1A) Seismic Longitudinal(-


13 24842 1601 5129 14036 38707 41173
V)
Group IV (Case-1B) Seismic
14 26889 5207 1580 45224 11836 46747
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 24728 1589 5129 13791 38868 41242
V)
Group IV (Case-2B) Seismic
16 26756 1589 5129 13791 38868 41242
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 24732 1586 5129 14626 38731 41401
V)
Group IV (Case-3B) Seismic
18 26760 1586 5129 14626 38731 41401
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 22385 1601 1739 14036 13727 19632

20 Group V (Case-1B) Seismic Vertical(+V) 29327 1601 1739 14036 13727 19632

21 Group V (Case-2A) Seismic Vertical(-V) 22296 1589 1739 13791 13888 19572

22 Group V (Case-2B) Seismic Vertical(+V) 29187 1589 1739 13791 13888 19572

23 Group V (Case-3A) Seismic Vertical(-V) 22307 1586 1739 14626 13751 20075

24 Group V (Case-3B) Seismic Vertical(+V) 29185 1586 1739 14626 13751 20075

25 Group VI (Accidental) Case 1 19082 0 2379 287 10930 10934

26 Group VI (Accidental) Case 2 19865 0 2379 5772 12092 13399

27 Group VI (Accidental) Case 3 19804 35 2424 4376 11689 12481

28 Group VI (Accidental) Case 4 20217 785 924 4461 7967 9131

29 Group VI (Accidental) Case 5 19789 785 924 4055 8571 9481

30 Group VI (Accidental) Case 6 19804 785 924 7316 8059 10884

11.52 123
1.60 Summary of Load at pile cap bottom Footing 277
Depth of pile cap /Open foundation = 2.25 W1 6926 e1 1.125
Height from Piercap Top = 10.05 m W2 0 e2 2.250
Dead load of the Pier at this level = 3568 kN Soil W3 2053 e3 2.71
Dead load of the pile cap = 6926 kN W= 8979 e= 1.487

0.000
3.17
0.9 e3
Wt of soil 2053 KN e2
Wt of water from GL to HFL acting on Footing 3850 KN e1
buyoyancy on soil 1027 KN

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Pier +Piercap 3568 e11 = 7.350
Total weight to be used for seismic in foundation 6926 KN Sub+Fdn 12547 3.4809
(Only for exposed pile cap, Zero in case of embedded Open foundation or pile cap)

P Horizontal Force (kN) Lever arm (m) Moment (kN-m)


S.No Description of Load
(kN)
HT HL eT eL MT ML
1 D.L (Super + Substructure ) 25223 0 0 0 0 0 0
D.S.S 0 0 0 0 0 0 0
2 S.I.D.L- Fixed 1028 0 0 0 0 0 0
S.I.D.L- variable 1508 0 0 0 0 0 0
3 Live Load
L.L (Case 1-Max P) 2520 0 0 0 0 2395 1162
L.L (Case 2 - Max ML) 1808 0 0 0 0 1718 2169
L.L (Case 3 - Max MT) 1628 0 0 0 0 6358 1170
4 Longitudinal Forces (additional vertical force is neglected) *** HL in trans seismic is not shown here. Cell H679 linked separately in Annex tables
4.1 Normal Condition 0 0 1171 0 10.40 0 12183
4.3 During Seismic Condition 0 0 0 0 10.40 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -1521 2282 0 11.43 0 26082 0
5.1.2 Superstructure (SIDL) -304 456 0 12.85 0 5865 0
5.1.3 Superstructure (LL)
L.L (Case 1-Max P) -60 91 0 14.10 0 1279 0
L.L (Case 2 - Max ML) -43 65 0 14.10 0 918 0
L.L (Case 3 - Max MT) -39 59 0 14.10 0 827 0
5.1.4 Substructure + Foundation -1259 1889 0 3.48 0 6575 0
5.2 Seismic Force (Longitudianal)
5.2.1 Superstructure (DL) -1521 0 2282 0 10.40 0 23729
5.2.2 Superstructure (SIDL) -304 0 456 0 10.40 0 4747
5.2.3 Substructure + Foundation -1259 0 1889 0 3.48 0 6575
6 Centrifugal Force
Max P 0 0 0 14.10 0 0 0
Max ML 0 0 0 14.10 0 0 0
Max MT 0 0 0 14.10 0 0 0
7 Wind Load
On superstructure -853 314 79 12.10 12.10 3800 950
Live load max reaction case 0 277 69 13.80 13.80 3824 956
Live load max longitudinal case 0 0 69 13.80 13.80 0 956
Live load max transverse case 0 277.12 69 13.80 13.80 3824 956
On substructure 0 48 151 6.15 6.15 297 926
8 Construction Load
8.1 L.G. Case 1 (Max 'P') 0 0 0 10.05 10.05 0 0
8.2 L.G. Case 2 (Max 'ML') 0 0 0 10.05 10.05 0 0
8.3 L.G. Case 3 (Max 'MT') 0 0 0 10.05 10.05 0 0
8.4 Dead Load of the Superstructure 0 0 0 0 0 0 0
8.5 Dead Load of the Substructure 10494 0 0 0 0 0 0
8.6 Seismic Load of Superstructure 0 0 0 11.36 0.00 0 0
8.7 Seismic Load of Substructure 0 0 0 7.35 0.00 0 0

8 Water current
LWL Normal/Seismic
HFL Normal 101 71.1 243 242.7
HFL-seismic 92 67 231 235
9 Buyoyancy
LWL Normal/Seismic -3903
HFL Normal -4300
HFL-seismic -4300
10 Hydrodynamic
LWL Seismic 144 160 142 158
HFL Seismic 150 166 190 205

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.61 Seismic Force Combination
S.No Combination P HT HL MT ML
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -944 4718 1388 39801 10515
1.2 (0.3L+T+0.3V) Max. P 944 4718 1388 39801 10515
1.3 (0.3L+T-0.3V) Max ML -938 4692 1388 39440 10515
1.4 (0.3L+T+0.3V) Max ML 938 4692 1388 39440 10515
1.5 (0.3L+T-0.3V) Max MT -937 4686 1388 39349 10515
1.6 (0.3L+T+0.3V) Max MT 937 4686 1388 39349 10515
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -925 1415 4627 11940 35051
2.2 (L+0.3T+0.3V) Max. P 925 1415 4627 11940 35051
2.3 (L+0.3T-0.3V) Max ML -925 1408 4627 11832 35051
2.4 (L+0.3T+0.3V) Max ML 925 1408 4627 11832 35051
2.5 (L+0.3T-0.3V) Max MT -925 1406 4627 11805 35051
2.6 (L+0.3T+0.3V) Max MT 925 1406 4627 11805 35051
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -3145 1415 1388 11940 10515
3.2 (0.3L+0.3T+V) Max. P 3145 1415 1388 11940 10515
3.3 (0.3L+0.3T-V) Max ML -3128 1408 1388 11832 10515
3.4 (0.3L+0.3T+V) Max ML 3128 1408 1388 11832 10515
3.5 (0.3L+0.3T-V) Max MT -3124 1406 1388 11805 10515
3.6 (0.3L+0.3T+V) Max MT 3124 1406 1388 11805 10515

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.62 Summary of Load at pile cap bottom at SLS condition
LWL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML

1 Group I (Case-1 service-Rare) 28980 384 1350 6669 14812 16244


2 Group I (Case-2 service-Rare) 28410 217 1350 3832 15617 16080
3 Group I (Case-3 service-Rare) 28429 384 1350 10475 14935 18242
4 Group II (Case-1 wind load-Rare) 28134 639 1177 9358 12667 15749
5 Group II (Case-2 wind load-Rare) 27707 362 1177 5128 13270 14227
6 Group II (Case-3 wind load-Rare) 27721 639 1177 12213 12759 17662
7 Group III (Case-1 Service-Frequent) 28561 320 1028 5397 11251 12478
8 Group III (Case-2 Service-Frequent) 28133 181 1028 3079 11854 12248 Refer Annexure
9 Group III (Case-3 Service-Frequent) 28148 320 1028 8252 11343 14027

10 Group IV (Case 1 Wind Load-Frequent) 27367 384 413 5136 4322 6712

11 Group IV (Case 2 Wind Load-Frequent) 27253 217 413 2733 4483 5250

12 Group IV (Case 3 Wind Load-Frequent) 27256 384 413 5897 4346 7326

13 Group V (Case-1- Quasi permanent) 27475 0 0 0 0 0

HFL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML

1 Group I (Case-1 service-Rare) 32770 485 1422 6912 15055 16566

2 Group I (Case-2 service-Rare) 32200 319 1422 4076 15860 16375

3 Group I (Case-3 service-Rare) 32220 485 1422 10718 15178 18581

4 Group II (Case-1 wind load-Rare) 31925 741 1248 9602 12909 16089

5 Group II (Case-2 wind load-Rare) 31498 463 1248 5371 13513 14542

6 Group II (Case-3 wind load-Rare) 31512 741 1248 12456 13002 18006

7 Group III (Case-1 Service-Frequent) 32351 421 1099 5641 11493 12803 Remark

8 Group III (Case-2 Service-Frequent) 31924 282 1099 3323 12097 12545

9 Group III (Case-3 Service-Frequent) 31938 421 1099 8496 11586 14367

10 Group IV (Case 1 Wind Load-Frequent) 31157 485 484 5379 4565 7055

11 Group IV (Case 2 Wind Load-Frequent) 31043 319 484 2977 4726 5585

12 Group IV (Case 3 Wind Load-Frequent) 31047 485 484 6141 4589 7666

13 Group V (Case-1- Quasi permanent) 31266 0 0 0 0 0

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

1.63 Summary of Load for Base Pressure at pile cap bottom


LWL- Case
Horizontal Force (kN) Moment (kN-m) Moment Resultant
P
S.No Load Combination kNm Remark
(kN) HT HL MT ML

1 Group I (Case-1) 25872 0 1171 1916 13113 13252

2 Group I (Case-2) 25302 0 1171 1374 13918 13986

3 Group I (Case-3) 25322 0 1171 5722 13236 14420

4 Group II(Case-1) Wind Load 25019 639 1470 9837 15945 18735

5 Group II(Case-2) Wind Load 24450 362 1470 5471 16750 17621

6 Group II(Case-3) Wind Load 24469 639 1470 13644 16068 21079

7 Group III (Case-1A) Seismic Transverse(-V) 22985 6512 2765 53951 26612 60157

8 Group III (Case-1B) Seismic Transverse(+V) 25533 6512 2765 54257 23194 59007 Refer Annexure

9 Group III (Case-2A) Seismic Transverse (-V) 22878 6478 2765 53661 23355 58523

Group III (Case-2B) Seismic Transverse


10 25412 6478 2765 53661 23355 58523
(+V)

11 Group III (Case-3A) Seismic Transverse(-V) 22884 6469 2765 54408 23219 59155

12 Group III (Case-3B) Seismic Transverse(+V) 25414 6469 2765 54408 23219 59155

Group IV (Case-1A) Seismic Longitudinal(-


13 23010 1954 6406 16545 47663 50453
V)
Group IV (Case-1B) Seismic
14 25508 1954 6406 16545 47663 50453
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 22896 1943 6406 16291 5302 17132
V)
Group IV (Case-2B) Seismic
16 25394 1943 6406 16291 47824 50523
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 22900 1941 6406 17123 47688 50669
V)
Group IV (Case-3B) Seismic
18 25398 1941 6406 17123 47688 50669
Longitudinal(+V)

19 Group V (Case-1A) Seismic Vertical(-V) 20013 1954 3093 16545 26612 31336

20 Group V (Case-1B) Seismic Vertical(+V) 28505 1954 3093 16545 26612 31336

21 Group V (Case-2A) Seismic Vertical(-V) 19922 1943 3093 16291 26773 31340

22 Group V (Case-2B) Seismic Vertical(+V) 28368 1943 3093 16291 26773 31340

23 Group V (Case-3A) Seismic Vertical(-V) 19932 1941 3093 17123 26637 31666

24 Group V (Case-3B) Seismic Vertical(+V) 28366 1941 3093 17123 26637 31666

HFL- Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML

1 Group I (Case-1) 29325 101 1243 2159 13355 13529

2 Group I (Case-2) 28755 101 1243 1618 14161 14253

3 Group I (Case-3) 28774 101 1243 5966 13479 14740

4 Group II(Case-1) Wind Load 28472 741 1541 10081 16187 19070

5 Group II(Case-2) Wind Load 27902 463 1541 5715 16993 17928

6 Group II(Case-3) Wind Load 27922 741 1541 13887 16311 21422

7 Group III (Case-1A) Seismic Transverse(-V) 26438 6611 2833 54229 23442 59079

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

8 Group III (Case-1B) Seismic Transverse(+V) 28986 6611 2833 54536 23442 59361

9 Group III (Case-2A) Seismic Transverse (-V) 26331 6576 2833 53939 23604 58878

Group III (Case-2B) Seismic Transverse


10 28865 6576 2833 53939 23604 58878
(+V)

11 Group III (Case-3A) Seismic Transverse(-V) 26337 6567 2833 54686 23467 59508

12 Group III (Case-3B) Seismic Transverse(+V) 28867 6567 2833 54686 23467 59508

Group IV (Case-1A) Seismic Longitudinal(-


13 26463 2048 6479 16791 47945 50800
V)
Group IV (Case-1B) Seismic
14 28961 2048 6479 16791 47945 50800
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 26349 2037 6479 16536 5583 17453
V)
Group IV (Case-2B) Seismic
16 28847 2037 6479 16536 48106 50869
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 26353 2035 6479 17369 47970 51017
V)
Group IV (Case-3B) Seismic
18 28851 2035 6479 17369 47970 51017
Longitudinal(+V)

19 Group V (Case-1A) Seismic Vertical(-V) 23466 2048 3162 16791 26861 31677

20 Group V (Case-1B) Seismic Vertical(+V) 31958 2048 3162 16791 26861 31677

21 Group V (Case-2A) Seismic Vertical(-V) 23375 2037 3162 16536 27022 31680

22 Group V (Case-2B) Seismic Vertical(+V) 31821 2037 3162 16536 27022 31680

23 Group V (Case-3A) Seismic Vertical(-V) 23385 2035 3162 17369 26885 32008

24 Group V (Case-3B) Seismic Vertical(+V) 31819 2035 3162 17369 26885 32008

1.64 Summary of Load at pile cap bottom at ULS condition

LWL- CASE

P Horizontal Force (kN) Moment (kN-m) Moment Resultant


S.No Load Combination kNm Remark
(kN) HT HL MT ML
1 Group I (Case-1) 39749 576 2026 10003 22218 24366

2 Group I (Case-2) 38894 326 2026 5749 23426 24121

3 Group I (Case-3) 38923 576 2026 15712 22403 27364

4 Group II(Case-1) Wind Load 38532 959 1525 14085 16526 21714

5 Group II(Case-2) Wind Load 37876 544 1795 7726 20254 21677

6 Group II(Case-3) Wind Load 37899 959 1795 18463 19469 26831

7 Group III (Case-1A) Seismic Transverse(-V) 32667 9697 3027 81123 23280 84397

8 Group III (Case-1B) Seismic Transverse(+V) 36489 9697 3027 81123 23280 84397

9 Group III (Case-2A) Seismic Transverse (-V) 32564 9645 3027 80283 23441 83635
Group III (Case-2B) Seismic Transverse
10 36364 9645 3027 80283 23441 83635
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 32570 9632 3027 80968 23305 84255

12 Group III (Case-3B) Seismic Transverse(+V) 36365 9632 3027 80968 23305 84255
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 32704 2909 9529 24605 71323 75448
V)
Group IV (Case-1B) Seismic
14 36452 2909 9529 24605 71323 75448
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 32590 2893 9529 24277 71484 75494
V)
Group IV (Case-2B) Seismic
16 36338 2893 9529 24277 71484 75494
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 32594 2890 9529 25091 71348 75631
V)
Group IV (Case-3B) Seismic
18 36342 2890 9529 25091 71348 75631
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 28209 2909 3027 24605 23964 34346

20 Group V (Case-1B) Seismic Vertical(+V) 40947 2909 3027 24605 23964 34346

21 Group V (Case-2A) Seismic Vertical(-V) 28130 2893 3027 24277 24125 34225

22 Group V (Case-2B) Seismic Vertical(+V) 40798 2893 3027 24277 24125 34225

23 Group V (Case-3A) Seismic Vertical(-V) 28142 2890 3027 25091 23988 34713

24 Group V (Case-3B) Seismic Vertical(+V) 40793 2890 3027 25091 23988 34713

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - CASE

P Horizontal Force (kN) Moment (kN-m) Moment Resultant


S.No Load Combination Remark
(kN) HT HL MT ML kNm
1 Group I (Case-1) 44887 677 2097 10246 22461 24687

2 Group I (Case-2) 44032 427 2097 5992 23668 24415

3 Group I (Case-3) 44061 677 2097 15956 22646 27702

4 Group II(Case-1) Wind Load 43670 1060 1596 14329 16768 22057

5 Group II(Case-2) Wind Load 43015 645 1866 7970 20496 21991

6 Group II(Case-3) Wind Load 43037 1060 1866 18706 19712 27175

7 Group III (Case-1A) Seismic Transverse(-V) 37468 9795 3096 81401 23529 84734

8 Group III (Case-1B) Seismic Transverse(+V) 41289 9795 3096 81401 23529 84734

9 Group III (Case-2A) Seismic Transverse (-V) 37364 9743 3096 80561 23690 83972

Group III (Case-2B) Seismic Transverse


10 41165 9743 3096 80561 23690 83972
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 37370 9730 3096 81246 23553 84591

12 Group III (Case-3B) Seismic Transverse(+V) 41166 9730 3096 81246 23553 84591
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 37504 3003 9602 24850 71605 75794
V)

Group IV (Case-1B) Seismic


14 41252 3003 9602 24850 71605 75794
Longitudinal(+V)

Group IV (Case-2A) Seismic Longitudinal(-


15 37390 2987 9602 24523 71766 75840
V)
Group IV (Case-2B) Seismic
16 41138 2987 9602 24523 71766 75840
Longitudinal(+V)

Group IV (Case-3A) Seismic Longitudinal(-


17 37394 2983 9602 25337 71629 75978
V)
Group IV (Case-3B) Seismic
18 41142 2983 9602 25337 71629 75978
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 33009 3003 3096 24850 24212 34696

20 Group V (Case-1B) Seismic Vertical(+V) 45747 3003 3096 24850 24212 34696

21 Group V (Case-2A) Seismic Vertical(-V) 32930 2987 3096 24523 24373 34575

22 Group V (Case-2B) Seismic Vertical(+V) 45599 2987 3096 24523 24373 34575

23 Group V (Case-3A) Seismic Vertical(-V) 32943 2983 3096 25337 24237 35062

24 Group V (Case-3B) Seismic Vertical(+V) 45594 2983 3096 25337 24237 35062

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation 4800197-GGN-


and Upgradation by Four-Laning of NH-31D from KM 113.20 DD-013
Job No. 4800197
to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari
section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

CALCULATION OF HYDRODYNAMIC FORCES ON BRIDGE

Under H.F.L. =>In longitudinal direction

Existing Levels Depth submerged


H.F.L. = 57.695 m Pier cap 0.000
Pier cap bottom level = 63.754 m Pier shaft 0.920
Pier shaft bottom level = 56.775 m Pile cap 2.250
Pile cap bottom level = 54.525 m
Max. Scour Level = 50.685 m
pile cap
radius of
pier shaft radius of enveloping
enveloping circle
circle

11.4

1.80 10.8

Dimension of pier shaft transverse direction 1.80


Dimension of pier shaft long direction 1.80
Radius ofenveloping circle trans 0.900
Radius ofenveloping circle long 0.900

Dimension of Pile cap in transverse direction 11.4


Dimension of Pile cap in long direction 10.8
Radius ofenveloping circle trans 5.7
Radius ofenveloping circle long 5.4
Horizontal Force due to hydromdynamic effect, F=Ce.Ah.We
where Ce : coefficient depends on ratio of height of submerged portion and radius of
enveloping circle
W e : weight of the enveloping cylinder in Kg
Ah : horizontal seismic coefficient

Design of Pier
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation 4800197-GGN-


and Upgradation by Four-Laning of NH-31D from KM 113.20 DD-013
Job No. 4800197
to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari
section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Long Seismic
Element H r H/r Ce We Ah F
(m) (m) (t) (long) (kN)
Pier Shaft 0.92 0.900 1.022 0.575 2.341 0.18 2.377
Pile Cap 2.25 5.700 0.395 0.39 231.999 0.18 159.769

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m)
Pier Shaft 1 1 0.4286 2.377 0.394 from pier shaft base
Pile Cap 1 1 0.4286 159.769 0.964 from pile cap base

Under H.F.L. =>In Transverse direction


radius of
pier shaft radius of enveloping pile cap
enveloping circle
circle

10.8

1.8 11.4

Element H r H/r Ce We Ah F
(m) (m) (t) (trans) (kN)
Pier Shaft 0.92 0.900 1.022 0.575 2.341 0.18 2.377
Pile Cap 2.25 5.400 0.417 0.39 208.461 0.18 143.559

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m)
Pier Shaft 1 1 0.4286 2.377 0.394 from pier shaft base
Pile Cap 1 1 0.4286 143.559 0.964 from pile cap base

Design of Pier
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and 4800197-GGN-DD-013


Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Job No. 4800197
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Date
state of West Bengal

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

CALCULATION OF HYDRODYNAMIC FORCES ON BRIDGE


(REFER: IS1893-3-Cl 11 )
Under H.F.L. =>In longitudinal direction
Existing Levels Depth submerged
H.F.L. = 61.145 m Pier cap 0.000 m
Pier cap bottom level = 63.754 m Pier shaft 4.370 m
Pier shaft bottom level = 56.775 m Pile cap 2.250 m
Pile cap bottom level = 54.525 m
Max. Scour Level = 50.685 m
pile cap
radius of
pier shaft radius of enveloping
enveloping circle
circle

11.4

1.80 10.8

Dimension of pier shaft transverse direction 1.80 m


Dimension of pier shaft long direction 1.80 m
Radius ofenveloping circle trans 0.900 m
Radius ofenveloping circle long 0.900 m

Dimension of Pile cap in transverse direction 11.4 m


Dimension of Pile cap in long direction 10.8 m
Radius ofenveloping circle trans 5.7 m
Radius ofenveloping circle long 5.4 m
Horizontal Force due to hydromdynamic effect, F=Ce.Ah.We
where Ce : coefficient depends on ratio of height of submerged portion and radius of
enveloping circle
We : weight of the enveloping cylinder in Kg
Ah : horizontal seismic coefficient
Long Seismic
Element H r H/r Ce We Ah F M
(m) (m) (t) (long) (kN) (kN-m)
Pier Shaft 4.37 0.900 4.856 0.73 11.120 0.18 14.334 26.848
Pile Cap 2.25 5.700 0.395 0.39 240.779 0.18 165.815 205.181

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and 4800197-GGN-DD-013


Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Job No. 4800197
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Date
state of West Bengal

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m) Level (m)
Pier Shaft 1 1 0.4286 14.334 1.873 from pier shaft base 58.648
Pile Cap 1 1 0.4286 165.815 0.964 from pile cap base 55.489

Under H.F.L. =>In Transverse direction


radius of
pier shaft radius of enveloping pile cap
enveloping circle
circle

10.8

1.8 11.4

Element H r H/r Ce We Ah F M
(m) (m) (t) (trans) (kN) (kN-m)
Pier Shaft 4.37 0.900 4.856 0.73 11.120 0.18 14.334 26.848
Pile Cap 2.25 5.400 0.417 0.39 217.240 0.18 149.605 189.549

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m) Level (m)
Pier Shaft 1 1 0.4286 14.334 1.873 from pier shaft base 58.648
Pile Cap 1 1 0.4286 149.605 0.964 from pile cap base 55.489

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

2.0 Pier - Section Design

Pier Section

Reinforcement Details

Dia of bar provided trans direction 52 nos 25 dia at each face


Dia of bar provided long direction 25 nos 25 dia at each face
Total Area 75556.3 mm^2

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

ULS Section capacity check

UR 0.86 OK

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Shear Capacity due to concrete

Shear capacity of concrete is more than longitudnal shear force

SLS - stress check

Rare - critical combination

Limit
Stress in concrete 5.2 Mpa 16.8 Mpa ok
Stress in Steel 27.5 Mpa 440 Mpa ok

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Crack width - critical combination

As QP moments are less than cracking moments of section, therforcesection remains uncracked

Limit
Crack width 0 mm 0.3 mm OK
section is uncracked

Minimum Reinforcment for Pier

Vertical Reinforcement

Dia of vertical bars should not be less than 12 mm OK

Area of minimum RF provided should be greater of .1 Ned/fyd or .002Ac


6215.088 23040

Provided Ast 75556.25 OK

Transverse Reinforcement
Spacing Dia
Provided in Drawing 150 mm OK 12 mm OK
spacing of transverse RF should not be more than dia should not be less than

300 mm 8 mm
1800 mm 6.25 mm
200 mm

Pier_P5_8.2m_123+518_9pile
Shear Capapcity of pier (concrete)

bw 6400 mm Vz 5129 kN
deff 1734 mm N 22296362 N
Fck 35 Mpa Ac 11097600 mm^2
Asl 25513 mm^2 N/Ac 2.0091 ok
P1 0.0023
K 1.33962 ok 0.2fcd 3.12
Vrdc 6642 kN
Vmin 3155.7 kN Vrdc ok

Shear force is less than shear capacity of concrete hence no shear RF required

26
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Design of Pile Foundation - Base Pressure

No. of piles = 9 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
10.8
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = 0.15 m
-4.5, 4.8 0, 4.8 4.5, 4.8
Pile diameter = 1.5 m
Area of pile = 1.767 m2
Pier Size = 1.8 X 6.40 11.4 MT

3
Unit Weight of R.C.C = 2.5 t/m B B
Self weight of Pile cap = 693 t -4.5, 0 0, 0 4.5, 0
Total Length L1+Lf (Max scour) = 13.4 m
Length of pile = 21.0 m
Reduction factor for pile B.M = 0.90 (IS 2911 part 1, sec iv, fig 5)

Loads on Pile -4.5, -4.8 0, -4.8 4.5, -4.8


Normal-LWL Seismic & WInd - LWL
Maximum Pile Load = 350 t. OK 558 OK A
Minimum Pile Load = 212 t. OK -30 OK Max. horizontal load on pile ULS = 19 T OK
Normal-HFL Seismic - HFL .
Maximum Pile Load = 390 OK 598.25 OK
Minimum Pile Load = 249 OK 16 OK
Calculation of loads on piles for each load combination
ML x 4.5 ML ML = Moment along longitudinal direction
Load due to ML = =
1 x 121.5 27.0 MT = Moment along transverse direction
MT x 4.8 MT (REFER ANNEXURE VI)
Load due to MT = =
1 x 138.2 28.8 Normal Seismic
Type of Load case Sr no Pile capacity from soil investigation report = 500 t 625 t
Normal Load case 1 to 3 Maximum uplift Capacity of Pile = 150 t 187.5 t
Wind Load case 4 to 6 Lateral pile capacity from soil investigation report = 75 t
Seismic Transverse 7 to 12
Seismic Longitudinal 13 to 18
Seismic Vertical 19 to 24 ( self wt of pile excluded)

LWL -Case

Vertical Load due to Load due BM for pile


Load Max. load Min. load Resultant H
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) ML -P1 to MT -P1 =H(L1+Lf)/
no. (T) (T) (T)
(T) (T-m) (T-m) 2 (T-m)

1
2587 192 1311 117 0 287 49 7 343 232 13 79
N
o 2
r 2530 137 1392 117 0 281 52 5 337 225 13 79
m
a 3
l 2532 572 1324 117 0 281 49 20 350 212 13 79
4
2502 984 1594 147 64 278 59 34 371 185 18 108
W
i 5
2445 547 1675 147 36 272 62 19 353 191 17 102
n
d 6
2447 1364 1607 147 64 272 60 47 379 165 18 108
7 2299 5395 2661 276 651 255 99 187 541 -30 79 475
8 2553 5426 2319 276 651 284 86 188 558 9 79 475
9 2288 5366 2335 276 648 254 86 186 527 -19 78 473
10 2541 5366 2335 276 648 282 86 186 555 10 78 473
11
2288 5441 2322 276 647 254 86 189 529 -21 78 473
12 2541 5441 2322 276 647 282 86 189 557 7 78 473
S 13 2301 1655 4766 641 195 256 177 57 489.65 22 74 450
e
14 2551 1655 4766 641 195 283 177 57 517.41 49 74 450
i
s 15 2290 1629 530 641 194 254 20 57 330.60 178 74 450
m 16 2539 1629 4782 641 194 282 177 57 515.85 48 74 450
i
17 2290 1712 4769 641 194 254 177 59 490.52 18 74 450
c
18 2540 1712 4769 641 194 282 177 59 518.28 46 74 450
19 2001 1655 2661 309 195 222 99 57 378.38 66 41 246
20 2851 1655 2661 309 195 317 99 57 472.74 161 41 246
21 1992 1629 2677 309 194 221 99 57 377.08 66 41 245
22 2837 1629 2677 309 194 315 99 57 470.92 159 41 245
23 1993 1712 2664 309 194 221 99 59 379.58 63 41 245
24 2837 1712 2664 309 194 315 99 59 473.29 157 41 245

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL Case

Vertical Load due to Load due BM for pile


Load Max. load Min. load Resultant H
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) ML -P1 to MT -P1 =H(L1+Lf)/
no. (T) (T) (T)
(T) (T-m) (T-m) 2 (T-m)

N 1
o 2932 216 1336 124 10 326 49 7 382.79 269 14 84
r 2
m 2876 162 1416 124 10 320 52 6 377.56 261 14 84
a
3
l 2877 597 1348 124 10 320 50 21 390.35 249 14 84
4 2847 1008 1619 154 74 316 60 35 411.31 221 19 115
W
5
i 2790 571 1699 154 46 310 63 20 392.81 227 18 108
n
6
d 2792 1389 1631 154 74 310 60 48 418.87 202 19 115
7 2644 5423 2344 283 661 294 87 188 568.88 19 80 483
8 2899 5454 2344 283 661 322 87 189 598.25 46 80 483
9 2633 5394 2360 283 658 293 87 187 567.28 18 80 481
10 2886 5394 2360 283 658 321 87 187 595.43 46 80 481
11 2634 5469 2347 283 657 293 87 190 569.43 16 79 481
12 2887 5469 2347 283 657 321 87 190 597.54 44 79 481
S 13 2646 1679 4794 648 205 294 178 58 529.90 58 75 457
e 14 2896 1679 4794 648 205 322 178 58 557.67 86 75 457
i
15 2635 1654 558 648 204 293 21 57 370.86 215 75 456
s
m 16 2885 1654 4811 648 204 321 178 57 556.11 85 75 456
i 17 2635 1737 4797 648 203 293 178 60 530.78 55 75 456
c
18 2885 1737 4797 648 203 321 178 60 558.54 83 75 456
19 2347 1679 2686 316 205 261 99 58 418.52 103 42 253
20 3196 1679 2686 316 205 355 99 58 512.87 197 42 253
21 2338 1654 2702 316 204 260 100 57 417.22 102 42 253
22 3182 1654 2702 316 204 354 100 57 511.06 196 42 253
23 2338 1737 2689 316 203 260 100 60 419.71 100 42 253
24 3182 1737 2689 316 203 354 100 60 513.43 194 42 253

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Design of Pile Foundation - SLS

No. of piles = 9 ###


Eccentricity between
0
Column and C.G of Pile = m

Minimum Thickness of
0.85
Pile cap = 2.25 m 4.8 4.8 4.8
Thickness of pile cap = 2.25 m
Pile offset from edge = 0.15 m
Pile diameter = 1.5 m
2
Area of pile = 1.767 m
Pier Size = 1.8 X 6.40
0 0 0
3
Unit Weight of R.C.C = 2.5 t/m
Self weight of Pile cap = 692.6 t 11.4
Total Length L1+Lf = 13.4 m

Length of pile = 21.0 m -4.8 -4.8 -4.8


Reduction factor for pile B.M= 0.90 (IS 2911 part 1, sec iv, fig 5)

Loads on Pile
Normal HFL
Maximum Pile Load = 408 t. 451
Minimum Pile Load = 218 t. 259 .

Calculation of loads on piles for each load combination Max. horizontal load on pile = 16.69 T

ML x 4.5 ML ML = Moment along longitudinal direction


Load due to ML = =
1 x 121.5 27.0 MT = Moment along transverse direction
MT 4.8 x MT (REFER ANNEXURE VI)
Load due to MT = =
1 138.2 x 28.8 Pile capacity from soil investigation report 500 t
Type of Load case Sr no Maximum uplift Capacity of Pile = 150 t
Normal Load case-rare 1 to 3 Lateral pile capacity from soil investigation reporty 75 t
Wind Load case -rare 4 to 6
Normal Load case-frequent 7 to 9
Wind Load case -frquent 10 to 12
Quasi Permanent 13 ( self wt of pile excluded)

LWL - Case

Vertical Load due Load due BM for pile


Load Max. Resultant
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) to ML -P1 to MT -P1 Min. load (T) =H(L1+Lf)/
no. load (T) H (T)
(T) (T-m) (T-m) 2 (T-m)

1 2898 667 1481 135 38 322 55 23 400 244 16 94


2 2841 383 1562 135 22 316 58 13 387 245 15 92
3 2843 1047 1494 135 38 316 55 36 408 224 16 94
4 2813 936 1267 118 64 313 47 32 392 233 15 90
5 2771 513 1327 118 36 308 49 18 375 241 14 83
6 2772 1221 1276 118 64 308 47 42 398 218 15 90
7 2856 540 1125 103 32 317 42 19 378 257 12 72
8 2813 308 1185 103 18 313 44 11 367 258 12 70
9 2815 825 1134 103 32 313 42 29 383 242 12 72
10 2737 514 432 41 38 304 16 18 338 270 6 38
11
2725 273 448 41 22 303 17 9 329 277 5 31
12 2726 590 435 41 38 303 16 20 339 266 6 38
13 2747 0 0 0 0 305 0 0 305 305 0 0

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - Case
Vertical Load due Load due BM for pile
Load Max. Resultant
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) to ML -P1 to MT -P1 Min. load (T) =H(L1+Lf)/
no. load (T) H (T)
(T) (T-m) (T-m) 2 (T-m)
1 3277 691 1505 142 48 364 56 24 444 284 17 101
2 3220 408 1586 142 32 358 59 14 431 285 16 98
3 3222 1072 1518 142 48 358 56 37 451 265 17 101
4 3192 960 1291 125 74 355 48 33 436 274 16 98
5 3150 537 1351 125 46 350 50 19 419 281 15 89
6 3151 1246 1300 125 74 350 48 43 442 259 16 98
7 3235 564 1149 110 42 359 43 20 422 297 13 79
8 3192 332 1210 110 28 355 45 12 411 298 13 76
9 3194 850 1159 110 42 355 43 29 427 282 13 79
10 3116 538 456 48 48 346 17 19 382 311 8 46
11 3104 298 473 48 32 345 18 10 373 317 6 39
12 3105 614 459 48 48 345 17 21 383 307 8 46
13 3127 0 0 0 0 347 0 0 347 347 0 0

..1 Calculation of depth of fixity and maximum moment in pile for Maximum scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.

dia = Diameter of the pile = 1.500 m


T = (E * I / K1)^0.2
where
E = Youngs Modulus of the concrete in kg/cm 2 = 32000000 kn/m^2
I = Moment of Inertia of the pile cross section in cm=4 0.2485049 m^4
K1 = Modulus of subgrade reaction as per Table 1 = 4100 kn/m^3
Q = Resultant horizontal force on pile - NORMAL = t
CASE (MAX) 16.6879
= Resultant horizontal force on pile - SEISMIC = 12.0 t

T = (32000000 * 0.248504887637474 / 4100) ^ 0.2 )= 4.5 m

L1 = Free length of pile above ground level = 3.8 m


= 3.8 m
L1 / T = 3.8 / 4.5 = 0.8
Lf / T = (fig 2 - for fixed headed piles in sands ) = 2.1

Lf = 2.1 * 4.5 = 9.6 m


= 9.6 m
Y = Q * (L1 + Lf)3 / (12[pile
* E head
* I) deflection of equivalent cantilever for fixed head pile]

= 0.0042 m
4.2 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]

M = m * MF [actual maximum moment]


where
m = reduction factor [for fixed head pile] 0.90

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Job No 4800197 Date
Ghoshpukur-Salsalabari section in the state of West Bengal
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Pile Desgin-SLS

LWL - Case HFL - Case


S.no P ML MT HL HT S.no P ML MT HL HT
1 -2440 943 0 156 0 1 -2844 1009 0 167 0
2 -2445 919 0 152 0 2 -2849 979 0 162 0
3 -2242 943 0 156 0 3 -2646 1009 0 167 0
4 -2332 900 0 149 0 4 -2736 975 0 161 0
5 -2409 828 0 137 0 5 -2813 895 0 148 0
6 -2184 900 0 149 0 6 -2587 975 0 161 0
7 -3053 0 0 0 0 7 -3474 0 0 0 0

Pile design
SLS - Stress check

stress Limit
Compressive stress 3.1 Mpa 16.8 Mpa OK
Stress in steel 10.1 Mpa 440 Mpa OK
Result of critical case - SLS rare

Limit
Crack width 0 mm 0.3 mm OK
section is uncracked

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design of Pile Foundation-ULS
10.8
No. of piles = 9
Eccentricity between Column
0
and C.G of Pile group = m
4.8 4.8 4.8 0.85
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = 0.15 m
Pile diameter = 1.5 m
0 0 0
Area of pile = 1.767 m2 11.4
Pier Size = 1.8 X 6.40

Unit Weight of R.C.C = 2.5 t/m3


Self weight of Pile cap = 692.6 t
Scouring length of Pile Max scour HFL-S LWL-S -4.8 -4.8 -4.8
Total Length L1+Lf = 13.4 m 12.4 m 11.3 m
Length of pile = 21.0 m
Reduction factor for pile B.M = 0.90 (IS 2911 part 1, sec iv, fig 5)
Calculation of loads on piles for each load combination

ML x 4.5 ML ML = Moment along longitudinal direction


Load due to ML = =
1 x 121.5 27.0 MT = Moment along transverse direction
MT x 4.8 MT
Load due to MT = =
1 x 138.2 28.8
Type of Load case Sr no
Normal Load case 1 to 3
Wind Load case 4 to 6
Trans seismic Load case 7 to 12
Long seismic Load case 13 to 18
Vertical seismic load case 19 to 24
Accidental Load case 25 to 30
( self wt of pile excluded)
LWL- Case
Vertical Load due Load due to BM for pile
Load HT Max. Min. load Resultant
load P MT (T-m) ML (T-m) HL (T) P/n (T) to ML -P1 MT -P1 =H(L1+Lf)/2
no. (T) load (T) (T) H (T)
(T) (T-m) (T-m) (T-m)
1 3975 1000 2222 203 58 442 82 35 559 325 23 142
2 3889 575 2343 203 33 432 87 20 539 325 23 138
3 3892 1571 2240 203 58 432 83 55 570 295 23 142
4 3853 1409 1653 153 96 428 61 49 538 318 20 121
5 3788 773 2025 179 54 421 75 27 523 319 21 126

6 3790 1846 1947 179 96 421 72 64 557 285 23 137


7 3267 8112 2328 303 970 363 86 282 731 -5 113 683
8 3649 8112 2328 303 970 405 86 282 773 38 113 683
9 3256 8028 2344 303 964 362 87 279 727 -4 112 679
10 3636 8028 2344 303 964 404 87 279 770 38 112 679

11 3257 8097 2330 303 963 362 86 281 729 -6 112 678
12 3637 8097 2330 303 963 404 86 281 772 37 112 678

13 3270 2461 7132 953 291 363 264 85 713 14 111 670

14 3645 2461 7132 953 291 405 264 85 755 55 111 670
15 3259 2428 7148 953 289 362 265 84 711 13 111 669
16 3634 2428 7148 953 289 404 265 84 753 55 111 669

17 362 264 87 714 11 111 669


3259 2509 7135 953 289
18 404 264 87 755 52 111 669
3634 2509 7135 953 289
19 2821 2461 2396 303 291 313 89 85 488 139 47 282
20 4095 2461 2396 303 291 455 89 85 629 281 47 282
21 2813 2428 2412 303 289 313 89 84 486 139 47 281
22 4080 2428 2412 303 289 453 89 84 627 280 47 281
23 2814 2509 2399 303 289 313 89 87 489 137 47 281
24 4079 2509 2399 303 289 453 89 87 629 277 47 281

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

HFL - Case
1 4489 1025 2246 210 68 499 83 36 618 380 24 148
2 4403 599 2367 210 43 489 88 21 598 381 24 144
3 4406 1596 2265 210 68 490 84 55 629 350 24 148
4 4367 1433 1677 160 106 485 62 50 597 373 21 129
5 4301 797 2050 187 64 478 76 28 582 374 22 133

6 4304 1871 1971 187 106 478 73 65 616 340 24 144


7 3747 8140 2353 310 979 416 87 283 786 47 114 690
8 4129 8140 2353 310 979 459 87 283 829 89 114 690
9 3736 8056 2369 310 974 415 88 280 783 48 114 687
10 4116 8056 2369 310 974 457 88 280 825 90 114 687
11 3737 8125 2355 310 973 415 87 282 785 46 113 686
12 4117 8125 2355 310 973 457 87 282 827 88 113 686
13 3750 2485 7160 960 300 417 265 86 768 65 112 676
14 4125 2485 7160 960 300 458 265 86 810 107 112 676
15 3739 2452 7177 960 299 415 266 85 766 65 112 676
16 4114 2452 7177 960 299 457 266 85 808 106 112 676
17 3739 2534 7163 960 298 415 265 88 769 62 112 676
18 4114 2534 7163 960 298 457 265 88 810 104 112 676
19 3301 2485 2421 310 300 367 90 86 543 191 48 290
20 4575 2485 2421 310 300 508 90 86 684 332 48 290
21 3293 2452 2437 310 299 366 90 85 541 190 48 289
22 4560 2452 2437 310 299 507 90 85 682 331 48 289
23 3294 2534 2424 310 298 366 90 88 544 188 48 289
24 4559 2534 2424 310 298 507 90 88 684 329 48 289

Load case No:7 to 24 seismic load combination is taken as 1.35 times the forces transmitted to it by substructure as per Cl.219.8 of IRC : 6-2017
Calculation of depth of fixity and maximum moment in pile for HFL scour

The depth of fixity and bending moments in the pile have been worked out as per

IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Max scour
dia = Diameter of the pile = 1.500 m

T = (E * I / K1)^0.2
where
E = Youngs Modulus of the concrete in kg/cm2 = 32000000 kn/m^2
I = Moment of Inertia of the pile cross section in =cm 4 0.2485049 m^4
K1 = Modulus of subgrade reaction as per Table 1= 4100 kn/m^3
Q = Resultant horizontal force on pile - =
NORMAL CASE (MAX) 24.5 t
= Resultant horizontal force on pile - =
SEISMIC 114.1 t

T = (32000000 * 0.248504887637474 / 4100) ^ 0.2


= ) 4.5 m
HFL-S scour LWL-S- Scour
L1 = Free length of pile above ground level = 3.8 m 2.794 m 1.748 m
= 3.8 m 2.8 m 1.7 m
L1 / T = 3.8 / 4.5 = 0.8 0.615 0.385
Lf / T = (fig 2 - for fixed headed piles in sands ) = 2.1 2.1 2.1

Lf = 2.1 * 4.5 = 9.6 m 9.6 m 9.6 m


= 9.6 m 9.6 m 9.6 m

Y = Q * (L1 + Lf)3 / (12 * [pile


E * I)head deflection of equivalent cantilever for fixed head pile]
= 0.0062 m
6.2 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]

M = m * MF [actual maximum moment]


where
m = reduction factor [for fixed head pile] 0.90

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Pile Desgin- ULS

LWL - Case HFL - Case


S.no P ML MT HT HL S.no P ML MT HT HL
1 -3246 1415 0 0 234 1 -3800 1481 0 0 245
2 -3254 1379 0 0 228 2 -3808 1438 0 0 238
3 -2949 1415 0 0 234 3 -3503 1481 0 0 245
4 -3180 1211 0 0 200 4 -3734 1288 0 0 213
5 -3190 1260 0 0 208 5 -3744 1327 0 0 219
6 -2849 1367 0 0 226 6 -3402 1442 0 0 238
7 49 6827 0 0 1129 7 -465 6903 0 0 1141
8 -375 6827 0 0 1129 8 -890 6903 0 0 1141
9 38 6793 0 0 1123 9 -477 6870 0 0 1136
10 -385 6793 0 0 1123 10 -899 6870 0 0 1136
11 56 6785 0 0 1122 11 -459 6862 0 0 1135
12 -366 6785 0 0 1122 12 -881 6862 0 0 1135
13 -138 6695 0 0 1107 13 -652 6761 0 0 1118
14 -554 6695 0 0 1107 14 -1069 6761 0 0 1118
15 -131 6692 0 0 1107 15 -645 6758 0 0 1117
16 -547 6692 0 0 1107 16 -1061 6758 0 0 1117
17 -108 6692 0 0 1106 17 -622 6757 0 0 1117
18 -524 6692 0 0 1106 18 -1039 6757 0 0 1117
19 -1392 2821 0 0 467 19 -1908 2898 0 0 479
20 -2808 2821 0 0 467 20 -3323 2898 0 0 479
21 -1389 2814 0 0 465 21 -1905 2891 0 0 478
22 -2797 2814 0 0 465 22 -3312 2891 0 0 478
23 -1367 2812 0 0 465 23 -1883 2889 0 0 478
24 -2773 2812 0 0 465 24 -3289 2889 0 0 478

Design of Pile section Fagus - ULS

Cross - section

Reinforcement details
Main steel Shear RF
no. of bar 27 no. of bar 27 dia 16 mm
dia 32 mm dia 32 mm spacing 150 mm
Total Asr 21715 mm^2 Total Asr 21714.69 mm^2
% of r/f 2.46 %

Pier_P5_8.2m_123+518_9pile
LOUIS BERGER Document no.

4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date

Designed by: Checked by


Design of Pier P5 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Reinforcement details

Section check

UR 0.91 OK

Pier_P5_8.2m_123+518_9pile
Annexure - I
General
Ductile detailing shall be carried out for bridges located in zones III,IV and V of
seismic zone map of IRC:6

For Pier bottom level:


NEd = 29724 kN
Ac = 1.2E+07 mm2
As = 75556 mm2
fck = 35 N/mm2 fy = 550 N/mm2
hk = 0.074 < 0.08

Minimum confining reinforcement required

fyd = 478 N/mm2 fcd = 16 N/mm2

Confining reinforcement ratio wwd = rwfyd/fcd

6250 mm
B core dimension (along trans dimension)
1650 mm
D core dimension (along longitudinal dimension)
Dia. Of stirrup along B f = 12 mm
no. of legs along width (along trans dimension) = 27
Area of the stirupps and ties Asp = 3054 mm2
Dia. Of stirrup along D f = 10 mm
no. of legs along Depth (along long dimension) = 10
Area of the stirupps and ties Asp = 785 mm2
2
Confined area = 10312500 mm

100 mm
Spacing of hoops or ties SL =

Minimum Spacing is 200 Ref Fig 17.2 of Code

Volumetric ratio Pw, B (along trans dimension) = 0.004885805

Volumetric ratio Pw, D (along long dimension) = 0.004759989


ωwd
B = 0.149468399 min 0.12
ωwd
D = 0.145619387 min 0.12

Area of gross concrete section Ac = 11520000 mm2

Confined concrete area within the outside


dia of hoop ACC
10312500 mm2
=
Normalised axial force hk = 0.0737

reinforcement ratio rL = 0.0066


ww req = 0.017
Minimum design confining ωwd
= 0.120
reinforcement
O.K

Extent of confining reinforcement

Since nk < 0.3, Length of confinment = 1.8000 m


Refer:- IRC:112-2011 Cl 17.2.1.4

Confinement RF
DESIGN OF PILE CAP FOR PIER-P5
INPUT AND
LOAD CALCULATIONS
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Layout of Pile cap


LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

ULS CONDITION

SUMMARY OF PILE LOADS


(Refer Design document- 4800197-GGN-DD-040 for Pier, ULS design summary)

LOAD CASE V (T) MT (T-m) ML (T-m)


Group I (Case-1) 3975 1000 2222
Group I (Case-2) 3889 575 2343
Group I (Case-3) 3892 1571 2240
Group II(Case-1) Wind Load 3853 1409 1653
Group II(Case-2) Wind Load 3788 773 2025
Group II(Case-3) Wind Load 3790 1846 1947
Group III (Case-1A) Seismic Transverse(-
V) 3267 8112 2328
Group III (Case-1B) Seismic
Transverse(+V) 3649 8112 2328
Group III (Case-2A) Seismic Transverse (-
V) 3256 8028 2344
Group III (Case-2B) Seismic Transverse
(+V) 3636 8028 2344
Group III (Case-3A) Seismic Transverse(-
V) 3257 8097 2330
Group III (Case-3B) Seismic
Transverse(+V) 3637 8097 2330
LWL
Group IV (Case-1A) Seismic Longitudinal(- CASE
V) 3270 2461 7132
Group IV (Case-1B) Seismic
Longitudinal(+V) 3645 2461 7132
Group IV (Case-2A) Seismic Longitudinal(-
V) 3259 2428 7148
Group IV (Case-2B) Seismic
Longitudinal(+V) 3634 2428 7148
Group IV (Case-3A) Seismic Longitudinal(-
V) 3259 2509 7135
Group IV (Case-3B) Seismic
Longitudinal(+V) 3634 2509 7135
Group V (Case-1A) Seismic Vertical(-V) 2821 2461 2396
Group V (Case-1B) Seismic Vertical(+V) 4095 2461 2396

Group V (Case-2A) Seismic Vertical(-V) 2813 2428 2412

Group V (Case-2B) Seismic Vertical(+V) 4080 2428 2412


Group V (Case-3A) Seismic Vertical(-V) 2814 2509 2399
Group V (Case-3B) Seismic Vertical(+V) 4079 2509 2399
Group I (Case-1) 4489 1025 2246
Group I (Case-2) 4403 599 2367
Group I (Case-3) 4406 1596 2265
Group II(Case-1) Wind Load 4367 1433 1677
Group II(Case-2) Wind Load 4301 797 2050
Group II(Case-3) Wind Load 4304 1871 1971
Group III (Case-1A) Seismic Transverse(-
V) 3747 8140 2353
Group III (Case-1B) Seismic
Transverse(+V) 4129 8140 2353
Group III (Case-2A) Seismic Transverse (-
V) 3736 8056 2369

HFL
CASE
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Group III (Case-2B) Seismic Transverse ULS CONDITION


(+V) 4116 8056 2369
Group III (Case-3A) Seismic Transverse(-
V) 3737 8125 2355
Group III (Case-3B) Seismic
Transverse(+V) 4117 8125 2355 HFL
Group IV (Case-1A) Seismic Longitudinal(- CASE
V) 3750 2485 7160
Group IV (Case-1B) Seismic
Longitudinal(+V) 4125 2485 7160
Group IV (Case-2A) Seismic Longitudinal(-
V) 3739 2452 7177
Group IV (Case-2B) Seismic
Longitudinal(+V) 4114 2452 7177
Group IV (Case-3A) Seismic Longitudinal(-
V) 3739 2534 7163
Group IV (Case-3B) Seismic
Longitudinal(+V) 4114 2534 7163
Group V (Case-1A) Seismic Vertical(-V) 3301 2485 2421
Group V (Case-1B) Seismic Vertical(+V) 4575 2485 2421
Group V (Case-2A) Seismic Vertical(-V) 3293 2452 2437
Group V (Case-2B) Seismic Vertical(+V) 4560 2452 2437
Group V (Case-3A) Seismic Vertical(-V) 3294 2534 2424
Group V (Case-3B) Seismic Vertical(+V) 4559 2534 2424

No. of piles = 9
Size of Pile cap = 10.8 x 11.4

SECTION MODULUS
PILE 1 2 3
ZT 28.8 1.00E+09 -28.8
ZL 27 27 27

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN LONGITUDINAL DIRECTION:

LOAD CASE 1 2 3 TOTAL

Group I (Case-1)
559 524 489 1572

Group I (Case-2)
539 519 499 1557

Group I (Case-3)
570 515 461 1546

Group II(Case-1) Wind Load


538 489 440 1468

Group II(Case-2) Wind Load


523 496 469 1488

Group II(Case-3) Wind Load


557 493 429 1480
Group III (Case-1A) Seismic Transverse(-
V) 731 449 168 1348
Group III (Case-1B) Seismic
Transverse(+V) 773 492 210 1475
Group III (Case-2A) Seismic Transverse (-
V) 727 449 170 1346
Group III (Case-2B) Seismic Transverse
(+V) 770 491 212 1473
Group III (Case-3A) Seismic Transverse(-
V) 729 448 167 1345

LWL CASE
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Group III (Case-3B) Seismic ULS CONDITION


Transverse(+V) 772 490 209 1471
LWL CASE
Group IV (Case-1A) Seismic Longitudinal(-
V) 713 628 542 1883
Group IV (Case-1B) Seismic
Longitudinal(+V) 755 669 584 2008
Group IV (Case-2A) Seismic Longitudinal(-
V) 711 627 543 1881
Group IV (Case-2B) Seismic
Longitudinal(+V) 753 669 584 2006
Group IV (Case-3A) Seismic Longitudinal(-
V) 714 626 539 1879
Group IV (Case-3B) Seismic
Longitudinal(+V) 755 668 581 2004

Group V (Case-1A) Seismic Vertical(-V)


488 402 317 1207

Group V (Case-1B) Seismic Vertical(+V)


629 544 458 1631

Group V (Case-2A) Seismic Vertical(-V)


486 402 318 1206

Group V (Case-2B) Seismic Vertical(+V)


627 543 458 1628

Group V (Case-3A) Seismic Vertical(-V)


489 402 314 1205

Group V (Case-3B) Seismic Vertical(+V) 629 542 455 1626

Group I (Case-1) 618 582 546 1746

Group I (Case-2) 598 577 556 1731

Group I (Case-3) 629 573 518 1720

Group II(Case-1) Wind Load 597 547 498 1642

Group II(Case-2) Wind Load 582 554 526 1662

Group II(Case-3) Wind Load 616 551 486 1654


Group III (Case-1A) Seismic Transverse(-
V) 786 503 221 1510
Group III (Case-1B) Seismic
Transverse(+V) 829 546 263 1638
Group III (Case-2A) Seismic Transverse (-
V) 783 503 223 1509
Group III (Case-2B) Seismic Transverse
(+V) 825 545 265 1635
Group III (Case-3A) Seismic Transverse(-
V) 785 502 220 1507
Group III (Case-3B) Seismic
Transverse(+V) 827 545 263 1634
HFL CASE
Group IV (Case-1A) Seismic Longitudinal(-
V) 768 682 596 2046
Group IV (Case-1B) Seismic
Longitudinal(+V) 810 724 637 2171
Group IV (Case-2A) Seismic Longitudinal(-
V) 766 681 596 2044
Group IV (Case-2B) Seismic
Longitudinal(+V) 808 723 638 2169
Group IV (Case-3A) Seismic Longitudinal(-
V) 769 681 593 2042
Group IV (Case-3B) Seismic
Longitudinal(+V) 810 722 634 2167

Group V (Case-1A) Seismic Vertical(-V) 543 456 370 1369

Group V (Case-1B) Seismic Vertical(+V) 684 598 512 1794


LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

ULS CONDITION
Group V (Case-2A) Seismic Vertical(-V) 541 456 371 1368

Group V (Case-2B) Seismic Vertical(+V) 682 597 512 1791

Group V (Case-3A) Seismic Vertical(-V) 544 456 368 1367

Group V (Case-3B) Seismic Vertical(+V) 684 596 508 1789

Longitudinal direction:-

MAXIMUM SHEAR = 2171 t


LEVER ARM = 3.60 m
MOMENT = 7814 tm
Density of concrete = 2.50 t/m3
Density of soil = 1.8 t/m3
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap = 288.56 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 649.27 tm
Net moment = 7165.18 tm

Shear check at face of pile

Maximum shear at face of pile = 2171 t


Downward Weight due to pile cap = 288.56 t
Net shear = 1882 t
av = 3.60 m
deff = 2.16 m
0.5deff = 1.081 m
2deff = 4.325 m
β = av/2d
= 0.83
Reduced shear = 1566.62 t

Transverse direction:-

SECTION MODULUS

PILE 1 4 7

ZT 28.8 28.8 28.8

ZL 27 1.00E+09 -27

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN TRANSVERSE DIRECTION:

LOAD CASE 1 4 7 TOTAL

Group I (Case-1)
559 476 394 1429

Group I (Case-2)
539 452 365 1356

Group I (Case-3)
570 487 404 1461
LWL
Group II(Case-1) Wind Load
538 477 416 1431 CASE

Group II(Case-2) Wind Load


523 448 373 1343

Group II(Case-3) Wind Load


557 485 413 1456
Group III (Case-1A) Seismic Transverse(-
V) 731 645 558 1934
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Group III (Case-1B) Seismic ULS CONDITION


Transverse(+V) 773 687 601 2061
Group III (Case-2A) Seismic Transverse (-
V) 727 641 554 1922
Group III (Case-2B) Seismic Transverse
(+V) 770 683 596 2048
Group III (Case-3A) Seismic Transverse(-
V) 729 643 557 1929
Group III (Case-3B) Seismic
Transverse(+V) 772 685 599 2056
Group IV (Case-1A) Seismic Longitudinal(-
V) 713 449 185 1346
Group IV (Case-1B) Seismic
Longitudinal(+V) 755 490 226 1471
Group IV (Case-2A) Seismic Longitudinal(-
V) 711 446 182 1339
Group IV (Case-2B) Seismic LWL
Longitudinal(+V) 753 488 223 1464 CASE
Group IV (Case-3A) Seismic Longitudinal(-
V) 714 449 185 1348
Group IV (Case-3B) Seismic
Longitudinal(+V) 755 491 227 1473

Group V (Case-1A) Seismic Vertical(-V)


488 399 310 1197

Group V (Case-1B) Seismic Vertical(+V)


629 540 452 1621

Group V (Case-2A) Seismic Vertical(-V)


486 397 307 1191

Group V (Case-2B) Seismic Vertical(+V)


627 538 448 1613

Group V (Case-3A) Seismic Vertical(-V)


489 400 311 1199

Group V (Case-3B) Seismic Vertical(+V)


629 540 452 1621

Group I (Case-1)
618 534 451 1603

Group I (Case-2)
598 510 422 1530

Group I (Case-3)
629 545 461 1635

Group II(Case-1) Wind Load


597 535 473 1605

Group II(Case-2) Wind Load


582 506 430 1517

Group II(Case-3) Wind Load


616 543 470 1629
Group III (Case-1A) Seismic Transverse(-
V) 786 699 612 2097
Group III (Case-1B) Seismic
Transverse(+V) 829 741 654 2224 HFL
Group III (Case-2A) Seismic Transverse (- CASE
V) 783 695 607 2085
Group III (Case-2B) Seismic Transverse
(+V) 825 737 649 2211
Group III (Case-3A) Seismic Transverse(-
V) 785 697 610 2092
Group III (Case-3B) Seismic
Transverse(+V) 827 740 652 2219
Group IV (Case-1A) Seismic Longitudinal(-
V) 768 503 238 1509
Group IV (Case-1B) Seismic
Longitudinal(+V) 810 545 279 1634
Group IV (Case-2A) Seismic Longitudinal(-
V) 766 501 235 1502
Group IV (Case-2B) Seismic
Longitudinal(+V) 808 542 276 1627
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Group IV (Case-3A) Seismic Longitudinal(- ULS CONDITION


V) 769 503 238 1510
Group IV (Case-3B) Seismic
Longitudinal(+V) 810 545 280 1635

Group V (Case-1A) Seismic Vertical(-V)


543 453 363 1359

Group V (Case-1B) Seismic Vertical(+V)


684 595 505 1784 HFL
CASE
Group V (Case-2A) Seismic Vertical(-V)
541 451 361 1353

Group V (Case-2B) Seismic Vertical(+V)


682 592 502 1775

Group V (Case-3A) Seismic Vertical(-V)


544 454 364 1362

Group V (Case-3B) Seismic Vertical(+V)


684 595 505 1784

MAXIMUM SHEAR = 2224 t


LEVER ARM = 1.60 m
MOMENT = 3559 tm
Density of concrete = 2.50 t/m3
Density of soil = 1.8 t/m3
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap = 151.88 t
Lever arm = 1.25 m
Moment due to S.W. & Cushion = 189.84 tm
Net moment = 3368.92 tm

Shear check at face of pile

Maximum shear at face of pile = 2224.23 t


Downward Weight due to pile cap = 151.88 t
Net shear = 2072.35 t
av = 1.60 m
deff = 2.16 m
0.5deff = 1.081 m
2deff = 4.325 m
β = av/2d
= 0.37
Reduced shear = 766.65 t
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

SLS CONDITION

SUMMARY OF PILE LOADS


(Refer Design document- 4800197-GGN-DD-xxx for Pier, SLS design summary)

LOAD CASE V (T) MT (T-m) ML (T-m)

Group I (Case-1 service-Rare)


2898 667 1481
Group I (Case-2 service-Rare)
2841 383 1562
Group I (Case-3 service-Rare)
2843 1047 1494
Group II (Case-1 wind load-Rare)
2813 936 1267
Group II (Case-2 wind load-Rare)
2771 513 1327
Group II (Case-3 wind load-Rare)
2772 1221 1276
LWL CASE
Group III (Case-1 Service-Frequent)
2856 540 1125
Group III (Case-2 Service-Frequent)
2813 308 1185
Group III (Case-3 Service-Frequent)
2815 825 1134
Group IV (Case 1 Wind Load-Frequent)
2737 514 432
Group IV (Case 2 Wind Load-Frequent)
2725 273 448
Group IV (Case 3 Wind Load-Frequent) 2726 590 435

Group I (Case-1 service-Rare)


3277 691 1505
Group I (Case-2 service-Rare)
3220 408 1586
Group I (Case-3 service-Rare)
3222 1072 1518
Group II (Case-1 wind load-Rare)
3192 960 1291
Group II (Case-2 wind load-Rare)
3150 537 1351
Group II (Case-3 wind load-Rare)
3151 1246 1300
HFL CASE
Group III (Case-1 Service-Frequent)
3235 564 1149
Group III (Case-2 Service-Frequent)
3192 332 1210
Group III (Case-3 Service-Frequent)
3194 850 1159
Group IV (Case 1 Wind Load-Frequent)
3116 538 456
Group IV (Case 2 Wind Load-Frequent)
3104 298 473
Group IV (Case 3 Wind Load-Frequent) 3105 614 459
Group V (Case-1- Quasi permanent) 2747 0 0 LWL CASE
Group V (Case-1- Quasi permanent) 3127 0 0 HFL CASE

No. of piles = 9

SECTION MODULUS
PILE 1 2 3 0
ZT 28.8 1E+09 -28.8 0
ZL 27 27 27 0

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN LONGITUDINAL DIRECTION:

LOAD CASE 1 2 3 TOTAL


Group I (Case-1 service-Rare) 400 377 354 1131
Group I (Case-2 service-Rare) 387 374 360 1121
Group I (Case-3 service-Rare) 408 371 335 1114
Group II (Case-1 wind load-Rare) 392 360 327 1079

LWL CASE
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Group II (Case-2 wind load-Rare) 375 SLS


357CONDITION
339 1071
Group II (Case-3 wind load-Rare) 398 355 313 1066
LWL CASE
Group III (Case-1 Service-Frequent) 378 359 340 1077
Group III (Case-2 Service-Frequent) 367 356 346 1069
Group III (Case-3 Service-Frequent) 383 355 326 1064
Group IV (Case 1 Wind Load-Frequent) 338 320 302 960
Group IV (Case 2 Wind Load-Frequent) 329 319 310 958
Group IV (Case 3 Wind Load-Frequent) 339 319 298 957
Group I (Case-1 service-Rare) 444 420 396 1260
Group I (Case-2 service-Rare) 431 417 402 1250
Group I (Case-3 service-Rare) 451 414 377 1243
Group II (Case-1 wind load-Rare) 436 403 369 1208
Group II (Case-2 wind load-Rare) 419 400 381 1200
Group II (Case-3 wind load-Rare) 442 398 355 1195 HFL CASE
Group III (Case-1 Service-Frequent) 422 402 382 1206
Group III (Case-2 Service-Frequent) 411 400 388 1199
Group III (Case-3 Service-Frequent) 427 398 368 1193
Group IV (Case 1 Wind Load-Frequent) 382 363 344 1089
Group IV (Case 2 Wind Load-Frequent) 373 362 352 1087
Group IV (Case 3 Wind Load-Frequent) 383 362 341 1086

Longitudinal direction:-
MAXIMUM SHEAR = 1259.61 t
LEVER ARM = 3.60 m
MOMENT = 4534.60 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.8 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 288.56 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 649.27 tm
Net moment = 3885.33 tm

Transverse direction:-

SECTION MODULUS
PILE 1 4 7
ZT 28.8 28.8 28.8
ZL 27 1.00E+09 -27

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN TRANSVERSE DIRECTION:


LOAD CASE 1 4 7 TOTAL
Group I (Case-1 service-Rare) 400 345 290 1035
Group I (Case-2 service-Rare) 387 329 271 987
Group I (Case-3 service-Rare) 408 352 297 1057
Group II (Case-1 wind load-Rare) 392 345 298 1035
Group II (Case-2 wind load-Rare) 375 326 277 977
Group II (Case-3 wind load-Rare) 398 350 303 1051 LWL
Group III (Case-1 Service-Frequent) 378 336 294 1008 CASE
Group III (Case-2 Service-Frequent) 367 323 279 970
Group III (Case-3 Service-Frequent) 383 341 299 1024
Group IV (Case 1 Wind Load-Frequent) 338 322 306 966
Group IV (Case 2 Wind Load-Frequent) 329 312 296 937
Group IV (Case 3 Wind Load-Frequent) 339 323 307 970
Group I (Case-1 service-Rare) 444 388 332 1164
Group I (Case-2 service-Rare) 431 372 313 1116
Group I (Case-3 service-Rare) 451 395 339 1186
Group II (Case-1 wind load-Rare) 436 388 340 1164
Group II (Case-2 wind load-Rare) 419 369 319 1106
Group II (Case-3 wind load-Rare) 442 393 345 1180 HFL
Group III (Case-1 Service-Frequent) 422 379 336 1137 CASE
Group III (Case-2 Service-Frequent) 411 366 321 1099
Group III (Case-3 Service-Frequent) 427 384 341 1153
Group IV (Case 1 Wind Load-Frequent) 382 365 348 1095
Group IV (Case 2 Wind Load-Frequent) 373 355 338 1066
Group IV (Case 3 Wind Load-Frequent) 383 366 349 1099
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

SLS CONDITION
MAXIMUM SHEAR = 1185.63 t
LEVER ARM = 1.60 m
MOMENT = 1897.02 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.80 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 151.88 t
Lever arm = 1.25 m
Moment due to S.W. & Cushion = 189.84 tm
Net moment = 1707.17 tm

CRACK WIDTH
V = 3127 t
Max Load on a Pile= 347 t
Long. Dir
Downward Weight due to pile cap = 288.56 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 649 tm
Net B.M in Long. Dir = 3103 t-m

Trans. Dir
Downward Weight due to pile cap = 151.88 t
Lever arm = 1.25 m
Moment due to S.W. & Cushion = 190 tm
Net B.M in Long. Dir = 1478 t-m
ULS CHECK
LOUIS BERGER Document no.

Job No 4800197 4800197-GGN-DD-013


Detailed Engineering in Connection with Rehabilitation and Up-Gradation to
Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of
Ghoshpukur-Salsalabari section in the State of West Bengal on EPC mode
Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

Long. Dir Trans. Dir


beff for cantiliver slab = 1.2a+b1
a = 3.6 1.6 m
b1 = 1.5 1.5 m
beff = 5.82 3.42 m
Hence it overlaps =
beff modified = 3.81 2.61 m
Max. Shear = 828.55 828.55 t
Load/m = 217.47 317.45 t/m
ULS Moment = 782.88 507.92 tm/m

Material Specification:

Concrete grade M35


Characteristic Compressive Strength of Concrete, fck Mpa 35
Concrete material factor (Уm) 1.50
Design Compressive strength of Concrete, fcd Mpa 15.63
Tensile strength of concrete , fctm Mpa 2.80
Strain at reaching Characteistic Strength, ec2 0.0020
Ultimate Strain, ecu2 0.0035
Modulus of Elasticity of Concrete ( Ecm ) Gpa 32

Steel Grade Fe550


Yield Strength of Reinforcement, fy or fyk Mpa 550.00
Partial factor for steel (Уs) 1.15
Design Yield Strength of Reinforcement, fyd Mpa 478.261
Modulus of Elasticity of Steel ( Es) Gpa 200
Dry weight of Concrete KN/m³ 25
Permissible Crack Width mm 0.300
Maximum compressive stress in concrete under rare combination
fck 0.48
N/mm² 16.80
Maximum tensile stress in steel under rare combination fyk 0.6
N/mm² 330.00

STRENGTH CHECK

Pile cap
Pile cap
Sl No. Parameters Units Trans.
Long. Dir
Dir
1 MOMENT KN-M 7680 4983
2 SHEAR FORCE KN 2133 3114

MATERIAL DATA
3 Grade of Steel 550 550
4 Characteristic strength of reinf. (fyk) Mpa 550 550
5 Partial factor for steel (Уs) 1.15 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200 200
8 Grade of Concrete 35 35
9 Charecterstic comp. strength (fck) Mpa 35 35
10 α 0.67 0.67
11 Concrete material factor (Уm) 1.50 1.50
Design value for Concrete comp. strength (fcd =
12 Mpa 15.63 15.63
αfck/Уm)

Geometric Data
13 Width of slab(b) mm 1000 1000
14 depth of Member mm 2250 2250
15 Clear Cover mm 75 75
16 Dia of reinforcement mm 25 20
17 Spacing of bars mm 80 80
18 Dia of reinforcement mm 25 20
19 Spacing of bars mm 80 80
20 Area of reinforcement mm² 12266 7850
21 Reinforcement (Ast/bd) 0.0057 0.0037
22 Hence Pt= (100*Ast/bd) % 0.57 0.37
23 Dia of Shear Reinforcement links mm 10 10
24 Spacing of reinforcement in other direction mm 160 160
25 number of legs Nos. 6 6
26 Reinforcement(% )

Design of Pier Cap


As per Clause 16.5.1.1 of IRC:112-2014, Min. & Max Main
Reinforcement.
27 Min. Main Reinforcement mm² 2862 2769
28 Status O.K. O.K.
29 Max. Main Reinforcement mm² 56250 56250
30 Status O.K. O.K.

Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 2163 2130
32 Depth of NA from comp. flange (x) mm 469 300
33 λ 0.80 0.80
34 η 1.00 1.00
35 Depth of stress Block (λx) mm 375 240
36 Stress on stress Block (η fcd) MPa 15.63 15.63
37 Total comp. force (Fc = λxηfcdb) KN 5866 3754
38 Total tension Force (Fs = fyd At) KN 5866 3754
39 Diff (Fc-Fs) KN 0 0
40 Depth of Lever arm (z) = d-λx/2 mm 1975 2010
41 Moment of resistance (Fc*z) KN-m 11585 7546
42 UR for pure bending 0.66 0.66
43 Status O.K. O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 1081 1065
58 2d = mm 4325 4260
59 αv = m 3.600 1.600
60 β= 0.832 0.370
61 Design Shear force,Ved = kN 1776 1152
62 K = 1+sqrt(200/d)<=2 1.304 1.306
63 σcp MPa 0.000 0.000
64 ρ1=At/(bd)<=0.02 0.006 0.004
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.273 0.274
66 Concrete Shear Capacity Vrd.c =
KN 843 721
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 591 583
69 [Vmin+(0.15σcp)]bwd

70 Status (if 0 = reinf. Not reqd;or 1 = reinf reqd) 1. 1.


71 Design shear force (Ved) KN 1776 1152
72 Design yield strength. of shear reinf. (fywd=fyd) MPa 478.26 478.26
73 Cotθ 1.00 1.00
74 Required area of Shear reinforcement (Aws) mm²/mm 305 201
75 Nos 6 6
76 Provided area of Shear reinforcement (Aws) mm²/mm 471 471
77 shear capacity w/ vertical shear renf.(Vrd,s) KN 2741 2700
78 αcw 1.00 1.00
79 V1 0.53 0.60
80 Max. shear Capcity w/ vertical shear renf. (VRd,max) KN 8097 8991
81 Final shear Capcity (VRd) KN 2741 2700
82 UR for only shear= 0.65 0.43
83 Status O.K. O.K.

As per Clause 10.3.3.5 of IRC:112-2011, Minimum Shear Reinforcement.

84 Min. Shear Reinforcement Asw min/s mm²/mm 0.6583 0.6583


85 Dia of reinforcement mm 10 10
86 Spacing of reinforcement mm 160 160
87 Area of reinforcement Asw/s provided mm² 2.95 2.95
88 Status O.K. O.K.

44 Effective As long for only Bending mm² 8131 5183


45 DFtd KN 887.87 576.04
46 As long for additional tensile RF from Shear force mm² 1856 1204
47 UR for combined shear + bending 0.81 0.81
48 Status O.K. O.K.
49 Max. strain on concrete in comp. 0.0035 1.0035
50 Max. strain on reinf. in tension 0.0044 0.0044
51 Max. depth of NA From Comp. Flange mm 959 2121
52 Status (under/Reinf, Over Reinf or Bal) U/R U/R
53 fctm MPa 2.80 0.00
54 Min. reinforcement mm² 2862 2769
55 Status O.K. O.K.

*Surface Reinforcement (Cl. 16.5.4 (4)-IRC:112-2011)


Minimum Surface Reinforcement (1% of Act,ext) mm2 750 750
Dia of Reinforcement (φ) mm 16 16
Spacing of Reinforcement (s) mm 160 160
Reinforcement Provided mm /m
2
1257 1257

Design of Pier Cap


Design of Pier Cap
PUNCHING SHEAR CHECK
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning 4800197-GGN-DD-
Job No 4800197
013
of NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee 29-11-2019
Design of Pier P5 for Ch: 123+518.5

DESIGN FOR PUNCHING SHEAR IN PILE CAP AS PER IRC : 112 - 2011

3
Density of concrete 25 KN/m
3
Density of soil 18 KN/m
Characteristic Strength, fck 35 Mpa
Design Strength of concrete, fcd 15.63 Mpa
Net Applied Force, Ved 8128 KN
Net downward force within the control perimeter, DVEd 1605.8 KN
Overall depth of pile cap 2250 mm
Effective Depth of Pile Cap, d 2130.0 mm
Reinforcement Ratio, rl 0.0046
Distance between the edge of pile to the edge of pier 2.850 < 2d
VEd,red = VEd - DVEd 6522.26 KN
n = 0.6 x [1-fck/310] 0.532
Maximum Punching Shear Resistance, nRd.max = 0.5 x n x fcd 4.16 Mpa
0.5
K = 1 + (200/d) 1.31 ≤2
1.5 0.5
nmin = 0.031 x K x (fck) 0.274 Mpa
Distance of control perimeter from column periphery, a 2.850 mm
2xd/a 1494.74
Perimeter along control line, p 7682 mm
2
Area enclosed by control line 18.23 m
nEd,red = VEd,red /(bd) 0.399 MPa
nmin x 2d/a 409.343 MPa
0.333
nRd = 0.12 x K x (80.r1.fck) x (2d/a) 547.711 MPa
HENCE, OK
SLS CHECK
LOUIS BERGER Document no.
4800197-GGN-DD-
Detailed Engineering in Connection with Rehabilitation and Up-Gradation Job No 4800197 013
to Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-
A) of Ghoshpukur-Salsalabari section in the State of West Bengal on EPC
mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

DESIGN OF foundation (SLS)

S.no. Refrence Unit Long Dir Long Dir

Load Data
1 Moment KN-m 38115 16747
Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Fe 550 Fe 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
Design value for concrete compressive strength (fcd=
11 αfck/γm) Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32

Geometric Data
13 Width of Slab/Beam (b) mm 11400 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 20
18 Effective depth of beam/Slab (d) mm 2163 2130
19 Spacing of Reinforcement (s) or mm 80 80
20 Number of Bar (n) Nos 143 135
21 Area of Reinforcement (At) mm2 69950 42412
22 Reinforcement (%) 0.273 0.175

Stress Check
23 Concrete Cross Sectional Area (AC) mm2 25650000 24300000
24 Perimeter in contact with atmosphere (u) mm 27300 26100
25 Notional Size (=2AC/u) mm 1879 1862
26 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.50 1.50
27 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112MPa 12800 12800
28 Modular ratio (m) 15.63 15.63
29 Allowable stress in Steel Cl 12.2.2,IRC 112MPa 330 330
30 Allowable stress in Concrete Cl 12.2.2,IRC 112MPa 16.80 16.80
31 Position of nuetral axis from comp. face (x) mm 555.2 453.6
32 MOA of Compression area mm2 1.76E+09 1.11E+09
33 MOA of Tension area mm2 1.76E+09 1.11E+09
34 Diff. mm2 0 0
35 MOI of cracked section mm4 3.47E+12 2.20E+12
36 Stress in tension reinf. MPa 275.554 199.553
UR 0.84 0.60
37 Status O.K. O.K.
38 Stress in concrete MPa 6.091 3.455
UR 0.36 0.21
39 Status O.K. O.K.
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

CRACK WIDTH CHECK

S.no. Refrence Unit Long Dir Trans Dir

Load Data
1 Moment KN-m 30437 1478

Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Table 18.1,IRC 112MPa 550 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
11 Design value for concrete compressive strength (fcd= αfck/γm)
Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32

Geometric Data
13 Width of Slab/Beam (b) mm 11400 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 20
17 Effective depth of beam/Slab (d) mm 2163 2130
18 Spacing of Reinforcement (s) or mm 80 80
19 Number of Bar (n) Nos 143 135
20 Area of Reinforcement (At) mm2 69950 42412
21 Reinforcement (%) 0.273 0.175

Stress Check
22 Concrete Cross Sectional Area (AC) mm2 25650000 24300000
23 Perimeter in contact with atmosphere (u) mm 27300 26100
24 Notional Size (=2AC/u) mm 1879 1862
25 Age at Loading days 28 28
26 Relative humidity Table 6.9 , IRC %
112 12800 12800
27 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 15.6 15.6
28 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112
MPa 1924.8 1924.8
29 Modular ratio (m) 103.906 103.906
30 Allowable stress in Steel Cl 12.2.2,IRC 112
MPa 440.0 440.0
31 Allowable stress in Concrete Cl 12.2.2,IRC 112
MPa 12.60 12.60
32 Position of nuetral axis from comp. face (x) mm 1141.2 972.1
33 MOA of Compression area mm2 7.42E+09 5.10E+09
34 MOA of Tension area mm2 7.42E+09 5.10E+09
35 Diff. mm2 0.000 0.000
36 MOI of cracked section mm4 1.32E+13 9.22E+12
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P5 for Ch: 123+518.5 29-11-2019

37 Stress in tension reinf. ssc MPa 244.161 19.292


38 Status O.K. O.K.
39 Stress in concrete MPa 2.626 0.156
40 Status O.K. O.K.

CALCULATION FOR CRACK WIDTH FOR BENDING As per 12.3.4 of IRC 112-2011
41 Wk = Sr,max (esm-ecm)
42 ae = Es/Ecm 6.25 6.25
43 depth hc,eff mm 218.8 300.0
44 Eff area of conc in tension surrounding reinf Ac,eff mm2 2493750 3240000
45 Rr,eff 0.0280 0.0131
46 fctm Mpa 2.800 2.800
47 fct,eff Mpa 2.800 2.800
48 kt 1.500 1.500
49 (esm-ecm)= {ssc - kt(fct,eff/Rr,eff)(1+aeRr,eff)}/Es 0.0003 -0.0016
50 0.6*ssc/Ec 0.0007 0.0001
51 (esm-ecm) 0.0007 0.0001
52 K1 0.80 0.80
53 K2 0.50 0.50
54 Minimum clear cover c 75.00 75.00
55 Srmax = 3.4c+0.425k1k2f/Rreff 407 515
56 Wk = Sr,max (esm-ecm) 0.298 0.030
57 Allowable crack width 0.300 1.300
58 UR 0.99 0.02
59 Status O.K. O.K.
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal

Pier-P7 for Major Bridge at chainage - 123+518.5


(This design is applicable for Pier P1, P2, P6, P8, P9 and P10 also)

Pier_P7_9.6m_12piles
Content

1 Input, Load Calculations, Design forces

2 Pier Section Design

3 Pile Base Pressure Check

4 Pile SLS check

5 Pile ULS Check

6 Pile Structural Desgin

Annex _I Confinement RF

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

1 Inputs:

16.00 Traffic
Direction
FRL 0.00%
+67.378
45.69m span 45.69 m span
2.40 4.1m

Top of pier 0.75


+64.528
cap

6.4m

8.378

GL 55.98
55.40

2.83
2.25
53.15

Finished Road Level (FRL) at the centre of Pier = 67.378 m

Pile cap bottom level / Founding level = 53.15 m

Max depth of scour For Pier from FSL (Ref: ANNEXURE-I)


= 13.38 m

Super Structure

Overall Length Span 1 = 45.69 m

Overall Length Span 2 = 45.69 m


Width of Deck Slab - Span 1 = 16.00 m
Width of Deck Slab - Span 2 = 16.00 m
Super structure Depth = 2.40 m

Crash barrier Height = 1.00 m

Wearing Coat thickness = 0.1 m

Effective Length of span 1 = 43.29 m

Effective Length of span 2 = 43.29 m


Sub Structure
Depth of Bearing + Pedestal = 0.35 m
Pier Cap Top Level = +64.528 m =+67.378-0.1-2.40-0.35 - cross slope
Pier cap - Length along the Traffic = 4.1 m
Pier cap - Length across the Traffic = 12.9 m
Pier cap - Overall Depth = 0.75 m
Centre to centre of bearing (Transverse) = 4.10 m
Centre to centre of bearing (Longitudinal) = 2.40 m
Height of sloping portion of piercap = 0.75 m
Existing GL = 55.98 m

Height of Pier from top of Pile Cap = 9.13 m =+64.528-55.400

Height of Pier below GL = 0.58 m

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design height of pier = 9.20 m
Dimension of Pier along traffic = 1.80 m
Dimension of Pier across traffic = 6.40 m LWL (RL) = +55.98
Scour level HFL = +47.77 m Scour level HFL-S = 49.10
HFL (RL) = +61.15 m Scour level LWL-S = 50.44
Max depth of scour = 13.38 m from HFL
Foundation
Pile - Diameter = 1.5 m Type of Foundation = PILE
No of Pile = 12.0 Nos
Pile cap/Footing -Along Traffic Direction = 10.8 m
Pile cap /Footing -Across Traffic Direction = 15.3 m
Pile cap - Depth = 2.3 m Footing depth at tip = 2.25 m
Min Thickness of soil above pile cap = 0.6 m offset from pier = 0 mm
Materials Modulur ratio = 10
Unit weight of PSC = 25 kN/m3
Unit weight of RCC = 25 kN/m3
Unit weight of Wearing course = 22 kN/m3
Unit weight of Soil fill = 20 kN/m3
Grade of Concrete for Pier = 35 N/mm²
Grade of Concrete for Piles (or Open Foundation) = 35 N/mm²
Grade of Steel used = 550 N/mm²

Load Calculation
1.1 Dead Load
1.1.1 SuperStructure
Load from Span 1
Total Weight = (360.2)×25.0 DL Extra Factor 1.05
Reaction on Bearing(Outer bearing) = 6338 kN

Load from Span 2


Total Weight = =(360.2)×25.0
Reaction on Bearing(Inner bearing) = 6338 kN

Total reaction on pier from two spans 12676 kN


=
ML due to different spans 0 kN-m
=
Transverse moment = 0 kN-m

Total SIDL
Reaction (Outer Bearing) = 1268 kN
Reaction (Inner Bearing) = 1268 kN
Total reaction = 2536 kN

Fixed SIDL ( crash barrier+services)


Reaction ( outer bearing ) = 514.0 kN
Reaction (Inner bearing) = 514.0 kN
Total reaction = 1028 kN
Long. Moment due to diff. Spans = 0.0 kN-m
Transverse Moment = 0.0 kN-m

Variable SIDL(Wearing coat+future overlay)


Reaction (Outer bearing) = 753.9 kN
Reaction (Inner Bearing ) = 753.9 kN
Total reaction due to SIDL(Wearing coat) = 1508 kN
Long. Moment due to diff. Spans = 0.0 kN-m
Transverse Moment = 0.0 kN-m

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.2 Live Load

1.2.1 Governing Load cases for Live Load

Case 1 (Maximum Axial Force case) Without any reduction factor


Axial force = 2520 kN
Longitudinal Moment = 1162 kNm
Transverse Moment = 2395 kNm

Case 2 (Maximum Longitudinal Moment case)-


Axial force = 1808 kN
Longitudinal Moment = 2169 kNm
Transverse Moment = 1718 kNm

Case 3 (Maximum Transverse Moment case)


Axial force = 1628 kN
Longitudinal Moment = 1170 kNm
Transverse Moment = 6358 kNm
1.3 Longitudinal Forces (Braking Force & Friction Force)
1.3.1 70R
Braking Force

No.of vehicles on span = 1 nos.


Total Live load of 1L 70R = 1000 kN 1L Class A 554 kN
For Contribution of B.F = 20% of First Train + 10% of Second train
Contribution of B.F (Fh) (In Normal case) = 318 kN Contribution of B.F (Fh) (In Trans Seis case)
Contribution of B.F (Fh) (Max Possible in Long Seis case) = 0 kN 64 kN
Friction Force

Left side Right side

S.No Description \ Type of Pier P1 P2 P3 P4


Fx Free
1 DL Rxn on free end (input value) 6338 6338 0 Put Max R only for EJ or FR pier.
2 SIDL on free end (input value) 1268 1268 0
Coefficient of Friction 0.05 0.05 0.05 0.05
Frictional force due to DL + SIDL 380 380 0 0

3 LL Reaction Without any reduction factor 2520 2520 0 0


Frictional force due to LL 126 126 0 0
Live Load Lane reduction factor to be
taken = 1.0 LL factor on Seismic = 0.2
Normal Case Trans Seismic Case
Fixed Bearing max of:
Fh-u(Rg+Rq) -189 kN -342 kN
Fh/2+u(Rg+Rq) 665 kN 437.256765 kN

Free bearing
u(Rg+Rq) 506 kN 405

Total Horizontal force normal 1171 kN

Design Longitudinal Force


= 1171 kN 843 kN
(B.F & F.F) - Service
Design Longitudinal Force - seismic = 0 kN DesignTransverse Force - seismic

Design Longitudinal Force - seismic

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4 Seismic force
Calculation of Seismic coefficients
 Z   Sa 
   g 
 2   
Ah 
 R 
 
 I 
Importance factor , I = 1.20
Zone Factor, Z (for Zone II) = 0.36
Response reduction factor, R Long- direction = 3.00
Response reduction factor, R Trans - direction = 3.00
Fundamental natural period

D
T 2 (Annexure D , IRC:6-2017)
1000 F
D= Appropriate dead load of the superstructure and live load in kN
F = Horizontal force in kN required to be applied at the centre of mass of the superstructure for one mm
horizontal deflection at the top of the pier for the earthquake in the transverse direction
and the force to be applied at the top of the bearings for the earthquake in the longitudinal direction
1.4.1 Calculation of Stiffness
Pier
Dimension of Pier - Longitudinal direction = 1.80 m
Dimension of Pier - Transverse direction = 6.40 m
Pier - design height = 9.20 m

Height of the C.G of Superstructure from soffit (DL+SIDL) (h) = 1.38 m

Grade of concrete = M 35
4
M.I in longitudinal direction IL (0.75 Cracked MOI) = 2.333 m =(6.40×1.80^3)/12
4
M.I in transverse direction IT (0.75 Cracked MOI) = 29.491 m =(1.80×6.40^3)/12
Modulus of elasticity of concrete E = 32000 N/mm2 (IRC:112-2011 Table 6.5)
Stiffness in trans direction K1T = 3EI/H3
=6×32000×1000×29.491/((9.55^2)×((3×(1.38))+(2
= 2167624 kN/m
×9.55)))

Stiffness - Longitudinal (3EIL/L3) K1L = 257122 kN/m =3×32000×1000×2.333/(9.55)^3


Height taken for the calculation (H) upto bearing top = 9.55 m
(H of shortest pier in the group)
Piles

Pile - Diameter = 1.50 m

Pile - Length ( L1+Lf) = 13.9 m

Number of pile per pier location "n" = 12 Nos.


4
Moment of inertia of one pile (I) = 0.2485 m =(3.142×(1.50)^4)/64
Grade of concrete = M 35
Young's modulus of elasticity of concrete E
(IRC:112-2011 Table 6.5)
= 32000 N/mm2
Stiffness of one pile k= 12EI / L3 = 35652 kN/m =(12×32000×1000×0.2485/(13.89)^3)
Stiffness of pile group = nk = 427825 kN/m =12×35652
Stiffness in trans direction K2T = 427825 kN/m
Stiffness in Long direction K2L = 427825 kN/m

Total Stiffness
Stiffness " k " = 1/(1/k1+1/k2)
Stiffness in Longitudinal direction "KL" = =1/(1/257122+1/427825)
= 160601 kN/m
= 160.60 kN/mm 257.1216373
Stiffness in transverse direction "KT" = 1/(1/2167624+1/427825)

= 357304 kN/m
= 357.30 kN/mm 2167.624218

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.4.2 Calculation of Seismic coefficient in the Longitudinal direction

S.No Description DL SIDL


1 Left bearing 6338 1268
2 Right Bearing 6338 1268
3 Free Pier 0 0
4 Right EJ Pier 0 0
Sub total 12676 2536
Total Load 15212 kN (=12676+2536)

D = 15212 kN
T = 0.486 (eq-1)
Sa/g = 2.500 2.50 for square pier link with this
= 2.500 for wall type pier full Sa/g considered
Horizontal accelaration longitudinal " AhL " = (Sa/g)*(Z/2)/(R/I)
= 0.180 =(0.36/2)×(2.500)/(3.00/1.20)
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017

1.4.3 Calculation of Seismic coefficient in the Transverse direction

S.No Description Load (kN) Remark

1 Dead Load 12676 1.1


2 SIDL 2536 1.1.2
3 Live Load 504 Refer 1.2.1
5 Pier(50%) 0
Total Seismic load (D) 15716

T = 0.170 (eq-1)
Sa/g = 2.500
Horizontal acceleration Transverse " AhT " = (Sa/g)*(Z/2)/(R/I)
= 0.180 (=(0.36/2)×2.500/(3.00/1.20))
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017

1.5 Centrifugal force


C = (WV2)/(127R)
Max Reaction case load = 2520 kN
Max Longitudinal case load = 1808 kN
Max transverse case load = 1628 kN
Design Speed " V " = 0.00 km/hr
Radius of curve " R " = 460 m
Centrifugal force
C.F -max reaction = 0 kN =2520×0×0/(127x460)
C.F-max longitudinal case = 0 kN =1808×0×0/(127x460)
C.F-max transverse case = 0 kN =1628×0×0/(127x460)

1.6 Wind Load


Ht. of Parapet (From C/S) = 1.00 m
Ht. of parapet from GL = 12.38

For height of 12.375m as per IRC:6-2017, Table:4 wind pressure is as below,

Table:4 wind pressure is for basic wind speed 33m/s


Assume Terrain without Obstructions

Wind speed in Delhi location = 36 m/s


(As per IS:875-Part3)
H (m) Pressure
At vehicle top 14.38 603
At parapet top 12.38 579
At girder bot. 8.98 552
2
Avg. Wind pressure (Pz) = 777.60 N/m

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

I) For Superstructure (as per Cl.209.3.3 of IRC:6-2017)

Gust Factor (G) for spans upto 150m = 2.0


Drag Coefficient (CD) = 2(1+c/20d) 2.210344828 = 1.3
Where, c= c/c distance of adjacent girders & d=depth of windward girder
2
Exposed area of superstructure (A1) 45.69 155.346 = 155 m

Transverse wind load (FT) = Pz x A1 x G x CD

= 314 kN
Longitudinal wind load (FL) = 79 kN

Width of Superstructure = 16.0 m


2
Plan Area (A3) 731.04 = 731 m

Lift Coefficient (CL) = 0.75

Vertical wind load (FV) = Pz x A3 x G x CL

(-ve sign indicates upward direction of wind force) = -853 kN


CG of wind load on Superstructure above bearing = 1.70 m

II) For Live load (as per Cl.209.3.3 of IRC:6-2017)

Gust Factor (G) = 2.0


Drag Coefficient (CD) = 1.95

Height of Vehicle = 3.0 m

Exposed ht. of vehicle = 2.00 m

For a height of 14.375m


2
Avg. Wind pressure (Pz) = 777.60 N/m

a) Max. Reaction case

Length of car on span 1 45.69 = 22.8 m

Length of car on span 2 45.69 = 22.8 m


2
Exposed area of Vehicle = 91.4 m
Transverse wind load (FT) = 277 kN

Longitudinal wind load (FL) = 69.3 kN

b) Max. long. moment case

Length of car on span 1 = 46 m

Length of car on span 2 = 46 m


2
Exposed area of Vehicle = 0.0 m
Transverse wind load (FT) = 0 kN

Longitudinal wind load (FL) = 0.0 kN

c) Max. trans. moment case

Length of car on span 1 = 23 m

Length of car on span 2 = 23 m


2
Exposed area of Vehicle 54.828 = 91.4 m
Transverse wind load (FT) = 277 kN

Longitudinal wind load (FL) = 69.3 kN

CG of wind load due to Live load above bearing = 4.35 m

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

III) For Substructure (as per Cl.209.4 of IRC:6-2017)

Height of pier (Piercap top to GL) h = 8.625 m

Dim. Parallel to wind d = 1.8 m

Dim. Perpendicular to wind b = 6.40 m

h/b = 1.35
d/b = 0.281
Drag Coefficient (CD) = 2.20
2
Exposed area of substructure (A1) = 17 m
2
Wind pressure (Pz) = 777.6 N/m
Transverse wind load (FT) Pz x A1 x G x CD = 59 kN

Height of pier (Piercap top to GL) h = 8.6 m

Dim. Parallel to wind d = 6.40 m

Dim. Perpendicular to wind b = 1.8 m

h/b = 4.79
d/b = 3.556
Drag Coefficient (CD) 1.579166667 = 1.14
2
Exposed area of substructure (A1) = 91.8 m
2
Wind pressure (Pz) = 777.6 N/m
Longitudinal wind load (FL) = 163 kN

1.9 Horizontal Force due to Water Current:


Average velocity of flow (Ref:Annexure-v) V = 3 m/sec

Lowest Bed level (As per hydrologycal data) = 55.975 m


say = 55.975 m
High Flood level = 61.15 m

Height of the pier exposed to water pressure - HFL condition = 5.75


Height of the pier exposed to water pressure - LWL condition = 0.58
Component of maximum velocity in lateral direction =(2)^0.5×3 = 4.24 m/sec
Width of the pier perpendicular to the direction of water flow = 1.80 m
Width of the Pile cap perpendicular to the direction of water flow = 10.80 m
Width of the pier parellal to the direction of water flow = 6.40 m
Width of the Pile cap parellal to the direction of water flow = 15.30 m

Intensity of pressure due to water P = 52KV2


Constant K depends on the shape - For pier & footings K = 0.66
Intensity of pressure =52×0.66×4.24^2 = 617.8 kg/m2
=617.76×9.81/1000 = 6.1 kN/m2
Variation of force due to water current over pier

Variation of velocity with depth (at HFL -S) (at HFL -N)
(at HFL) 6.06 6.06 kN/m2

HFL

13.4 5.75
3.17 3.46 kN/m2 Pier bottom
2.04 12.04 2.44 kN/m2 Pile bottom

SCOUR LEVEL

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity

HFL 6.1 0.940 =6.1×0.940 5.69 0.342 =6.1×0.342 2.07


Bottom of pier level 3.5 0.940 =3.5×0.940 3.25 0.342 =3.5×0.342 1.18

Bottom of footing level 2.4 0.940 =2.4×0.940 2.29 0.342 =2.4×0.342 0.83

Transverse Forces & Moments:


Force Transverse Moment at
Direction Component transverse
HT Lever arm Pier bottom Lever arm Pile Bottom

on pier 46.25 3.134 144.949 - -


Transverse
on pile cap 67.33 - - 1.190 329.11

1.189804147

Longitudinal Forces & Moments:


Longitudinal Moment at
Force long
Direction Component
HL Lever arm Pier bottom Lever arm Pile Bottom

on pier 59.85 3.1343 187.581 - -


Longitudinal
on pile cap 34.72 - - 1.19 363.55
1.189804147

HFL - SEISMIC CASE


degree to20
be considered
Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity
HFL 6.1 0.940 =6.1×0.940 5.69 0.342 =6.1×0.342 2.07
Bottom of pier level 3.2 0.940 =3.2×0.940 2.98 0.342 =3.2×0.342 1.08

Bottom of footing level 2.0 0.940 =2.0×0.940 1.91 0.342 =2.0×0.342 0.70

Transverse Forces & Moments:


Force Transverse Moment at
Direction Component transverse
HT Lever arm Pier bottom Lever arm Pile Bottom
on pier 44.84 3.172 142.259 - -
Transverse
on pier cap 59.43 - - 1.207 314.87

1.206569026
Longitudinal Forces & Moments:

Force long Longitudinal Moment at


Direction Component
HL Lever arm Pier bottom Lever arm Pile Bottom
on pier 58.03 3.172 184.100 - -
Longitudinal
on pier cap 30.65 - - 1.21 351.65

1.206569026

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

1.10 Buoyancy : HFL

Upto pier level Volume of water displaced 66.2 m^3


Weight to be deducted 661.8 kN

Upto pile cap Volume of water displaced 371.8 m^3


bottom / fdn
Weight to be deducted 3717.9 kN

Buoyancy : LWL

Volume of water displaced 6.6 m^3


Upto pier level
Weight to be deducted 66.2 kN

Upto pile cap Volume of water displaced 371.8 m^3


bottom
Weight to be deducted 3717.9 kN

1.51 Summary of Loads at the Top of Pier cap

P Horizontal Force (kN) Lever arm (m) Moment (kN-m)


S.No Description of Load
(kN) HT HL eT eL MT ML
1 D.L (Superstructure ) 12676 0 0 0 0 0 0
D.S.S 0
2 S.I.D.L- Fixed 1028 0 0 0 0 0 0
S.I.D.L- variable 1508 0 0 0 0 0 0
3 Live Load
L.L (Case 1-Max P) 2520 0 0 0.00 0.00 2395 1162
L.L (Case 2-Max ML) 1808 0 0 0.00 0.00 1718 2169
L.L (Case 3 - Max MT) 1628 0 0 0.00 0.00 6358 1170
4 Longitudinal Forces (additional vertical force is neglected)
4.1 Normal Condition 0 0 1171 0 0.35 0 410
4.2 During Seismic Condition 0 0 0 0 0.35 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -1521 2282 0 1.38 0 3151 0
5.1.2 Superstructure (SIDL) -304 456 0 2.80 0 1278 0
5.1.3 Superstructure (LL)
L.L (-Max P) -60 91 0 4.050 0 367 0
L.L ( Max ML) -43 65 0 4.050 0 264 0
L.L (- Max MT) -39 59 0 4.050 0 237 0
5.1.4 Substructure
5.2 Seismic Force (Longitudinal)
5.2.1 Superstructure (DL) -1521 0 2282 0 0.35 0 799
5.2.2 Superstructure (SIDL) -304 0 456 0 0.35 0 160
5.2.3 Substructure 0 0 0 0 0 0 0
6 Centrifugal Force
Max P 0 0 0 4.05 0 0 0
Max ML 0 0 0 4.05 0 0 0
Max MT 0 0 0 4.05 0 0 0
7 Wind Load
On superstructure -853 314 79 2.05 2.05 644 161
Live load max reaction case 0 277 69 4.35 4.35 1205 301
Live load max longitudinal case 0 0 0 4.35 4.35 0 0
Live load max Transverse case 0 277 69 4.35 4.35 1205 301
8 Buoyancy 0 0 0 0 0 0 0
9 Water Current 0 0 0 0 0 0 0

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.52 Load Combination at the Top of Pier cap for ULS condition

P Horizontal Force (kN) Moment (kN-m)


S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1) 23396 532 1890 4538 2426
2 Group I (Case-2) 22541 283 1828 2641 3363
3 Group I (Case-3) 22570 532 1890 10248 2611
4 Group II(Case-1) Wind Load 22179 887 1569 4977 2234
5 Group II(Case-2) Wind Load 21523 471 1465 2546 2708
6 Group II(Case-3) Wind Load 21545 887 1569 9354 2376

7 Group III (Case-1) Seismic Transverse 18713 4243 169 7578 268

Refer Annexure
8 Group III (Case-2) Seismic Transverse 18625 4205 169 7314 429

9 Group III (Case-3) Seismic Transverse 18635 4195 169 8144 293

10 Group IV (Case-1) Seismic Longitudinal 18804 0 4107 383 1624

11 Group IV (Case-2) Seismic Longitudinal 18690 0 4107 275 1785

12 Group IV (Case-3) Seismic Longitudinal 18694 0 4107 1144 1648

1.53 Load Combination at the Top of Pier cap for SLS condition

P Horizontal Force (kN) Moment (kN-m)


S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1 service-Rare) 17018 355 1260 3025 1617
2 Group I (Case-2 service-Rare) 16448 188 1219 1760 2242
3 Group I (Case-3 service-Rare) 16467 355 1260 6832 1741
4 Group II (Case-1 wind load-Rare) 16173 591 1026 3286 1467
5 Group II (Case-2 wind load-Rare) 15745 314 957 1674 1770
6 Group II (Case-3 wind load-Rare) 15760 591 1026 6141 1560
7 Group III (Case-1 Service-Frequent) 16599 296 952 2361 1236
8 Group III (Case-2 Service-Frequent) 16172 157 918 1353 1689 Refer Annexure
9 Group III (Case-3 Service-Frequent) 16186 296 952 5216 1329

10 Group IV (Case 1 Wind Load-Frequent) 15405 355 323 1493 545

11 Group IV (Case 2 Wind Load-Frequent) 15291 188 281 275 526

12 Group IV (Case 3 Wind Load-Frequent) 15295 355 323 1868 570

13 Group V (Case-1- Quasi permanent) 15513 0 0 0 0

1.54 Dead Load - Substructure


12.90 4.10
4.1 m

W1
0.750

0.750
W2 Traffic Direction

7.13
W3

6.40 1.80
0.58
2.25 m

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Load of Pier
W2 Area of flared portion (top) = 52.89 m2 Pedestal :
Area of flared portion (bot.) = 29.52 m2 Width = 1.100 m
Height of flared portion = 0.75 m Length = 1.100 m
Volume of flared portion = 30.5 m3 P (KN) e (m) from Pier Base
CG of the flared portion from top of straight
= 0.42 m 762.02 8.12
portion of pier

W3 Width = 6.40 m
Breadth = 1.80 m
Area of c/s of straight portion = 11.520 m2
Total Height of straight portion = 7.70 m =9.20-0.75-0.75
Volume of straight portion = 88.704 m3 P (KN) e (m) from Pier Base
2217.6 3.85
W1 Pier Cap
Length of pier cap = 12.90 m
Width of pier cap = 4.1 m
Avg.Thickness of pier cap = 0.75 m P (KN) e (m) from Pier Base
Volume of pier cap = 39.6675 m3 991.6875 8.825

Self wt of pier + pier cap = 3971 kN


Combined 3971 5.911
1.55 Summary of Load at the Pile Cap Top
Height of the pier = 9.200 m

P Horizontal Force (kN) Lever arm (m) Moment (kN-m)


S.No Description of Load
(kN)
HT HL eT eL MT ML
1 D.L (Super + Substructure ) 16647 0 0 0 0 0 0
D.S.S 0 0 0 0 0 0 0
2 S.I.D.L- Fixed 1028 0 0 0 0 0 0
S.I.D.L- variable 1508 0 0 0 0 0 0
3 Live Load
L.L (Case 1- Max P) 2520 0 0 0 0 2395 1162
L.L (Case 2 - Max ML) 1808 0 0 0 0 1718 2169
L.L (Case 3 - MT) 1628 0 0 0 0 6358 1170
4 Longitudinal Forces (additional vertical force is neglected)
4.1 Normal Condition 0 0 1171 0 9.55 0 11187
4.2 During Seismic Condition 0 0 0 0 9.55 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -1521 2282 0 10.58 0 24142 0
5.1.2 Superstructure (SIDL) -304 456 0 12.00 0 5477 0
5.1.3 Superstructure (LL)
L.L (Case 1-Max P) -60 91 0 13.25 0 1202 0
L.L (Case 2 - Max ML) -43 65 0 13.25 0 862 0
L.L (Case 3 - Max MT) -39 59 0 13.25 0 777 0
5.1.4 Substructure -477 715 0 5.91 0 4225 0
5.2 Seismic Force (Longitudinal)
5.2.1 Superstructure (DL) -1521 0 2282 0 9.55 0 21790
5.2.2 Superstructure (SIDL) -304 0 456 0 9.55 0 4359
5.2.3 Substructure -477 0 715 0.00 5.91 0 4225
6 Centrifugal Force
Max P 0 0 0 13.25 0 0 0
Max ML 0 0 0 13.25 0 0 0
Max MT 0 0 0 13.25 0 0 0
7 Wind Load
On superstructure -853 314 79 11.25 11.25 3533 883
Live load max reaction case 0 277 69 12.95 12.95 3589 897
Live load max longitudinal case 0 0 69 12.95 12.95 0 897
Live load max transverse case 0 277 69 12.95 12.95 3589 897
On substructure 0 59 163 4.60 4.60 271 751
8 Vehicle Collision Load
Longitudinal - Main Component 0 0 1000 0 2.1 0 2075
Transverse - Main Component 0 500 0 3.58 0 1788 0
Longitudinal - Residual Component 0 0 500 0 2.1 0 1038
Transverse - Residual Component 0 250 0 3.58 0 894 0
8 Construction Load
8.1 L.G. Case 1 (Max 'P') 0 0 0.00 9.20 9.20 0 0
8.2 L.G. Case 2 (Max 'ML') 0 0 0 9.20 9.20 0 0
8.3 L.G. Case 3 (Max 'MT') 0 0 0 9.20 9.20 0 0
8.4 Dead Load of Superstructure 0 0 0 0.00 0.00 0 0
8.5 Dead Load of Substructure 3971 0 0 0.00 0.00 0 0
8.6 Seismic Load Superstructure 0 0 0 10.51 0.00 0 0
8.7 Seismic Load Substructure 0 0 0 5.91 0.00 0 0

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Newly added 8 Water current


LWL Normal/Seismic
HFL Normal 46 59.8 145 187.6
HFL-seismic 45 58 142 184
9 Buyoyancy
LWL Normal/Seismic -66
HFL Normal -662
HFL-seismic -662
10 Hydrodynamic
LWL Seismic 1 1 0 0
HFL Seismic 19 19 46 46

1.56 Seismic Force Combination


S.No Combination P HT HL MT ML
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -709 3544 1036 35047 9112
1.2 (0.3L+T+0.3V) Max. P 709 3544 1036 35047 9112
1.3 (0.3L+T-0.3V) Max ML -704 3518 1036 34708 9112
1.4 (0.3L+T+0.3V) Max ML 704 3518 1036 34708 9112
1.5 (0.3L+T-0.3V) Max MT -702 3512 1036 34622 9112
1.6 (0.3L+T+0.3V) Max MT 702 3512 1036 34622 9112
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -691 1063 3453 10514 30375
2.2 (L+0.3T+0.3V) Max. P 691 1063 3453 10514 30375
2.3 (L+0.3T-0.3V) Max ML -691 1055 3453 10412 30375
2.4 (L+0.3T+0.3V) Max ML 691 1055 3453 10412 30375
2.5 (L+0.3T-0.3V) Max MT -691 1053 3453 10387 30375
2.6 (L+0.3T+0.3V) Max MT 691 1053 3453 10387 30375
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -2362 1063 1036 10514 9112
3.2 (0.3L+0.3T+V) Max. P 2362 1063 1036 10514 9112
3.3 (0.3L+0.3T-V) Max ML -2345 1055 1036 10412 9112
3.4 (0.3L+0.3T+V) Max ML 2345 1055 1036 10412 9112
3.5 (0.3L+0.3T-V) Max MT -2341 1053 1036 10387 9112
3.6 (0.3L+0.3T+V) Max MT 2341 1053 1036 10387 9112

1.57 Load Combination at the Top of Pile cap - SLS

LWL - Case
Moment Resultant
P Horizontal Force (kN) Moment (kN-m) kNm
S.No Load Combination Remark
(kN)
HT HL MT ML
1 Group I (Case-1 service-Rare) 20979 390 1358 6352 13636 15043
2 Group I (Case-2 service-Rare) 20409 224 1358 3657 14441 14897
3 Group I (Case-3 service-Rare) 20429 390 1358 10158 13759 17103
4 Group II (Case-1 wind load-Rare) 20134 650 1190 8830 11619 14594
5 Group II (Case-2 wind load-Rare) 19707 373 1190 1946 11501 11664
6 Group II (Case-3 wind load-Rare) 19721 650 1190 8796 10989 14076
7 Group III (Case-1 Service-Frequent) 20560 325 1034 5134 10354 11556
8 Group III (Case-2 Service-Frequent) 20133 187 1034 2933 10957 11343 Refer Annexure

9 Group III (Case-3 Service-Frequent) 20148 325 1034 7988 10446 13150

10 Group IV (Case 1 Wind Load-Frequent) 19366 390 421 4819 3942 6226

11 Group IV (Case 2 Wind Load-Frequent) 19252 224 421 2558 4103 4835

12 Group IV (Case 3 Wind Load-Frequent) 19256 390 421 5581 3967 6847

13 Group V (Case-1- Quasi permanent) 19475 0 0 0 0 0

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

HFL - Case

Horizontal Force (kN) Moment (kN-m) Moment Resultant


P
S.No Load Combination kNm Remark
(kN) HT HL MT ML

1 Group I (Case-1 service-Rare) 20890 436 1418 6497 13823 15274


2 Group I (Case-2 service-Rare) 20320 270 1418 3802 14629 15115
3 Group I (Case-3 service-Rare) 20339 436 1418 10303 13947 17340
4 Group II (Case-1 wind load-Rare) 20045 696 1249 8975 11807 14831
5 Group II (Case-2 wind load-Rare) 19617 419 1249 2091 11688 11874
6 Group II (Case-3 wind load-Rare) 19632 696 1249 8941 11177 14313
7 Group III (Case-1 Service-Frequent) 20471 371 1094 5278 10541 11789 Refer Annexure
8 Group III (Case-2 Service-Frequent) 20044 233 1094 3078 11145 11562
9 Group III (Case-3 Service-Frequent) 20058 371 1094 8133 10634 13387
10 Group IV (Case 1 Wind Load-Frequent) 19277 436 481 4964 4130 6458
11 Group IV (Case 2 Wind Load-Frequent) 19163 270 481 2703 4291 5071
12 Group IV (Case 3 Wind Load-Frequent) 19167 436 481 5725 4155 7074
13 Group V (Case-1- Quasi permanent) 19385 0 0 0 0 0

1.58 Load Combination at the Top of Pile cap - ULS


LWL- Case
P Horizontal Force (kN) Moment (kN-m) Moment Resultant
S.No Load Combination kNm Remark
(kN) HT HL MT ML
1 Group I (Case-1) 28747 585 2037 9528 20454 22564
2 Group I (Case-2) 27893 336 2037 5486 21662 22345
3 Group I (Case-3) 27921 585 2037 15237 20639 25654

4 Group II(Case-1) Wind Load 27530 975 1814 13293 17732 22162

5 Group II(Case-2) Wind Load 26875 560 1814 7288 18658 20031

6 Group II(Case-3) Wind Load 26897 975 1814 17671 17874 25134

7 Group III (Case-1A) Seismic Transverse(-V) 25774 5317 1723 52954 16092 55346
Refer Annexure
8 Group III (Case-1B) Seismic Transverse(+V) 27900 5317 1723 52954 16092 55346

9 Group III (Case-2A) Seismic Transverse (-V) 25668 5278 1723 52337 16253 54802

Group III (Case-2B) Seismic Transverse


10 25668 5278 1723 52337 16253 54802
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 25674 5268 1723 53078 16117 55471

12 Group III (Case-3B) Seismic Transverse(+V) 27781 5268 1723 53078 16117 55471

Group IV (Case-1A) Seismic Longitudinal(-


13 25801 1595 5180 16155 45748 48517
V)
Group IV (Case-1B) Seismic
14 27893 5277 1555 52445 13855 54244
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 25687 1583 5180 15893 45909 48582
V)
Group IV (Case-2B) Seismic
16 27759 1583 5180 15893 45909 48582
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 25691 1581 5180 16724 45773 48732
V)
Group IV (Case-3B) Seismic
18 27763 1581 5180 16724 45773 48732
Longitudinal(+V)

18 Group V (Case-1A) Seismic Vertical(-V) 23294 1595 1723 16155 16092 22802

18 Group V (Case-1B) Seismic Vertical(+V) 30381 1595 1723 16155 16092 22802

18 Group V (Case-2A) Seismic Vertical(-V) 23205 1583 1723 15893 16253 22732

18 Group V (Case-2B) Seismic Vertical(+V) 30241 1583 1723 15893 16253 22732

18 Group V (Case-3A) Seismic Vertical(-V) 23216 1581 1723 16724 16117 23226

18 Group V (Case-3B) Seismic Vertical(+V) 30239 1581 1723 16724 16117 23226

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL- Case
Horizontal Force (kN) Moment (kN-m) Moment Resultant
P kNm
S.No Load Combination Remark
(kN) HT HL MT ML

1 Group I (Case-1) 28658 631 2097 9673 20641 22795

2 Group I (Case-2) 27803 382 2097 5631 21849 22563

3 Group I (Case-3) 27832 631 2097 15382 20826 25891

4 Group II(Case-1) Wind Load 27441 1022 1874 13438 17920 22399

5 Group II(Case-2) Wind Load 26785 606 1874 7432 18845 20258

6 Group II(Case-3) Wind Load 26807 1022 1874 17816 18061 25369

7 Group III (Case-1A) Seismic Transverse(-V) 25179 5379 1786 53143 16290 55583 Refer annex

8 Group III (Case-1B) Seismic Transverse(+V) 27305 5379 1786 53143 16290 55583

9 Group III (Case-2A) Seismic Transverse (-V) 25072 5341 1786 52525 16451 55041

Group III (Case-2B) Seismic Transverse


10 27183 5341 1786 52525 16451 55041
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 25078 5331 1786 53266 16315 55709

12 Group III (Case-3B) Seismic Transverse(+V) 27185 5331 1786 53266 16315 55709

Group IV (Case-1A) Seismic Longitudinal(-


13 25206 1645 5256 16311 45978 48786
V)
Group IV (Case-1B) Seismic
14 27297 5328 1631 52601 14085 54454
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 25092 1634 5256 16049 46139 48851
V)
Group IV (Case-2B) Seismic
16 27164 1634 5256 16049 46139 48851
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 25096 1631 5256 16881 46003 49002
V)
Group IV (Case-3B) Seismic
18 27167 1631 5256 16881 46003 49002
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 22698 1645 1786 16311 16290 23052

20 Group V (Case-1B) Seismic Vertical(+V) 29785 1645 1786 16311 16290 23052

21 Group V (Case-2A) Seismic Vertical(-V) 22610 1634 1786 16049 16451 22983

22 Group V (Case-2B) Seismic Vertical(+V) 29646 1634 1786 16049 16451 22983

23 Group V (Case-3A) Seismic Vertical(-V) 22620 1631 1786 16881 16315 23476

24 Group V (Case-3B) Seismic Vertical(+V) 29643 1631 1786 16881 16315 23476

25 Group VI (Accidental) Case 1 19486 0 2379 287 11642 11646

26 Group VI (Accidental) Case 2 20268 0 2379 6895 12804 14543

27 Group VI (Accidental) Case 3 20183 46 2438 4437 12480 13245

28 Group VI (Accidental) Case 4 20596 796 938 4263 9275 10208

29 Group VI (Accidental) Case 5 20169 796 938 3857 9879 10605

30 Group VI (Accidental) Case 6 20183 796 938 7118 9368 11765

11.52 165
1.60 Summary of Load at pile cap bottom Footing 372
Depth of pile cap /Open foundation = 2.25 W1 9295 e1 1.125
Height from Piercap Top = 11.45 m W2 0 e2 2.250
Dead load of the Pier at this level = 3971 kN Soil W3 1768 e3 2.54
Dead load of the pile cap = 9295 kN W= 11063 e= 1.351

0.000
2.83
0.6 e3
Wt of soil 1768 KN e2
Wt of water from GL to HFL acting on Footing 7947 KN e1
buyoyancy on soil 884 KN

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Pier +Piercap 3971 e11 = 8.161
Total weight to be used for seismic in foundation 9295 KN Sub+Fdn 15034 3.3895
(Only for exposed pile cap, Zero in case of embedded Open foundation or pile cap)

P Horizontal Force (kN) Lever arm (m) Moment (kN-m)


S.No Description of Load
(kN)
HT HL eT eL MT ML
1 D.L (Super + Substructure ) 27710 0 0 0 0 0 0
D.S.S 0 0 0 0 0 0 0
2 S.I.D.L- Fixed 1028 0 0 0 0 0 0
S.I.D.L- variable 1508 0 0 0 0 0 0
3 Live Load
L.L (Case 1-Max P) 2520 0 0 0 0 2395 1162
L.L (Case 2 - Max ML) 1808 0 0 0 0 1718 2169
L.L (Case 3 - Max MT) 1628 0 0 0 0 6358 1170
4 Longitudinal Forces (additional vertical force is neglected) *** HL in trans seismic is not shown here. Cell H679 linked separately in Annex tables
4.1 Normal Condition 0 0 1171 0 11.80 0 13823
4.3 During Seismic Condition 0 0 0 0 11.80 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -1521 2282 0 12.83 0 29276 0
5.1.2 Superstructure (SIDL) -304 456 0 14.25 0 6504 0
5.1.3 Superstructure (LL)
L.L (Case 1-Max P) -60 91 0 15.50 0 1406 0
L.L (Case 2 - Max ML) -43 65 0 15.50 0 1009 0
L.L (Case 3 - Max MT) -39 59 0 15.50 0 909 0
5.1.4 Substructure + Foundation -1592 2388 0 3.39 0 8094 0
5.2 Seismic Force (Longitudianal)
5.2.1 Superstructure (DL) -1521 0 2282 0 11.80 0 26924
5.2.2 Superstructure (SIDL) -304 0 456 0 11.80 0 5386
5.2.3 Substructure + Foundation -1592 0 2388 0 3.39 0 8094
6 Centrifugal Force
Max P 0 0 0 15.50 0 0 0
Max ML 0 0 0 15.50 0 0 0
Max MT 0 0 0 15.50 0 0 0
7 Wind Load
On superstructure -853 314 79 13.50 13.50 4240 1060
Live load max reaction case 0 277 69 15.20 15.20 4212 1053
Live load max longitudinal case 0 0 69 15.20 15.20 0 1053
Live load max transverse case 0 277.12 69 15.20 15.20 4212 1053
On substructure 0 59 163 6.85 6.85 404 1119
8 Construction Load
8.1 L.G. Case 1 (Max 'P') 0 0 0 11.45 11.45 0 0
8.2 L.G. Case 2 (Max 'ML') 0 0 0 11.45 11.45 0 0
8.3 L.G. Case 3 (Max 'MT') 0 0 0 11.45 11.45 0 0
8.4 Dead Load of the Superstructure 0 0 0 0 0 0 0
8.5 Dead Load of the Substructure 13266 0 0 0 0 0 0
8.6 Seismic Load of Superstructure 0 0 0 12.76 0.00 0 0
8.7 Seismic Load of Substructure 0 0 0 8.16 0.00 0 0

8 Water current
LWL Normal/Seismic
HFL Normal 114 94.6 329 363.5
HFL-seismic 104 89 315 352
9 Buyoyancy
LWL Normal/Seismic -4668
HFL Normal -5264
HFL-seismic -5264
10 Hydrodynamic
LWL Seismic 143 286 139 277
HFL Seismic 152 295 217 355

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.61 Seismic Force Combination
S.No Combination P HT HL MT ML
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -1043 5217 1538 45280 12121
1.2 (0.3L+T+0.3V) Max. P 1043 5217 1538 45280 12121
1.3 (0.3L+T-0.3V) Max ML -1038 5191 1538 44883 12121
1.4 (0.3L+T+0.3V) Max ML 1038 5191 1538 44883 12121
1.5 (0.3L+T-0.3V) Max MT -1037 5185 1538 44783 12121
1.6 (0.3L+T+0.3V) Max MT 1037 5185 1538 44783 12121
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -1025 1565 5126 13584 40404
2.2 (L+0.3T+0.3V) Max. P 1025 1565 5126 13584 40404
2.3 (L+0.3T-0.3V) Max ML -1025 1557 5126 13465 40404
2.4 (L+0.3T+0.3V) Max ML 1025 1557 5126 13465 40404
2.5 (L+0.3T-0.3V) Max MT -1025 1555 5126 13435 40404
2.6 (L+0.3T+0.3V) Max MT 1025 1555 5126 13435 40404
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -3478 1565 1538 13584 12121
3.2 (0.3L+0.3T+V) Max. P 3478 1565 1538 13584 12121
3.3 (0.3L+0.3T-V) Max ML -3461 1557 1538 13465 12121
3.4 (0.3L+0.3T+V) Max ML 3461 1557 1538 13465 12121
3.5 (0.3L+0.3T-V) Max MT -3456 1555 1538 13435 12121
3.6 (0.3L+0.3T+V) Max MT 3456 1555 1538 13435 12121

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
1.62 Summary of Load at pile cap bottom at SLS condition
LWL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML

1 Group I (Case-1 service-Rare) 31352 390 1358 7230 16692 18190


2 Group I (Case-2 service-Rare) 30782 224 1358 4161 17497 17985
3 Group I (Case-3 service-Rare) 30801 390 1358 11036 16815 20113
4 Group II (Case-1 wind load-Rare) 30506 650 1190 10293 14296 17616
5 Group II (Case-2 wind load-Rare) 30079 373 1190 5675 14900 15944
6 Group II (Case-3 wind load-Rare) 30094 650 1190 13148 14389 19491
7 Group III (Case-1 Service-Frequent) 30933 325 1034 5865 12680 13971
8 Group III (Case-2 Service-Frequent) 30505 187 1034 3353 13284 13701 Refer Annexure
9 Group III (Case-3 Service-Frequent) 30520 325 1034 8720 12773 15465

10 Group IV (Case 1 Wind Load-Frequent) 29739 390 421 5697 4889 7508

11 Group IV (Case 2 Wind Load-Frequent) 29625 224 421 3061 5051 5906

12 Group IV (Case 3 Wind Load-Frequent) 29628 390 421 6458 4914 8115

13 Group V (Case-1- Quasi permanent) 29847 0 0 0 0 0

HFL - Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML

1 Group I (Case-1 service-Rare) 39210 504 1453 7559 17055 18655

2 Group I (Case-2 service-Rare) 38640 337 1453 4490 17860 18416

3 Group I (Case-3 service-Rare) 38659 504 1453 11365 17178 20598

4 Group II (Case-1 wind load-Rare) 38364 764 1284 10622 14660 18104

5 Group II (Case-2 wind load-Rare) 37937 487 1284 6004 15263 16402

6 Group II (Case-3 wind load-Rare) 37951 764 1284 13477 14752 19981

7 Group III (Case-1 Service-Frequent) 38791 439 1129 6194 13044 14440 Remark

8 Group III (Case-2 Service-Frequent) 38363 300 1129 3682 13648 14136

9 Group III (Case-3 Service-Frequent) 38378 439 1129 9049 13136 15951

10 Group IV (Case 1 Wind Load-Frequent) 37597 504 515 6026 5253 7994

11 Group IV (Case 2 Wind Load-Frequent) 37483 337 515 3391 5414 6388

12 Group IV (Case 3 Wind Load-Frequent) 37486 504 515 6787 5278 8598

13 Group V (Case-1- Quasi permanent) 37705 0 0 0 0 0

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

1.63 Summary of Load for Base Pressure at pile cap bottom


LWL- Case
Horizontal Force (kN) Moment (kN-m) Moment Resultant
P
S.No Load Combination kNm Remark
(kN) HT HL MT ML

1 Group I (Case-1) 27594 0 1171 1916 14753 14876

2 Group I (Case-2) 27024 0 1171 1374 15558 15618

3 Group I (Case-3) 27043 0 1171 5722 14876 15938

4 Group II(Case-1) Wind Load 26741 650 1482 10772 17984 20964

5 Group II(Case-2) Wind Load 26171 373 1482 6018 18789 19730

6 Group II(Case-3) Wind Load 26191 650 1482 14579 18107 23247

7 Group III (Case-1A) Seismic Transverse(-V) 24572 7186 3005 61345 30455 68489

8 Group III (Case-1B) Seismic Transverse(+V) 27389 7186 3005 61651 26577 67136 Refer Annexure

9 Group III (Case-2A) Seismic Transverse (-V) 24465 7151 3005 61006 26738 66609

Group III (Case-2B) Seismic Transverse


10 27268 7151 3005 61006 26738 66609
(+V)

11 Group III (Case-3A) Seismic Transverse(-V) 24471 7142 3005 61741 26602 67228

12 Group III (Case-3B) Seismic Transverse(+V) 27271 7142 3005 61741 26602 67228

Group IV (Case-1A) Seismic Longitudinal(-


13 24597 2156 7206 18764 55008 58120
V)
Group IV (Case-1B) Seismic
14 27365 2156 7206 18764 55008 58120
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 24483 2145 7206 18494 6164 19494
V)
Group IV (Case-2B) Seismic
16 27251 2145 7206 18494 55169 58186
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 24487 2143 7206 19323 55033 58327
V)
Group IV (Case-3B) Seismic
18 27255 2143 7206 19323 55033 58327
Longitudinal(+V)

19 Group V (Case-1A) Seismic Vertical(-V) 21286 2156 3333 18764 30455 35771

20 Group V (Case-1B) Seismic Vertical(+V) 30676 2156 3333 18764 30455 35771

21 Group V (Case-2A) Seismic Vertical(-V) 21195 2145 3333 18494 30616 35769

22 Group V (Case-2B) Seismic Vertical(+V) 30539 2145 3333 18494 30616 35769

23 Group V (Case-3A) Seismic Vertical(-V) 21205 2143 3333 19323 30480 36089

24 Group V (Case-3B) Seismic Vertical(+V) 30537 2143 3333 19323 30480 36089

HFL- Case
Horizontal Force (kN) Moment Resultant
Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
HT HL MT ML

1 Group I (Case-1) 34945 114 1266 2245 15116 15282

2 Group I (Case-2) 34376 114 1266 1703 15921 16012

3 Group I (Case-3) 34395 114 1266 6051 15239 16397

4 Group II(Case-1) Wind Load 34093 764 1577 11101 18348 21445

5 Group II(Case-2) Wind Load 33523 487 1577 6348 19153 20177

6 Group II(Case-3) Wind Load 33542 764 1577 14908 18471 23736

7 Group III (Case-1A) Seismic Transverse(-V) 31924 7299 3096 61737 26952 67364

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

8 Group III (Case-1B) Seismic Transverse(+V) 34741 7299 3096 62044 26952 67645

9 Group III (Case-2A) Seismic Transverse (-V) 31817 7264 3096 61399 27113 67119

Group III (Case-2B) Seismic Transverse


10 34620 7264 3096 61399 27113 67119
(+V)

11 Group III (Case-3A) Seismic Transverse(-V) 31823 7256 3096 62133 26977 67737

12 Group III (Case-3B) Seismic Transverse(+V) 34622 7256 3096 62133 26977 67737

Group IV (Case-1A) Seismic Longitudinal(-


13 31949 2263 7304 19102 55437 58636
V)
Group IV (Case-1B) Seismic
14 34717 2263 7304 19102 55437 58636
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 31835 2252 7304 18833 6593 19953
V)
Group IV (Case-2B) Seismic
16 34603 2252 7304 18833 55598 58701
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 31838 2250 7304 19662 55462 58844
V)
Group IV (Case-3B) Seismic
18 34606 2250 7304 19662 55462 58844
Longitudinal(+V)

19 Group V (Case-1A) Seismic Vertical(-V) 28638 2263 3425 19102 30830 36268

20 Group V (Case-1B) Seismic Vertical(+V) 38028 2263 3425 19102 30830 36268

21 Group V (Case-2A) Seismic Vertical(-V) 28547 2252 3425 18833 30991 36265

22 Group V (Case-2B) Seismic Vertical(+V) 37891 2252 3425 18833 30991 36265

23 Group V (Case-3A) Seismic Vertical(-V) 28556 2250 3425 19662 30855 36587

24 Group V (Case-3B) Seismic Vertical(+V) 37889 2250 3425 19662 30855 36587

1.64 Summary of Load at pile cap bottom at ULS condition

LWL- CASE

P Horizontal Force (kN) Moment (kN-m) Moment Resultant


S.No Load Combination kNm Remark
(kN) HT HL MT ML
1 Group I (Case-1) 42991 585 2037 10844 25037 27285

2 Group I (Case-2) 42137 336 2037 6241 26245 26977

3 Group I (Case-3) 42166 585 2037 16554 25222 30169

4 Group II(Case-1) Wind Load 41774 975 1544 15488 18634 24230

5 Group II(Case-2) Wind Load 41119 560 1814 8547 22739 24292

6 Group II(Case-3) Wind Load 41141 975 1814 19865 21955 29608

7 Group III (Case-1A) Seismic Transverse(-V) 35057 10707 3368 92216 26803 96032

8 Group III (Case-1B) Seismic Transverse(+V) 39283 10707 3368 92216 26803 96032

9 Group III (Case-2A) Seismic Transverse (-V) 34954 10655 3368 91302 26964 95201
Group III (Case-2B) Seismic Transverse
10 39158 10655 3368 91302 26964 95201
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 34960 10642 3368 91969 26828 95802

12 Group III (Case-3B) Seismic Transverse(+V) 39160 10642 3368 91969 26828 95802
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 35094 3212 10666 27933 82280 86892
V)
Group IV (Case-1B) Seismic
14 39246 3212 10666 27933 82280 86892
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 34980 3196 10666 27583 82441 86933
V)
Group IV (Case-2B) Seismic
16 39132 3196 10666 27583 82441 86933
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 34984 3193 10666 28392 82305 87064
V)
Group IV (Case-3B) Seismic
18 39136 3193 10666 28392 82305 87064
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 30127 3212 3368 27933 27579 39253

20 Group V (Case-1B) Seismic Vertical(+V) 44213 3212 3368 27933 27579 39253

21 Group V (Case-2A) Seismic Vertical(-V) 30048 3196 3368 27583 27740 39119

22 Group V (Case-2B) Seismic Vertical(+V) 44064 3196 3368 27583 27740 39119

23 Group V (Case-3A) Seismic Vertical(-V) 30061 3193 3368 28392 27603 39599

24 Group V (Case-3B) Seismic Vertical(+V) 44059 3193 3368 28392 27603 39599

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
Job No. 4800197 DD-013
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - CASE

P Horizontal Force (kN) Moment (kN-m) Moment Resultant


S.No Load Combination Remark
(kN) HT HL MT ML kNm
1 Group I (Case-1) 53631 699 2132 11174 25401 27750

2 Group I (Case-2) 52776 449 2132 6570 26609 27408

3 Group I (Case-3) 52805 699 2132 16883 25586 30654

4 Group II(Case-1) Wind Load 52414 1089 1639 15817 18997 24720

5 Group II(Case-2) Wind Load 51758 673 1908 8876 23102 24749

6 Group II(Case-3) Wind Load 51780 1089 1908 20194 22318 30098

7 Group III (Case-1A) Seismic Transverse(-V) 45190 10820 3460 92608 27178 96514

8 Group III (Case-1B) Seismic Transverse(+V) 49416 10820 3460 92608 27178 96514

9 Group III (Case-2A) Seismic Transverse (-V) 45087 10768 3460 91695 27339 95684

Group III (Case-2B) Seismic Transverse


10 49292 10768 3460 91695 27339 95684
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 45093 10755 3460 92362 27203 96285

12 Group III (Case-3B) Seismic Transverse(+V) 49293 10755 3460 92362 27203 96285
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 45227 3319 10764 28271 82710 87408
V)

Group IV (Case-1B) Seismic


14 49379 3319 10764 28271 82710 87408
Longitudinal(+V)

Group IV (Case-2A) Seismic Longitudinal(-


15 45113 3303 10764 27921 82871 87448
V)
Group IV (Case-2B) Seismic
16 49265 3303 10764 27921 82871 87448
Longitudinal(+V)

Group IV (Case-3A) Seismic Longitudinal(-


17 45117 3300 10764 28730 82734 87581
V)
Group IV (Case-3B) Seismic
18 49269 3300 10764 28730 82734 87581
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 40261 3319 3460 28271 27954 39758

20 Group V (Case-1B) Seismic Vertical(+V) 54346 3319 3460 28271 27954 39758

21 Group V (Case-2A) Seismic Vertical(-V) 40181 3303 3460 27921 28115 39624

22 Group V (Case-2B) Seismic Vertical(+V) 54197 3303 3460 27921 28115 39624

23 Group V (Case-3A) Seismic Vertical(-V) 40194 3300 3460 28730 27978 40103

24 Group V (Case-3B) Seismic Vertical(+V) 54192 3300 3460 28730 27978 40103

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation 4800197-GGN-


and Upgradation by Four-Laning of NH-31D from KM 113.20 DD-013
Job No. 4800197
to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section
in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

CALCULATION OF HYDRODYNAMIC FORCES ON BRIDGE

Under H.F.L. =>In longitudinal direction

Existing Levels Depth submerged


H.F.L. = 55.975 m Pier cap 0.000
Pier cap bottom level = 63.778 m Pier shaft 0.575
Pier shaft bottom level = 55.400 m Pile cap 2.250
Pile cap bottom level = 53.150 m
Max. Scour Level = 47.765 m
pile cap
radius of
pier shaft radius of enveloping
enveloping circle
circle

15.3

1.80 10.8

Dimension of pier shaft transverse direction 1.80


Dimension of pier shaft long direction 1.80
Radius ofenveloping circle trans 0.900
Radius ofenveloping circle long 0.900

Dimension of Pile cap in transverse direction 15.3


Dimension of Pile cap in long direction 10.8
Radius ofenveloping circle trans 7.7
Radius ofenveloping circle long 5.4
Horizontal Force due to hydromdynamic effect, F=Ce.Ah.We
where Ce : coefficient depends on ratio of height of submerged portion and radius of
enveloping circle
W e : weight of the enveloping cylinder in Kg
Ah : horizontal seismic coefficient

Design of Pier
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation 4800197-GGN-


and Upgradation by Four-Laning of NH-31D from KM 113.20 DD-013
Job No. 4800197
to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section
in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Long Seismic
Element H r H/r Ce We Ah F
(m) (m) (t) (long) (kN)
Pier Shaft 0.575 0.900 0.639 0.39 1.463 0.18 1.008
Pile Cap 2.25 7.650 0.294 0.39 415.134 0.18 285.887

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m)
Pier Shaft 1 1 0.4286 1.008 0.246 from pier shaft base
Pile Cap 1 1 0.4286 285.887 0.964 from pile cap base

Under H.F.L. =>In Transverse direction


radius of
pier shaft radius of enveloping pile cap
enveloping circle
circle

10.8

1.8 15.3

Element H r H/r Ce We Ah F
(m) (m) (t) (trans) (kN)
Pier Shaft 0.575 0.900 0.639 0.39 1.463 0.18 1.008
Pile Cap 2.25 5.400 0.417 0.39 207.583 0.18 142.955

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m)
Pier Shaft 1 1 0.4286 1.008 0.246 from pier shaft base
Pile Cap 1 1 0.4286 142.955 0.964 from pile cap base

Design of Pier
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and 4800197-GGN-DD-013


Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Job No. 4800197
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Date
state of West Bengal

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

CALCULATION OF HYDRODYNAMIC FORCES ON BRIDGE


(REFER: IS1893-3-Cl 11 )
Under H.F.L. =>In longitudinal direction
Existing Levels Depth submerged
H.F.L. = 61.145 m Pier cap 0.000 m
Pier cap bottom level = 63.778 m Pier shaft 5.745 m
Pier shaft bottom level = 55.400 m Pile cap 2.250 m
Pile cap bottom level = 53.150 m
Max. Scour Level = 47.765 m
pile cap
radius of
pier shaft radius of enveloping
enveloping circle
circle

15.3

1.80 10.8

Dimension of pier shaft transverse direction 1.80 m


Dimension of pier shaft long direction 1.80 m
Radius ofenveloping circle trans 0.900 m
Radius ofenveloping circle long 0.900 m

Dimension of Pile cap in transverse direction 15.3 m


Dimension of Pile cap in long direction 10.8 m
Radius ofenveloping circle trans 7.7 m
Radius ofenveloping circle long 5.4 m
Horizontal Force due to hydromdynamic effect, F=Ce.Ah.We
where Ce : coefficient depends on ratio of height of submerged portion and radius of
enveloping circle
We : weight of the enveloping cylinder in Kg
Ah : horizontal seismic coefficient
Long Seismic
Element H r H/r Ce We Ah F M
(m) (m) (t) (long) (kN) (kN-m)
Pier Shaft 5.745 0.900 6.383 0.73 14.619 0.18 18.845 46.401
Pile Cap 2.25 7.650 0.294 0.39 428.290 0.18 294.947 355.062

Point of application of loads

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and 4800197-GGN-DD-013


Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Job No. 4800197
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Date
state of West Bengal

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Elements C1 C3 C4 C3.F C4.H (m) Level (m)


Pier Shaft 1 1 0.4286 18.845 2.462 from pier shaft base 57.862
Pile Cap 1 1 0.4286 294.947 0.964 from pile cap base 54.114

Under H.F.L. =>In Transverse direction


radius of
pier shaft radius of enveloping pile cap
enveloping circle
circle

10.8

1.8 15.3

Element H r H/r Ce We Ah F M
(m) (m) (t) (trans) (kN) (kN-m)
Pier Shaft 5.745 0.900 6.383 0.73 14.619 0.18 18.845 46.401
Pile Cap 2.25 5.400 0.417 0.39 220.739 0.18 152.015 217.224

Point of application of loads


Elements C1 C3 C4 C3.F C4.H (m) Level (m)
Pier Shaft 1 1 0.4286 18.845 2.462 from pier shaft base 57.862
Pile Cap 1 1 0.4286 152.015 0.964 from pile cap base 54.114

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

2.0 Pier - Section Design

Pier Section

Reinforcement Details

Dia of bar provided trans direction 52 nos 32 dia at each face


Dia of bar provided long direction 25 nos 25 dia at each face
Total Area 108131 mm^2

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

ULS Section capacity check

UR 0.78 OK

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Shear Capacity due to concrete

Shear capacity of concrete is more than longitudnal shear force

SLS - stress check

Rare - critical combination

Limit
Stress in concrete 5.4 Mpa 16.8 Mpa ok
Stress in Steel 31.1 Mpa 440 Mpa ok

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Job No. 4800197
Ghoshpukur-Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-Nov-19
Akshit S.Chatterjee

Crack width - critical combination

As QP moments are less than cracking moments of section, therforcesection remains uncracked

Limit
Crack width 0 mm 0.3 mm OK
section is uncracked

Minimum Reinforcment for Pier

Vertical Reinforcement

Dia of vertical bars should not be less than 12 mm OK

Area of minimum RF provided should be greater of .1 Ned/fyd or .002Ac


6352.386 23040

Provided Ast 108130.61 OK

Transverse Reinforcement
Spacing Dia
Provided in Drawing 150 mm OK 12 mm OK
spacing of transverse RF should not be more than dia should not be less than

384 mm 8 mm
1800 mm 8 mm
200 mm

Pier_P7_9.6m_12piles
Shear Capapcity of pier (concrete)

bw 6400 mm Vz 5256 kN
deff 1740.00 mm N 22609705.65 N
Fck 35 Mpa Ac 11136000 mm^2
Asl 108131 mm^2 N/Ac 2.030325579 ok
P1 0.00971
K 1.33903 ok 0.2fcd 3.12
Vrdc 8713.1 kN
Vmin 3164.54 kN Vrdc ok

Shear force is less than shear capacity of concrete hence no shear RF required

26
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Design of Pile Foundation - Base Pressure

No. of piles = 12 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
10.8
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = 0.15 m -4.5, 6.75 0, 6.75 4.5, 6.75
Pile diameter = 1.5 m
Area of pile = 1.767 m2
Pier Size = 1.8 X 6.40 15.3 MT
-4.5, 2.25 0, 2.25 4.5, 2.25
3
Unit Weight of R.C.C = 2.5 t/m B B
Self weight of Pile cap = 929 t
Total Length L1+Lf (Max scour) = 13.9 m
-4.5, -2.25 0, -2.25 4.5, -2.25
Length of pile = 22.0 m
Reduction factor for pile B.M = 0.90 (IS 2911 part 1, sec iv, fig 5)

Loads on Pile -4.5, -6.75 0, -6.75 4.5, -6.75


Normal-LWL Seismic & WInd - LWL
Maximum Pile Load = 279 t. OK 439 OK A
Minimum Pile Load = 171 t. OK -16 OK Max. horizontal load on pile ULS = 15 T OK
Normal-HFL Seismic - HFL .
Maximum Pile Load = 342 OK 502.25 OK
Minimum Pile Load = 231 OK 52 OK
Calculation of loads on piles for each load combination
ML x 4.5 ML ML = Moment along longitudinal direction
Load due to ML = =
1 x 162.0 36.0 MT = Moment along transverse direction
MT x 6.8 MT (REFER ANNEXURE VI)
Load due to MT = =
1 x 303.8 45.0 Normal Seismic
Type of Load case Sr no Pile capacity from soil investigation report = 500 t 625 t
Normal Load case 1 to 3 Maximum uplift Capacity of Pile = 150 t 187.5 t
Wind Load case 4 to 6 Lateral pile capacity from soil investigation report = 75 t
Seismic Transverse 7 to 12
Seismic Longitudinal 13 to 18
Seismic Vertical 19 to 24 ( self wt of pile excluded)

LWL -Case

Vertical Load due to Load due BM for pile


Load Max. load Min. load Resultant H
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) ML -P1 to MT -P1 =H(L1+Lf)/
no. (T) (T) (T)
(T) (T-m) (T-m) 2 (T-m)

1
2759 192 1475 117 0 230 41 4 275 185 10 61
N
o 2
r 2702 137 1556 117 0 225 43 3 271 179 10 61
m
a 3
l 2704 572 1488 117 0 225 41 13 279 171 10 61
4
2674 1077 1798 148 65 223 50 24 297 149 13 84
W
i 5
2617 602 1879 148 37 218 52 13 284 153 13 80
n
d 6
2619 1458 1811 148 65 218 50 32 301 136 13 84
7 2457 6134 3046 300 719 205 85 136 426 -16 65 406
8 2739 6165 2658 300 719 228 74 137 439 17 65 406
9 2447 6101 2674 300 715 204 74 136 414 -6 65 404
10 2727 6101 2674 300 715 227 74 136 437 17 65 404
11
2447 6174 2660 300 714 204 74 137 415 -7 65 403
12 2727 6174 2660 300 714 227 74 137 438 16 65 403
S 13 2460 1876 5501 721 216 205 153 42 399.47 10 63 392
e
14 2736 1876 5501 721 216 228 153 42 422.54 34 63 392
i
s 15 2448 1849 616 721 215 204 17 41 262.24 146 63 391
m 16 2725 1849 5517 721 215 227 153 41 421.44 33 63 391
i
17 2449 1932 5503 721 214 204 153 43 399.87 8 63 391
c
18 2725 1932 5503 721 214 227 153 43 422.93 31 63 391
19 2129 1876 3046 333 216 177 85 42 303.68 51 33 207
20 3068 1876 3046 333 216 256 85 42 381.93 129 33 207
21 2119 1849 3062 333 215 177 85 41 302.77 50 33 206
22 3054 1849 3062 333 215 254 85 41 380.63 128 33 206
23 2120 1932 3048 333 214 177 85 43 304.31 49 33 206
24 3054 1932 3048 333 214 254 85 43 382.08 127 33 206

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of 4800197-GGN-DD-013
NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Job No 4800197
state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL Case

Vertical Load due to Load due BM for pile


Load Max. load Min. load Resultant H
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) ML -P1 to MT -P1 =H(L1+Lf)/
no. (T) (T) (T)
(T) (T-m) (T-m) 2 (T-m)

N 1
o 3495 224 1512 127 11 291 42 5 338.19 244 11 66
r 2
m 3438 170 1592 127 11 286 44 4 334.48 238 11 66
a
3
l 3439 605 1524 127 11 287 42 13 342.40 231 11 66
4 3409 1110 1835 158 76 284 51 25 359.74 208 15 91
W
5
i 3352 635 1915 158 49 279 53 14 346.67 212 14 86
n
6
d 3354 1491 1847 158 76 280 51 33 363.96 195 15 91
7 3192 6174 2695 310 730 266 75 137 478.09 54 66 413
8 3474 6204 2695 310 730 290 75 138 502.25 77 66 413
9 3182 6140 2711 310 726 265 75 136 476.90 53 66 411
10 3462 6140 2711 310 726 289 75 136 500.26 77 66 411
11 3182 6213 2698 310 726 265 75 138 478.20 52 66 411
12 3462 6213 2698 310 726 289 75 138 501.53 76 66 411
S 13 3195 1910 5544 730 226 266 154 42 462.68 70 64 398
e 14 3472 1910 5544 730 226 289 154 42 485.75 93 64 398
i
15 3183 1883 659 730 225 265 18 42 325.45 205 64 398
s
m 16 3460 1883 5560 730 225 288 154 42 484.65 92 64 398
i 17 3184 1966 5546 730 225 265 154 44 463.07 68 64 398
c
18 3461 1966 5546 730 225 288 154 44 486.14 91 64 398
19 2864 1910 3083 342 226 239 86 42 366.73 111 34 214
20 3803 1910 3083 342 226 317 86 42 444.98 189 34 214
21 2855 1883 3099 342 225 238 86 42 365.83 110 34 213
22 3789 1883 3099 342 225 316 86 42 443.69 188 34 213
23 2856 1966 3085 342 225 238 86 44 367.37 109 34 213
24 3789 1966 3085 342 225 316 86 44 445.14 186 34 213

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Design of Pile Foundation - SLS

No. of piles = 12 ###


Eccentricity between
0
Column and C.G of Pile = m

Minimum Thickness of
0.85
Pile cap = 2.25 m 6.75 6.75 6.75
Thickness of pile cap = 2.25 m
Pile offset from edge = 0.15 m
Pile diameter = 1.5 m
Area of pile = 2 2.25 2.25 2.25
1.767 m
Pier Size = 1.8 X 6.40

Unit Weight of R.C.C = 2.5 t/m 3


-2.25 -2.25 -2.25
Self weight of Pile cap = 929.5 t 15.3
Total Length L1+Lf = 13.9 m

Length of pile = 22.0 m -6.75 -6.75 -6.75


Reduction factor for pile B.M= 0.90 (IS 2911 part 1, sec iv, fig 5)

Loads on Pile
Normal HFL
Maximum Pile Load = 328 t. 395
Minimum Pile Load = 182 t. 245 .

Calculation of loads on piles for each load combination Max. horizontal load on pile = 12.81 T

ML x 4.5 ML ML = Moment along longitudinal direction


Load due to ML = =
1 x 162.0 36.0 MT = Moment along transverse direction
MT 6.8 x MT (REFER ANNEXURE VI)
Load due to MT = =
1 303.8 x 45.0 Pile capacity from soil investigation report 500 t
Type of Load case Sr no Maximum uplift Capacity of Pile = 150 t
Normal Load case-rare 1 to 3 Lateral pile capacity from soil investigation reporty 75 t
Wind Load case -rare 4 to 6
Normal Load case-frequent 7 to 9
Wind Load case -frquent 10 to 12
Quasi Permanent 13 ( self wt of pile excluded)

LWL - Case

Vertical Load due Load due BM for pile


Load Max. Resultant
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) to ML -P1 to MT -P1 Min. load (T) =H(L1+Lf)/
no. load (T) H (T)
(T) (T-m) (T-m) 2 (T-m)

1 3135 723 1669 136 39 261 46 16 324 199 12 74


2 3078 416 1750 136 22 257 49 9 314 199 11 72
3 3080 1104 1681 136 39 257 47 25 328 185 12 74
4 3051 1029 1430 119 65 254 40 23 317 192 11 71
5 3008 567 1490 119 37 251 41 13 305 197 10 65
6 3009 1315 1439 119 65 251 40 29 320 182 11 71
7 3093 587 1268 103 33 258 35 13 306 210 9 56
8 3051 335 1328 103 19 254 37 7 299 210 9 55
9 3052 872 1277 103 33 254 35 19 309 199 9 56
10 2974 570 489 42 39 248 14 13 274 222 5 30
11
2962 306 505 42 22 247 14 7 268 226 4 25
12 2963 646 491 42 39 247 14 14 275 219 5 30
13 2985 0 0 0 0 249 0 0 249 249 0 0

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No 4800197
Salsalabari section in the state of West Bengal Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
HFL - Case
Vertical Load due Load due BM for pile
Load Max. Resultant
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) to ML -P1 to MT -P1 Min. load (T) =H(L1+Lf)/
no. load (T) H (T)
(T) (T-m) (T-m) 2 (T-m)
1 3921 756 1706 145 50 327 47 17 391 263 13 80
2 3864 449 1786 145 34 322 50 10 382 262 12 78
3 3866 1137 1718 145 50 322 48 25 395 249 13 80
4 3836 1062 1466 128 76 320 41 24 384 255 12 78
5 3794 600 1526 128 49 316 42 13 372 260 11 72
6 3795 1348 1475 128 76 316 41 30 387 245 12 78
7 3879 619 1304 113 44 323 36 14 373 273 10 63
8 3836 368 1365 113 30 320 38 8 366 274 10 61
9 3838 905 1314 113 44 320 36 20 376 263 10 63
10 3760 603 525 52 50 313 15 13 341 285 6 38
11 3748 339 541 52 34 312 15 8 335 290 5 32
12 3749 679 528 52 50 312 15 15 342 283 6 38
13 3770 0 0 0 0 314 0 0 314 314 0 0

..1 Calculation of depth of fixity and maximum moment in pile for Maximum scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.

dia = Diameter of the pile = 1.500 m


T = (E * I / K1)^0.2
where
E = Youngs Modulus of the concrete in kg/cm 2 = 32000000 kn/m^2
I = Moment of Inertia of the pile cross section in cm=4 0.2485049 m^4
K1 = Modulus of subgrade reaction as per Table 1 = 7700 kn/m^3
Q = Resultant horizontal force on pile - NORMAL = t
CASE (MAX) 12.8123
= Resultant horizontal force on pile - SEISMIC = 9.0 t

T = (32000000 * 0.248504887637474 / 7700) ^ 0.2 )= 4.0 m

L1 = Free length of pile above ground level = 5.4 m


= 5.4 m
L1 / T = 5.4 / 4.0 = 1.3
Lf / T = (fig 2 - for fixed headed piles in sands ) = 2.1

Lf = 2.1 * 4.0 = 8.5 m


= 8.5 m
Y = Q * (L1 + Lf)3 / (12[pile
* E head
* I) deflection of equivalent cantilever for fixed head pile]

= 0.0036 m
3.6 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]

M = m * MF [actual maximum moment]


where
m = reduction factor [for fixed head pile] 0.90

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation 4800197-GGN-DD-013


by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Job No 4800197 Date
Ghoshpukur-Salsalabari section in the state of West Bengal
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Pile Desgin-SLS

LWL - Case HFL - Case


S.no P ML MT HL HT S.no P ML MT HL HT
1 -1988 736 0 118 0 1 -2626 801 0 128 0
2 -1987 717 0 115 0 2 -2624 777 0 124 0
3 -1854 736 0 118 0 3 -2492 801 0 128 0
4 -1916 706 0 113 0 4 -2554 778 0 125 0
5 -1967 649 0 104 0 5 -2604 715 0 114 0
6 -1816 706 0 113 0 6 -2453 778 0 125 0
7 -2487 0 0 0 0 7 -3142 0 0 0 0

Pile design
SLS - Stress check

stress Limit
Compressive stress 2.5 Mpa 16.8 Mpa OK
Stress in steel 8.8 Mpa 440 Mpa OK
Result of critical case - SLS rare

Limit
Crack width 0 mm 0.3 mm OK
section is uncracked

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Design of Pile Foundation-ULS
10.8
No. of piles = 12
Eccentricity between Column
0
and C.G of Pile group = m
6.75 6.75 6.75 0.85
Minimum Thickness of Pile
cap = 2.25 m
Thickness of pile cap = 2.25 m OK
Pile offset from edge = m 2.25 2.25 2.25
0.15
Pile diameter = 1.5 m
Area of pile = 2 15.3
1.767 m
Pier Size = 1.8 X 6.40 -2.25 -2.25 -2.25

Unit Weight of R.C.C = 2.5 t/m 3

Self weight of Pile cap = 929.5 t


Scouring length of Pile Max scour HFL-S LWL-S -6.75 -6.75 -6.75
Total Length L1+Lf = 13.9 m 12.5 m 11.2 m
Length of pile = 22.0 m
Reduction factor for pile B.M = 0.90 (IS 2911 part 1, sec iv, fig 5)
Calculation of loads on piles for each load combination

ML x 4.5 ML ML = Moment along longitudinal direction


Load due to ML = =
1 x 162.0 36.0 MT = Moment along transverse direction
MT x 6.8 MT
Load due to MT = =
1 x 303.8 45.0
Type of Load case Sr no
Normal Load case 1 to 3
Wind Load case 4 to 6
Trans seismic Load case 7 to 12
Long seismic Load case 13 to 18
Vertical seismic load case 19 to 24
Accidental Load case 25 to 30
( self wt of pile excluded)
LWL- Case
Vertical Load due Load due to BM for pile
Load HT Max. Min. load Resultant
load P MT (T-m) ML (T-m) HL (T) P/n (T) to ML -P1 MT -P1 =H(L1+Lf)/2
no. (T) load (T) (T) H (T)
(T) (T-m) (T-m) (T-m)
1 4299 1084 2504 204 59 358 70 24 452 265 18 110
2 4214 624 2625 204 34 351 73 14 438 264 17 107
3 4217 1655 2522 204 59 351 70 37 458 245 18 110
4 4177 1549 1863 154 98 348 52 34 434 262 15 95
5 4112 855 2274 181 56 343 63 19 425 261 16 99

6 4114 1987 2195 181 98 343 61 44 448 238 17 107


7 3506 9222 2680 337 1071 292 74 205 572 13 94 584
8 3928 9222 2680 337 1071 327 74 205 607 48 94 584
9 3495 9130 2696 337 1065 291 75 203 569 13 93 582
10 3916 9130 2696 337 1065 326 75 203 604 49 93 582

11 3496 9197 2683 337 1064 291 75 204 570 12 93 581


12 3916 9197 2683 337 1064 326 75 204 605 47 93 581

13 3509 2793 8228 1067 321 292 229 62 583 2 93 580

14 3925 2793 8228 1067 321 327 229 62 618 36 93 580


15 3498 2758 8244 1067 320 291 229 61 582 1 93 580
16 3913 2758 8244 1067 320 326 229 61 616 36 93 580

17 292 229 63 583 0 93 580


3498 2839 8231 1067 319
18 326 229 63 618 34 93 580
3914 2839 8231 1067 319
19 3013 2793 2758 337 321 251 77 62 390 112 39 242
20 4421 2793 2758 337 321 368 77 62 507 230 39 242
21 3005 2758 2774 337 320 250 77 61 389 112 39 242
22 4406 2758 2774 337 320 367 77 61 506 229 39 242
23 3006 2839 2760 337 319 251 77 63 390 111 39 242
24 4406 2839 2760 337 319 367 77 63 507 227 39 242

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-013
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

HFL - Case
1 5363 1117 2540 213 70 447 71 25 542 352 19 117
2 5278 657 2661 213 45 440 74 15 528 351 18 113
3 5281 1688 2559 213 70 440 71 38 549 331 19 117
4 5241 1582 1900 164 109 437 53 35 525 349 16 102
5 5176 888 2310 191 67 431 64 20 515 347 17 105

6 5178 2019 2232 191 109 432 62 45 538 325 18 114


7 4519 9261 2718 346 1082 377 75 206 658 95 95 591
8 4942 9261 2718 346 1082 412 75 206 693 131 95 591
9 4509 9170 2734 346 1077 376 76 204 655 96 94 589
10 4929 9170 2734 346 1077 411 76 204 690 131 94 589
11 4509 9236 2720 346 1076 376 76 205 657 95 94 588
12 4929 9236 2720 346 1076 411 76 205 692 130 94 588
13 4523 2827 8271 1076 332 377 230 63 669 84 94 586
14 4938 2827 8271 1076 332 411 230 63 704 119 94 586
15 4511 2792 8287 1076 330 376 230 62 668 84 94 586
16 4927 2792 8287 1076 330 411 230 62 703 118 94 586
17 4512 2873 8273 1076 330 376 230 64 670 82 94 586
18 4927 2873 8273 1076 330 411 230 64 704 117 94 586
19 4026 2827 2795 346 332 336 78 63 476 195 40 250
20 5435 2827 2795 346 332 453 78 63 593 312 40 250
21 4018 2792 2811 346 330 335 78 62 475 195 40 249
22 5420 2792 2811 346 330 452 78 62 592 311 40 249
23 4019 2873 2798 346 330 335 78 64 477 193 40 249
24 5419 2873 2798 346 330 452 78 64 593 310 40 249

Load case No:7 to 24 seismic load combination is taken as 1.35 times the forces transmitted to it by substructure as per Cl.219.8 of IRC : 6-2017
Calculation of depth of fixity and maximum moment in pile for HFL scour

The depth of fixity and bending moments in the pile have been worked out as per

IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Max scour
dia = Diameter of the pile = 1.500 m

T = (E * I / K1)^0.2
where
E = Youngs Modulus of the concrete in kg/cm2 = 32000000 kn/m^2
I = Moment of Inertia of the pile cross section in =cm 4 0.2485049 m^4
K1 = Modulus of subgrade reaction as per Table 1= 7700 kn/m^3
Q = Resultant horizontal force on pile - =
NORMAL CASE (MAX) 18.7 t
= Resultant horizontal force on pile - =
SEISMIC 94.7 t

T = (32000000 * 0.248504887637474 / 7700) ^ 0.2


= ) 4.0 m
HFL-S scour LWL-S- Scour
L1 = Free length of pile above ground level = 5.4 m 4.047 m 2.709 m
= 5.4 m 4.0 m 2.7 m
L1 / T = 5.4 / 4.0 = 1.3 1.01 0.676
Lf / T = (fig 2 - for fixed headed piles in sands ) = 2.1 2.1 2.1

Lf = 2.1 * 4.0 = 8.5 m 8.5 m 8.5 m


= 8.5 m 8.5 m 8.5 m

Y = Q * (L1 + Lf)3 / (12 * [pile


E * I)head deflection of equivalent cantilever for fixed head pile]
= 0.0052 m
5.2 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]

M = m * MF [actual maximum moment]


where
m = reduction factor [for fixed head pile] 0.90

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee

Pile Desgin- ULS

LWL - Case HFL - Case


S.no P ML MT HT HL S.no P ML MT HT HL
1 -2646 1104 0 0 177 1 -3515 1168 0 0 187
2 -2644 1075 0 0 172 2 -3513 1134 0 0 182
3 -2445 1104 0 0 177 3 -3315 1168 0 0 187
4 -2619 951 0 0 152 4 -3489 1025 0 0 164
5 -2605 988 0 0 158 5 -3474 1054 0 0 169
6 -2377 1072 0 0 172 6 -3246 1144 0 0 183
7 -128 5844 0 0 935 7 -953 5915 0 0 947
8 -480 5844 0 0 935 8 -1305 5915 0 0 947
9 -135 5819 0 0 931 9 -960 5889 0 0 943
10 -485 5819 0 0 931 10 -1311 5889 0 0 943
11 -124 5812 0 0 930 11 -950 5883 0 0 941
12 -474 5812 0 0 930 12 -1300 5883 0 0 941
13 -18 5800 0 0 928 13 -843 5865 0 0 939
14 -364 5800 0 0 928 14 -1189 5865 0 0 939
15 -12 5798 0 0 928 15 -837 5863 0 0 938
16 -358 5798 0 0 928 16 -1183 5863 0 0 938
17 2 5797 0 0 928 17 -823 5862 0 0 938
18 -344 5797 0 0 928 18 -1169 5862 0 0 938
19 -1124 2423 0 0 388 19 -1950 2496 0 0 400
20 -2298 2423 0 0 388 20 -3124 2496 0 0 400
21 -1120 2418 0 0 387 21 -1947 2491 0 0 399
22 -2288 2418 0 0 387 22 -3115 2491 0 0 399
23 -1107 2416 0 0 387 23 -1934 2489 0 0 398
24 -2274 2416 0 0 387 24 -3100 2489 0 0 398

Design of Pile section Fagus - ULS

Cross - section

Reinforcement details
Main steel Shear RF
no. of bar 24 no. of bar 24 dia 16 mm
dia 32 mm dia 25 mm spacing 150 mm
Total Asr 19302 mm^2 Total Asr 11780.97 mm^2
% of r/f 1.76 %

Pier_P7_9.6m_12piles
LOUIS BERGER Document no.

4800197-GGN-DD-013
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No 4800197 Date

Designed by: Checked by


Design of Pier P7 for Ch: 123+518.5 29-11-2019
Akshit S.Chatterjee
Reinforcement details

Section check

UR 0.91 OK

Pier_P7_9.6m_12piles
Annexure - I
General
Ductile detailing shall be carried out for bridges located in zones III,IV and V of
seismic zone map of IRC:6

For Pier bottom level:


NEd = 30381 kN
Ac = 1.2E+07 mm2
As = 108131 mm2
fck = 35 N/mm2 fy = 550 N/mm2
hk = 0.075 < 0.08

Minimum confining reinforcement required

fyd = 478 N/mm2 fcd = 16 N/mm2

Confining reinforcement ratio wwd = rwfyd/fcd

6250 mm
B core dimension (along trans dimension)
1650 mm
D core dimension (along longitudinal dimension)
Dia. Of stirrup along B f = 12 mm
no. of legs along width (along trans dimension) = 27
Area of the stirupps and ties Asp = 3054 mm2
Dia. Of stirrup along D f = 10 mm
no. of legs along Depth (along long dimension) = 10
Area of the stirupps and ties Asp = 785 mm2
2
Confined area = 10312500 mm

100 mm
Spacing of hoops or ties SL =

Minimum Spacing is 200 Ref Fig 17.2 of Code

Volumetric ratio Pw, B (along trans dimension) = 0.004885805

Volumetric ratio Pw, D (along long dimension) = 0.004759989


ωwd
B = 0.149468399 min 0.12
ωwd
D = 0.145619387 min 0.12

Area of gross concrete section Ac = 11520000 mm2

Confined concrete area within the outside


dia of hoop ACC
10312500 mm2
=
Normalised axial force hk = 0.0753

reinforcement ratio rL = 0.0094


ww req = 0.029
Minimum design confining ωwd
= 0.120
reinforcement
O.K

Extent of confining reinforcement

Since nk < 0.3, Length of confinment = 1.8256 m


Refer:- IRC:112-2011 Cl 17.2.1.4

Confinement RF
DESIGN OF PILE CAP FOR PIER-P7
INPUT AND
LOAD CALCULATIONS
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Layout of Pile cap


LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

ULS CONDITION

SUMMARY OF PILE LOADS


(Refer Design document- 4800197-GGN-DD-040 for Pier, ULS design summary)

LOAD CASE V (T) MT (T-m) ML (T-m)


Group I (Case-1) 4299 1084 2504
Group I (Case-2) 4214 624 2625
Group I (Case-3) 4217 1655 2522
Group II(Case-1) Wind Load 4177 1549 1863
Group II(Case-2) Wind Load 4112 855 2274
Group II(Case-3) Wind Load 4114 1987 2195
Group III (Case-1A) Seismic Transverse(-
V) 3506 9222 2680
Group III (Case-1B) Seismic
Transverse(+V) 3928 9222 2680
Group III (Case-2A) Seismic Transverse (-
V) 3495 9130 2696
Group III (Case-2B) Seismic Transverse
(+V) 3916 9130 2696
Group III (Case-3A) Seismic Transverse(-
V) 3496 9197 2683
Group III (Case-3B) Seismic
Transverse(+V) 3916 9197 2683
LWL
Group IV (Case-1A) Seismic CASE
Longitudinal(-V) 3509 2793 8228
Group IV (Case-1B) Seismic
Longitudinal(+V) 3925 2793 8228
Group IV (Case-2A) Seismic
Longitudinal(-V) 3498 2758 8244
Group IV (Case-2B) Seismic
Longitudinal(+V) 3913 2758 8244
Group IV (Case-3A) Seismic
Longitudinal(-V) 3498 2839 8231
Group IV (Case-3B) Seismic
Longitudinal(+V) 3914 2839 8231
Group V (Case-1A) Seismic Vertical(-V) 3013 2793 2758
Group V (Case-1B) Seismic Vertical(+V) 4421 2793 2758

Group V (Case-2A) Seismic Vertical(-V)


3005 2758 2774
Group V (Case-2B) Seismic Vertical(+V) 4406 2758 2774
Group V (Case-3A) Seismic Vertical(-V) 3006 2839 2760
Group V (Case-3B) Seismic Vertical(+V) 4406 2839 2760
Group I (Case-1) 5363 1117 2540
Group I (Case-2) 5278 657 2661
Group I (Case-3) 5281 1688 2559
Group II(Case-1) Wind Load 5241 1582 1900
Group II(Case-2) Wind Load HFL
5176 888 2310
CASE
Group II(Case-3) Wind Load 5178 2019 2232
Group III (Case-1A) Seismic Transverse(-
V) 4519 9261 2718
Group III (Case-1B) Seismic
Transverse(+V) 4942 9261 2718
Group III (Case-2A) Seismic Transverse (-
V) 4509 9170 2734
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Group III (Case-2B) Seismic Transverse ULS CONDITION


(+V) 4929 9170 2734
Group III (Case-3A) Seismic Transverse(-
V) 4509 9236 2720
Group III (Case-3B) Seismic
Transverse(+V) 4929 9236 2720
Group IV (Case-1A) Seismic
Longitudinal(-V) 4523 2827 8271
Group IV (Case-1B) Seismic
Longitudinal(+V) 4938 2827 8271
Group IV (Case-2A) Seismic
Longitudinal(-V) 4511 2792 8287
Group IV (Case-2B) Seismic
Longitudinal(+V) 4927 2792 8287 HFL
Group IV (Case-3A) Seismic CASE
Longitudinal(-V) 4512 2873 8273
Group IV (Case-3B) Seismic
Longitudinal(+V) 4927 2873 8273
Group V (Case-1A) Seismic Vertical(-V) 4026 2827 2795
Group V (Case-1B) Seismic Vertical(+V) 5435 2827 2795
Group V (Case-2A) Seismic Vertical(-V) 4018 2792 2811
Group V (Case-2B) Seismic Vertical(+V) 5420 2792 2811
Group V (Case-3A) Seismic Vertical(-V) 4019 2873 2798
Group V (Case-3B) Seismic Vertical(+V) 5419 2873 2798

No. of piles = 12
Size of Pile cap = 10.8 x 15.3

SECTION MODULUS
PILE 1 2 3 4
ZT 45 135 -135 -45
ZL 36 36 36 36

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN LONGITUDINAL DIRECTION:

LOAD CASE 1 2 3 4 TOTAL

Group I (Case-1)
452 436 420 404 1711

Group I (Case-2)
438 429 419 410 1696

Group I (Case-3)
458 434 409 385 1686

Group II(Case-1) Wind Load


434 411 388 365 1600

Group II(Case-2) Wind Load


425 412 399 387 1623

Group II(Case-3) Wind Load LWL CASE


448 419 389 360 1615
Group III (Case-1A) Seismic Transverse(-
V) 572 435 298 162 1466
Group III (Case-1B) Seismic
Transverse(+V) 607 470 334 197 1607
Group III (Case-2A) Seismic Transverse (-
V) 569 434 299 163 1465
Group III (Case-2B) Seismic Transverse
(+V) 604 469 334 198 1605
Group III (Case-3A) Seismic Transverse(-
V) 570 434 298 161 1463
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Group III (Case-3B) Seismic ULS CONDITION


Transverse(+V) 605 469 333 196 1603
Group IV (Case-1A) Seismic
Longitudinal(-V) 583 542 500 459 2084
Group IV (Case-1B) Seismic
Longitudinal(+V) 618 576 535 494 2222
Group IV (Case-2A) Seismic
Longitudinal(-V) 582 541 500 459 2082
Group IV (Case-2B) Seismic
Longitudinal(+V) 616 576 535 494 2220
Group IV (Case-3A) Seismic
Longitudinal(-V) 583 541 499 457 2081
Group IV (Case-3B) Seismic
LWL CASE
Longitudinal(+V) 618 576 534 492 2219

Group V (Case-1A) Seismic Vertical(-V)


390 348 307 266 1311

Group V (Case-1B) Seismic Vertical(+V)


507 466 424 383 1780

Group V (Case-2A) Seismic Vertical(-V)


389 348 307 266 1310

Group V (Case-2B) Seismic Vertical(+V)


506 465 424 383 1777

Group V (Case-3A) Seismic Vertical(-V)


390 348 306 264 1309

Group V (Case-3B) Seismic Vertical(+V) 507 465 423 381 1775

Group I (Case-1) 542 526 509 493 2070

Group I (Case-2) 528 519 509 499 2055

Group I (Case-3) 549 524 499 474 2044

Group II(Case-1) Wind Load 525 501 478 454 1958

Group II(Case-2) Wind Load 515 502 489 476 1982

Group II(Case-3) Wind Load 538 508 479 449 1974


Group III (Case-1A) Seismic Transverse(-
V) 658 521 383 246 1808
Group III (Case-1B) Seismic
Transverse(+V) 693 556 419 281 1949
Group III (Case-2A) Seismic Transverse (-
V) 655 520 384 248 1807
Group III (Case-2B) Seismic Transverse
(+V) 690 555 419 283 1947
Group III (Case-3A) Seismic Transverse(-
HFL CASE
V) 657 520 383 246 1805
Group III (Case-3B) Seismic
Transverse(+V) 692 555 418 281 1945
Group IV (Case-1A) Seismic
Longitudinal(-V) 669 628 586 544 2427
Group IV (Case-1B) Seismic
Longitudinal(+V) 704 662 620 578 2565
Group IV (Case-2A) Seismic
Longitudinal(-V) 668 627 585 544 2425
Group IV (Case-2B) Seismic
Longitudinal(+V) 703 661 620 579 2563
Group IV (Case-3A) Seismic
Longitudinal(-V) 670 627 585 542 2423
Group IV (Case-3B) Seismic
Longitudinal(+V) 704 662 619 577 2562

Group V (Case-1A) Seismic Vertical(-V) 476 434 392 350 1653

Group V (Case-1B) Seismic Vertical(+V) 593 551 510 468 2122

Group V (Case-2A) Seismic Vertical(-V) 475 434 392 351 1652


LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

ULS CONDITION
Group V (Case-2B) Seismic Vertical(+V) 592 550 509 468 2119

Group V (Case-3A) Seismic Vertical(-V) HFL CASE


477 434 391 349 1651

Group V (Case-3B) Seismic Vertical(+V) 593 551 508 465 2117

Longitudinal direction:-

MAXIMUM SHEAR = 2565 t


LEVER ARM = 3.60 m
MOMENT = 9234 tm
Density of concrete = 2.50 t/m3
Density of soil = 1.8 t/m3
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap = 387.28 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 871.38 tm
Net moment = 8362.52 tm

Shear check at face of pile

Maximum shear at face of pile = 2565 t


Downward Weight due to pile cap = 387.28 t
Net shear = 2178 t
av = 3.60 m
deff = 2.16 m
0.5deff = 1.081 m
2deff = 4.325 m
β = av/2d
= 0.83
Reduced shear = 1812.65 t

Transverse direction:-

SECTION MODULUS

PILE 1 5 9

ZT 45 45 45

ZL 36 1.00E+09 -36

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN TRANSVERSE DIRECTION:

LOAD CASE 1 5 9 TOTAL

Group I (Case-1)
452 382 313 1147

Group I (Case-2)
438 365 292 1095

Group I (Case-3)
458 388 318 1164
LWL
Group II(Case-1) Wind Load
434 383 331 1148 CASE

Group II(Case-2) Wind Load


425 362 298 1085

Group II(Case-3) Wind Load


448 387 326 1161
Group III (Case-1A) Seismic Transverse(-
V) 572 497 423 1491
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Group III (Case-1B) Seismic ULS CONDITION


Transverse(+V) 607 532 458 1597
Group III (Case-2A) Seismic Transverse (-
V) 569 494 419 1483
Group III (Case-2B) Seismic Transverse
(+V) 604 529 454 1588
Group III (Case-3A) Seismic Transverse(-
V) 570 496 421 1487
Group III (Case-3B) Seismic
Transverse(+V) 605 531 456 1592
Group IV (Case-1A) Seismic
Longitudinal(-V) 583 355 126 1064
Group IV (Case-1B) Seismic
Longitudinal(+V) 618 389 161 1167
Group IV (Case-2A) Seismic
Longitudinal(-V) 582 353 124 1058
Group IV (Case-2B) Seismic LWL
Longitudinal(+V) 616 387 158 1162 CASE
Group IV (Case-3A) Seismic
Longitudinal(-V) 583 355 126 1064
Group IV (Case-3B) Seismic
Longitudinal(+V) 618 389 161 1168

Group V (Case-1A) Seismic Vertical(-V)


390 313 237 939

Group V (Case-1B) Seismic Vertical(+V)


507 431 354 1292

Group V (Case-2A) Seismic Vertical(-V)


389 312 235 935

Group V (Case-2B) Seismic Vertical(+V)


506 428 351 1285

Group V (Case-3A) Seismic Vertical(-V)


390 314 237 941

Group V (Case-3B) Seismic Vertical(+V)


507 430 354 1291

Group I (Case-1)
542 472 401 1415

Group I (Case-2)
528 454 380 1363

Group I (Case-3)
549 478 406 1433

Group II(Case-1) Wind Load


525 472 419 1416

Group II(Case-2) Wind Load


515 451 387 1353

Group II(Case-3) Wind Load


538 476 414 1429
Group III (Case-1A) Seismic Transverse(-
V) 658 582 507 1747
Group III (Case-1B) Seismic
Transverse(+V) 693 618 542 1853 HFL
Group III (Case-2A) Seismic Transverse (- CASE
V) 655 579 504 1738
Group III (Case-2B) Seismic Transverse
(+V) 690 615 539 1844
Group III (Case-3A) Seismic Transverse(-
V) 657 581 505 1743
Group III (Case-3B) Seismic
Transverse(+V) 692 616 540 1848
Group IV (Case-1A) Seismic
Longitudinal(-V) 669 440 210 1319
Group IV (Case-1B) Seismic
Longitudinal(+V) 704 474 245 1423
Group IV (Case-2A) Seismic
Longitudinal(-V) 668 438 208 1314
Group IV (Case-2B) Seismic
Longitudinal(+V) 703 473 242 1418
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Group IV (Case-3A) Seismic ULS CONDITION


Longitudinal(-V) 670 440 210 1319
Group IV (Case-3B) Seismic
Longitudinal(+V) 704 474 245 1423

Group V (Case-1A) Seismic Vertical(-V)


476 398 321 1195

Group V (Case-1B) Seismic Vertical(+V)


593 516 438 1547 HFL
CASE
Group V (Case-2A) Seismic Vertical(-V)
475 397 319 1191

Group V (Case-2B) Seismic Vertical(+V)


592 514 436 1541

Group V (Case-3A) Seismic Vertical(-V)


477 399 321 1196

Group V (Case-3B) Seismic Vertical(+V)


593 515 438 1546

MAXIMUM SHEAR = 1853 t


LEVER ARM = 3.55 m
MOMENT = 6577 tm
Density of concrete = 2.50 t/m3
Density of soil = 1.8 t/m3
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap = 270.34 t
Lever arm = 2.23 m
Moment due to S.W. & Cushion = 601.50 tm
Net moment = 5975.90 tm

Shear check at face of pile

Maximum shear at face of pile = 1852.79 t


Downward Weight due to pile cap = 270.34 t
Net shear = 1582.45 t
av = 3.55 m
deff = 2.16 m
0.5deff = 1.081 m
2deff = 4.325 m
β = av/2d
= 0.82
Reduced shear = 1298.89 t
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

SLS CONDITION

SUMMARY OF PILE LOADS


(Refer Design document- 4800197-GGN-DD-xxx for Pier, SLS design summary)

LOAD CASE V (T) MT (T-m) ML (T-m)

Group I (Case-1 service-Rare)


3135 723 1669
Group I (Case-2 service-Rare)
3078 416 1750
Group I (Case-3 service-Rare)
3080 1104 1681
Group II (Case-1 wind load-Rare)
3051 1029 1430
Group II (Case-2 wind load-Rare)
3008 567 1490
Group II (Case-3 wind load-Rare)
3009 1315 1439
LWL CASE
Group III (Case-1 Service-Frequent)
3093 587 1268
Group III (Case-2 Service-Frequent)
3051 335 1328
Group III (Case-3 Service-Frequent)
3052 872 1277
Group IV (Case 1 Wind Load-Frequent)
2974 570 489
Group IV (Case 2 Wind Load-Frequent)
2962 306 505
Group IV (Case 3 Wind Load-Frequent) 2963 646 491

Group I (Case-1 service-Rare)


3921 756 1706
Group I (Case-2 service-Rare)
3864 449 1786
Group I (Case-3 service-Rare)
3866 1137 1718
Group II (Case-1 wind load-Rare)
3836 1062 1466
Group II (Case-2 wind load-Rare)
3794 600 1526
Group II (Case-3 wind load-Rare)
3795 1348 1475
HFL CASE
Group III (Case-1 Service-Frequent)
3879 619 1304
Group III (Case-2 Service-Frequent)
3836 368 1365
Group III (Case-3 Service-Frequent)
3838 905 1314
Group IV (Case 1 Wind Load-Frequent)
3760 603 525
Group IV (Case 2 Wind Load-Frequent)
3748 339 541
Group IV (Case 3 Wind Load-Frequent) 3749 679 528
Group V (Case-1- Quasi permanent) 2985 0 0 LWL CASE
Group V (Case-1- Quasi permanent) 3770 0 0 HFL CASE

No. of piles = 12

SECTION MODULUS
PILE 1 2 3 4
ZT 45 135 -135 -45
ZL 36 36 36 36

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN LONGITUDINAL DIRECTION:

LOAD CASE 1 2 3 4 TOTAL


Group I (Case-1 service-Rare) 324 313 302 292 1231
Group I (Case-2 service-Rare) 314 308 302 296 1220
Group I (Case-3 service-Rare) 328 312 295 279 1214
Group II (Case-1 wind load-Rare) 317 302 286 271 1176

LWL CASE
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Group II (Case-2 wind load-Rare) 305 SLS


296CONDITION
288 279 1168
Group II (Case-3 wind load-Rare) 320 300 281 262 1163
LWL CASE
Group III (Case-1 Service-Frequent) 306 297 289 280 1172
Group III (Case-2 Service-Frequent) 299 294 289 284 1164
Group III (Case-3 Service-Frequent) 309 296 283 270 1159
Group IV (Case 1 Wind Load-Frequent) 274 266 257 249 1046
Group IV (Case 2 Wind Load-Frequent) 268 263 259 254 1044
Group IV (Case 3 Wind Load-Frequent) 275 265 256 246 1042
Group I (Case-1 service-Rare) 391 380 369 357 1496
Group I (Case-2 service-Rare) 382 375 368 362 1486
Group I (Case-3 service-Rare) 395 378 361 345 1480
Group II (Case-1 wind load-Rare) 384 368 353 337 1442
Group II (Case-2 wind load-Rare) 372 363 354 345 1434
Group II (Case-3 wind load-Rare) 387 367 347 327 1429 HFL CASE
Group III (Case-1 Service-Frequent) 373 364 355 346 1438
Group III (Case-2 Service-Frequent) 366 360 355 349 1430
Group III (Case-3 Service-Frequent) 376 363 350 336 1425
Group IV (Case 1 Wind Load-Frequent) 341 332 323 315 1312
Group IV (Case 2 Wind Load-Frequent) 335 330 325 320 1310
Group IV (Case 3 Wind Load-Frequent) 342 332 322 312 1308

Longitudinal direction:-
MAXIMUM SHEAR = 1496.48 t
LEVER ARM = 3.60 m
MOMENT = 5387.35 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.8 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 387.28 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 871.38 tm
Net moment = 4515.96 tm

Transverse direction:-

SECTION MODULUS
PILE 1 5 9
ZT 45 45 45
ZL 36 1.00E+09 -36

SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN TRANSVERSE DIRECTION:


LOAD CASE 1 5 9 TOTAL
Group I (Case-1 service-Rare) 324 277 231 832
Group I (Case-2 service-Rare) 314 266 217 797
Group I (Case-3 service-Rare) 328 281 234 844
Group II (Case-1 wind load-Rare) 317 277 237 831
Group II (Case-2 wind load-Rare) 305 263 222 790
Group II (Case-3 wind load-Rare) 320 280 240 840 LWL
Group III (Case-1 Service-Frequent) 306 271 236 812 CASE
Group III (Case-2 Service-Frequent) 299 262 225 785
Group III (Case-3 Service-Frequent) 309 274 238 821
Group IV (Case 1 Wind Load-Frequent) 274 260 247 781
Group IV (Case 2 Wind Load-Frequent) 268 254 240 761
Group IV (Case 3 Wind Load-Frequent) 275 261 248 784
Group I (Case-1 service-Rare) 391 344 296 1031
Group I (Case-2 service-Rare) 382 332 282 996
Group I (Case-3 service-Rare) 395 347 300 1042
Group II (Case-1 wind load-Rare) 384 343 303 1030 HFL
Group II (Case-2 wind load-Rare) 372 329 287 988 CASE
Group II (Case-3 wind load-Rare) 387 346 305 1039
Group III (Case-1 Service-Frequent) 373 337 301 1011
Group III (Case-2 Service-Frequent) 366 328 290 984
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Group III (Case-3 Service-Frequent) 376 SLS


340CONDITION
303 1020
Group IV (Case 1 Wind Load-Frequent) 341 327 312 980 HFL
Group IV (Case 2 Wind Load-Frequent) 335 320 305 960 CASE
Group IV (Case 3 Wind Load-Frequent) 342 327 313 982

MAXIMUM SHEAR = 1042.24 t


LEVER ARM = 3.55 m
MOMENT = 3699.96 tm
3
Density of concrete = 2.50 t/m
3
Density of soil = 1.80 t/m
Depth of pile cap = 2.25 m
Depth of cushion = 0.00 m
Downward Weight due to pile cap and cushion = 270.34 t
Lever arm = 2.23 m
Moment due to S.W. & Cushion = 601.50 tm
Net moment = 3098.46 tm

CRACK WIDTH
V = 3770 t
Max Load on a Pile= 314 t
Long. Dir
Downward Weight due to pile cap = 387.28 t
Lever arm = 2.25 m
Moment due to S.W. & Cushion = 871 tm
Net B.M in Long. Dir = 3653 t-m

Trans. Dir
Downward Weight due to pile cap = 270.34 t
Lever arm = 2.23 m
Moment due to S.W. & Cushion = 602 tm
Net B.M in Long. Dir = 2745 t-m
ULS CHECK
LOUIS BERGER Document no.

Job No 4800197 4800197-GGN-DD-013


Detailed Engineering in Connection with Rehabilitation and Up-Gradation to
Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of
Ghoshpukur-Salsalabari section in the State of West Bengal on EPC mode
Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

Long. Dir Trans. Dir


beff for cantiliver slab = 1.2a+b1
a = 3.6 3.55 m
b1 = 1.5 1.5 m
beff = 5.82 5.76 m
Hence it overlaps =
beff modified = 3.81 3.78 m
Max. Shear = 704.24 704.24 t
Load/m = 184.84 186.31 t/m
ULS Moment = 665.42 661.39 tm/m

Material Specification:

Concrete grade M35


Characteristic Compressive Strength of Concrete, fck Mpa 35
Concrete material factor (Уm) 1.50
Design Compressive strength of Concrete, fcd Mpa 15.63
Tensile strength of concrete , fctm Mpa 2.80
Strain at reaching Characteistic Strength, ec2 0.0020
Ultimate Strain, ecu2 0.0035
Modulus of Elasticity of Concrete ( Ecm ) Gpa 32

Steel Grade Fe550


Yield Strength of Reinforcement, fy or fyk Mpa 550.00
Partial factor for steel (Уs) 1.15
Design Yield Strength of Reinforcement, fyd Mpa 478.261
Modulus of Elasticity of Steel ( Es) Gpa 200
Dry weight of Concrete KN/m³ 25
Permissible Crack Width mm 0.300
Maximum compressive stress in concrete under rare combination
fck 0.48
N/mm² 16.80
Maximum tensile stress in steel under rare combination fyk 0.6
N/mm² 330.00

STRENGTH CHECK

Pile cap
Pile cap
Sl No. Parameters Units Trans.
Long. Dir
Dir
1 MOMENT KN-M 6528 6488
2 SHEAR FORCE KN 1813 1828

MATERIAL DATA
3 Grade of Steel 550 550
4 Characteristic strength of reinf. (fyk) Mpa 550 550
5 Partial factor for steel (Уs) 1.15 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200 200
8 Grade of Concrete 35 35
9 Charecterstic comp. strength (fck) Mpa 35 35
10 α 0.67 0.67
11 Concrete material factor (Уm) 1.50 1.50
Design value for Concrete comp. strength (fcd =
12 Mpa 15.63 15.63
αfck/Уm)

Design of Pier Cap


Geometric Data
13 Width of slab(b) mm 1000 1000
14 depth of Member mm 2250 2250
15 Clear Cover mm 75 75
16 Dia of reinforcement mm 25 25
17 Spacing of bars mm 80 80
18 Dia of reinforcement mm 20 20
19 Spacing of bars mm 80 80
20 Area of reinforcement mm² 10058 10058
21 Reinforcement (Ast/bd) 0.0047 0.0047
22 Hence Pt= (100*Ast/bd) % 0.47 0.47
23 Dia of Shear Reinforcement links mm 8 8
24 Spacing of reinforcement in other direction mm 160 160
25 number of legs Nos. 6 6
26 Reinforcement(%)
As per Clause 16.5.1.1 of IRC:112-2014, Min. & Max Main
Reinforcement.
27 Min. Main Reinforcement mm² 2862 2763
28 Status O.K. O.K.
29 Max. Main Reinforcement mm² 56250 56250
30 Status O.K. O.K.

Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 2163 2125
32 Depth of NA from comp. flange (x) mm 385 385
33 λ 0.80 0.80
34 η 1.00 1.00
35 Depth of stress Block (λx) mm 308 308
36 Stress on stress Block (η fcd) MPa 15.63 15.63
37 Total comp. force (Fc = λxηfcdb) KN 4810 4810
38 Total tension Force (Fs = fyd At) KN 4810 4810
39 Diff (Fc-Fs) KN 0 0
40 Depth of Lever arm (z) = d-λx/2 mm 2009 1971
41 Moment of resistance (Fc*z) KN-m 9662 9482
42 UR for pure bending 0.68 0.68
43 Status O.K. O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 1081 1063
58 2d = mm 4325 4250
59 αv = m 3.600 3.550
60 β= 0.832 0.821
61 Design Shear force,Ved = kN 1509 1500
62 K = 1+sqrt(200/d)<=2 1.304 1.307
63 σcp MPa 0.000 0.000
64 ρ1=At/(bd)<=0.02 0.005 0.005
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.273 0.274
66 Concrete Shear Capacity Vrd.c =
KN 789 782
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 591 582
69 [Vmin+(0.15σcp)]bwd

70 Status (if 0 = reinf. Not reqd;or 1 = reinf reqd) 1. 1.


71 Design shear force (Ved) KN 1509 1500
72 Design yield strength. of shear reinf. (fywd=fyd) MPa 478.26 478.26
73 Cotθ 1.00 1.00
74 Required area of Shear reinforcement (Aws) mm²/mm 259 262
75 Nos 6 6
76 Provided area of Shear reinforcement (Aws) mm²/mm 302 302
77 shear capacity w/ vertical shear renf.(Vrd,s) KN 1755 1724
78 αcw 1.00 1.00
79 V1 0.53 0.60
80 Max. shear Capcity w/ vertical shear renf. (VRd,max) KN 8097 8970
81 Final shear Capcity (VRd) KN 1755 1724
82 UR for only shear= 0.86 0.87
83 Status O.K. O.K.

Design of Pier Cap


As per Clause 10.3.3.5 of IRC:112-2011, Minimum Shear
Reinforcement.
84 Min. Shear Reinforcement Asw min/s mm²/mm 0.6583 0.6583
85 Dia of reinforcement mm 8 8
86 Spacing of reinforcement mm 160 160
87 Area of reinforcement Asw/s provided mm² 1.88 1.88
88 Status O.K. O.K.

44 Effective As long for only Bending mm² 6795 6882


45 DFtd KN 754.66 750.08
46 As long for additional tensile RF from Shear force mm² 1577 1568
47 UR for combined shear + bending 0.83 0.84
48 Status O.K. O.K.
49 Max. strain on concrete in comp. 0.0035 1.0035
50 Max. strain on reinf. in tension 0.0044 0.0044
51 Max. depth of NA From Comp. Flange mm 959 2116
52 Status (under/Reinf, Over Reinf or Bal) U/R U/R
53 fctm MPa 2.80 0.00
54 Min. reinforcement mm² 2862 2763
55 Status O.K. O.K.

*Surface Reinforcement (Cl. 16.5.4 (4)-IRC:112-2011)


Minimum Surface Reinforcement (1% of Act,ext) mm2 750 750
Dia of Reinforcement (φ) mm 16 16
Spacing of Reinforcement (s) mm 160 160
Reinforcement Provided mm2/m 1257 1257

Design of Pier Cap


PUNCHING SHEAR CHECK
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning 4800197-GGN-DD-
Job No 4800197
of NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari 013
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Design of Pier P7 for Ch: 123+518.5 Akshit S.Chatterjee 29-11-2019

DESIGN FOR PUNCHING SHEAR IN PILE CAP AS PER IRC : 112 - 2011

3
Density of concrete 25 KN/m
3
Density of soil 18 KN/m
Characteristic Strength, fck 35 Mpa
Design Strength of concrete, fcd 15.63 Mpa
Net Applied Force, Ved 6909 KN
Net downward force within the control perimeter, DVEd 1605.8 KN
Overall depth of pile cap 2250 mm
Effective Depth of Pile Cap, d 2142.0 mm
Reinforcement Ratio, rl 0.0047
Distance between the edge of pile to the edge of pier 3.070 < 2d
VEd,red = VEd - DVEd 5302.75 KN
n = 0.6 x [1-fck/310] 0.532
Maximum Punching Shear Resistance , nRd.max = 0.5 x n x fcd 4.16 Mpa
0.5
K = 1 + (200/d) 1.31 ≤2
nmin = 0.031 x K1.5 x (fck)0.5 0.274 Mpa
Distance of control perimeter from column periphery, a 3.070 mm
2xd/a 1395.44
Perimeter along control line, p 7682.00 mm
2
Area enclosed by control line 18.23 m
nEd,red = VEd,red /(bd) 0.322 MPa
nmin x 2d/a 381.773 MPa
nRd = 0.12 x K x (80.r1.fck)0.333 x (2d/a) 515.410 MPa
HENCE, OK
SLS CHECK
LOUIS BERGER Document no.
4800197-GGN-DD-
Detailed Engineering in Connection with Rehabilitation and Up-Gradation Job No 4800197 013
to Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-
A) of Ghoshpukur-Salsalabari section in the State of West Bengal on EPC
mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

DESIGN OF foundation (SLS)

S.no. Refrence Unit Long Dir Long Dir

Load Data
1 Moment KN-m 44302 30396
Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Fe 550 Fe 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
Design value for concrete compressive strength (fcd=
11 αfck/γm) Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32

Geometric Data
13 Width of Slab/Beam (b) mm 15300 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 25
18 Effective depth of beam/Slab (d) mm 2163 2125
19 Spacing of Reinforcement (s) or mm 80 80
20 Number of Bar (n) Nos 191 135
21 Area of Reinforcement (At) mm2 93880 66268
22 Reinforcement (%) 0.273 0.273

Stress Check
23 Concrete Cross Sectional Area (AC) mm2 34425000 24300000
24 Perimeter in contact with atmosphere (u) mm 35100 26100
25 Notional Size (=2AC/u) mm 1962 1862
26 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.50 1.50
27 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112MPa 12800 12800
28 Modular ratio (m) 15.63 15.63
29 Allowable stress in Steel Cl 12.2.2,IRC 112MPa 330 330
30 Allowable stress in Concrete Cl 12.2.2,IRC 112MPa 16.80 16.80
31 Position of nuetral axis from comp. face (x) mm 555.2 549.6
32 MOA of Compression area mm2 2.36E+09 1.63E+09
33 MOA of Tension area mm2 2.36E+09 1.63E+09
34 Diff. mm2 0 0
35 MOI of cracked section mm4 4.66E+12 3.17E+12
36 Stress in tension reinf. MPa 238.640 236.215
UR 0.72 0.72
37 Status O.K. O.K.
38 Stress in concrete MPa 5.275 5.274
UR 0.31 0.31
39 Status O.K. O.K.
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

CRACK WIDTH CHECK

S.no. Refrence Unit Long Dir Trans Dir

Load Data
1 Moment KN-m 35838 2745

Material Data
2 Grade of Steel Fe 550 Fe 550
3 Charecterstic strength of reinforcement (fyk) Table 18.1,IRC 112MPa 550 550
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 478.26 478.26
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200 200
7 Grade of Concrete M35 M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35 35
9 α Cl 6.4.2.8,IRC 112 0.67 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50 1.50
11 Design value for concrete compressive strength (fcd= αfck/γm)
Cl 6.4.2.8,IRC 112 MPa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32 32

Geometric Data
13 Width of Slab/Beam (b) mm 15300 10800
14 Total depth of Slab/Beam (D) mm 2250 2250
15 Cover to Reinforcement mm 75 75
16 Dia of Reinforcement (φ) in first layer mm 25 25
17 Effective depth of beam/Slab (d) mm 2163 2125
18 Spacing of Reinforcement (s) or mm 80 80
19 Number of Bar (n) Nos 191 135
20 Area of Reinforcement (At) mm2 93880 66268
21 Reinforcement (%) 0.273 0.273

Stress Check
22 Concrete Cross Sectional Area (AC) mm2 34425000 24300000
23 Perimeter in contact with atmosphere (u) mm 35100 26100
24 Notional Size (=2AC/u) mm 1962 1862
25 Age at Loading days 28 28
26 Relative humidity Table 6.9 , IRC %
112 12800 12800
27 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 15.6 15.6
28 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112
MPa 1924.8 1924.8
29 Modular ratio (m) 103.906 103.906
30 Allowable stress in Steel Cl 12.2.2,IRC 112
MPa 440.0 440.0
31 Allowable stress in Concrete Cl 12.2.2,IRC 112
MPa 12.60 12.60
32 Position of nuetral axis from comp. face (x) mm 1141.2 1127.7
33 MOA of Compression area mm2 9.96E+09 6.87E+09
34 MOA of Tension area mm2 9.96E+09 6.87E+09
35 Diff. mm2 0.000 0.000
36 MOI of cracked section mm4 1.78E+13 1.20E+13
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier P7 for Ch: 123+518.5 29-11-2019

37 Stress in tension reinf. ssc MPa 214.210 23.681


38 Status O.K. O.K.
39 Stress in concrete MPa 2.304 0.258
40 Status O.K. O.K.

CALCULATION FOR CRACK WIDTH FOR BENDING As per 12.3.4 of IRC 112-2011
41 Wk = Sr,max (esm-ecm)
42 ae = Es/Ecm 6.25 6.25
43 depth hc,eff mm 218.8 312.5
44 Eff area of conc in tension surrounding reinf Ac,eff mm2 3346875 3375000
45 Rr,eff 0.0280 0.0196
46 fctm Mpa 2.800 2.800
47 fct,eff Mpa 2.800 2.800
48 kt 1.500 1.500
49 (esm-ecm)= {ssc - kt(fct,eff/Rr,eff)(1+aeRr,eff)}/Es 0.0002 -0.0011
50 0.6*ssc/Ec 0.0006 0.0001
51 (esm-ecm) 0.0006 0.0001
52 K1 0.80 0.80
53 K2 0.50 0.50
54 Minimum clear cover c 75.00 75.00
55 Srmax = 3.4c+0.425k1k2f/Rreff 407 471
56 Wk = Sr,max (esm-ecm) 0.261 0.033
57 Allowable crack width 0.300 1.300
58 UR 0.87 0.03
59 Status O.K. O.K.
DESIGN OF PIER CAP
INPUT AND
LOAD CALCULATIONS
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

Design of Pier Cap


The Wall Pier is rectangular in shape of dimension 1.8mx7m, with round corners 0.9m radius. The width of Pier Cap is 4.1m minimum in the
longitudinal direction. The pier cap is essentially subjected to bending moments predominantly in the transverse direction, as the outer
bearings are placed on cantilever part of pier cap.

12.9
2.35 2.05 2.05 2.05 2.05 2.35

0.85 P1 P3 P1

P1
1.2

4.1
1.2

A2
P2 P4 P2
0.85

Size of the pedestal = 1000 x 1000 mm


Size of the Bearing = 500 x 500 mm

Width of the Pier = 7 m. Length = 1.8 m.


Side of the equivalent square = 6.40 m. Eqv Cutwater = 0.64 m

Distance between point of load and Pier edge a = 0.90 m.


Distance fopr checking at face of pedestal a1 = 0.4 m.
Overall depth at junction = 1.50 m
Clear cover of the pier cap = 50 mm.
Assuming 20 nos 32 dia bars in top layer
20 nos 25 dia bars in 2nd layer
10 legged 16 dia @ 150 c/c stirrups
Effective depth d = 1.386 m
a/d 0.65 DESIGN AS CORBEL

Design of Pier Cap 3


LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019
Load Calculation

Dead load for P1 = 212.00 t. **Load on permanent bearing during service


SIDL for P1 = 17.13 t. stage is taken from Grillage Analysis.
SIDL(varying) for P1 = 25.13 t.
Dead load for P2 = 212.00 t.
SIDL for P2 = 17.13 t.
SIDL(varying) for P2 = 25.13 t.
Selfweight of the piercap = 9.14 t/m. ** Wt of cantilever part of pier cap is
Wt of Transverse Stopper = 7.83 t. converted to udl
Lever arm = 0.90 m

Load Calculation for CWLL


Case-1: For maximum reaction/max transverse moment case
Impact Factor = 1.10
Reaction on P1 = 27.39 t (Impact Factor is 50% for Pier Cap )
Reaction on P1 due to transverse moment = ± 39.12 t
Reaction on P2 = 27.39 t (Impact Factor is 50% for Pier Cap )
Reaction on P2 due to transverse moment = ± 39.12 t
** Ref CWLL analysis page for total LL
Total reaction on P1 = 320.77 t Reaction. It is distributed among 10 bearings
Total reaction on P2 = 320.77 t

Total reaction on the piercap = 641.55 t


Hence moment due to piercap reaction = 577.39 t-m
Torsional moment due to unbalanced reaction = 0.00 t-m
Equivalent B.M = 0.00 t-m
Equivalent Shear = 0.00 t S/w of cap - shear
Moment due to selfweight of the piercap = 55.32 t-m 37.540 t
& for trans. Seismic stopper
Hence total moment on the pier cap = 632.71 t-m

Case-2: For maximum torsional moment case (One Span Dislodged case)

LL Reaction on P1 = 0.00 t
Reaction on P1 due to transverse moment = ± 0.00 t
** Ref CWLL analysis page for total LL
Total reaction on P1 = 254.26 t Reaction. It is distributed among 10 bearings
Total reaction on P2 = 0.00 t of one side span only

Total reaction on the Piercap = 254.26 t


Hence moment due to piercap reaction = 228.83 t-m
Torsional moment due to unbalanced reaction = 305.11 t-m
Equivalent B.M = 245.14 t-m
Equivalent Shear = 119.07 t

Hence total moment on the pier cap = 529.30 t-m

From the above it is clear that maximum Transverse moment case is governing.

Design of Pier Cap 4


SUMMARY OF FORCES
AND MOMENTS
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Job No 4800197 4800197-GGN-DD-013


Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

SUMMARY OF FORCES & MOMENTS

Summary of Forces & Moments - ULS

P1+P2 for Corbal in transverse direction


Factored Factored Moment
Loads Load Factor Shear Moment
Shear
T T-m T T-m
Dead load 1.35 424.000 381.60 572.400 515.16
Dead load of Pier cap 1.35 37.540 55.32 50.679 74.6865911
SIDL 1.35 34.260 30.83 46.251 41.6259
SIDL - Wearing course 1.75 50.260 45.23 87.955 79.1595
LL 1.5 133.026 119.72 199.539 179.585396

956.824 890.217387

P1/P2 for Corbal in longitudnal direction


Factored Factored Moment
Factored Torsion
Loads Load Factor Shear Moment
Shear
T T-m T T-m T-m
Dead load 1.35 212.000 246.12 286.200 332.266591
SIDL 1.35 17.130 15.42 23.126 20.81295
SIDL - Wearing course 1.75 25.130 22.62 43.978 39.57975
LL - Normal position 1.5 92.133 82.92 138.199 124.379145

Normal Combination 491.502 591.725027 411.9012

Torsion in Span Dislodged case


Factored Factored
Loads Load Factor Shear Moment
Shear Moment
T T-m T T-m
Dead load 1.35 212.000 254.40 286.200 343.440
Dead load of Pier cap upto
1.35 0.000 0.00 0.000 0.000
pedastal face
SIDL 1.35 17.130 20.56 23.126 27.751
SIDL - Wearing course 1.75 25.130 30.16 43.978 52.773
LL - Normal position 1.5 0.000 0.00 0.000 0.000

Normal Combination 353.303 423.964

Design of Pier Cap 6


LOUIS BERGER Document no.

Detailed Engineering in Connection with


Job No 4800197 4800197-GGN-DD-013
Rehabilitation and Up-Gradation to Four Laning of
NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section Designed by: Checked by: Date
in the State of West Bengal on EPC mode Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

DESIGN OF PIER CAP (TRANSVERSE DIRECTION)

CORBEL DESIGN (as per Raina)

Grade of concrete M 35 Mpa


Grade of steel Fe 500 Mpa
m 1.4

DL of SuperStructure = 623.025 Tons


Total wt of SIDL = 134.206 Tons
Live load = 199.59 Tons
Total wt of superstructure= 956.821 Tons

Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 1591 Ton = 286.4 Tons
Force to be resisted by each reaction block = 286.4 Tons for 1.0 blocks
Factored load for seismic 1.5 times = 1.5 429.6 Tons
Height of the Reaction Block 1500 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 4100 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 1125 mm

face to cg of load a 900 mm


thickness of corbel at face h 1125 mm
effective depth of corbel d' 1011 mm
d 809 (0.8d')
width of corbel b 4100 mm
Ultimate Shear force (seismic) Vu 957 T with factor of 1.5 for seismic
Hor force perpendicular to Vu Hu 429.6 T >=0.2Vu
Conc. shear capacity (10bd) Vc 331.6 T
Checks
ac/hc >= > 0.5 & < 1.0 0.800
a/d' <= 1 0.890 design as corbel
Vu/bd <= 0.15fc = 4.2 2.89 safe

Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.

Detailed Engineering in Connection with


Job No 4800197 4800197-GGN-DD-013
Rehabilitation and Up-Gradation to Four Laning of
NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section Designed by: Checked by: Date
in the State of West Bengal on EPC mode Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

Avf = Vu = 16081 mm2


0.85*fsy*m

At = Hu 10109 mm2
.85*fy

Af = Vu*a+Hu*(h-d') 26477 mm2


0.85*fsy*d

As >=(Af+At) 36586 As final 36586 mm2


(tensile) >=(.667*Avf+At) 20835
>=(.04*f'c/fsy)*bd' 9285
provide 32 dia bars (layer -1)
Nos 40
spacing 101 mm
provide 20 dia bars (layer -2)
Nos 40
As provided 44714 mm2 OK

Ah >=0.5As 18293 Ah final 18293 mm2


spacing of hor bars below top As = 2/3 depth
provide 16 dia bars
Legged 14 spacing 101
Nos. 7 Ah prov 19694 mm2 OK
vert spacing 148 mm c/c

Fed 957 ton > Vrd,c 331.6 ton Vert Stirrups reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 10998 mm2

Provide 14 Legged 16 mm dia 5 Set vertically


Upto face of piercap
Av prov 14067 mm2 OK

Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation


Job No 4800197 4800197-GGN-DD-013
and Up-Gradation to Four Laning of NH-31D from Km.
113+200 to km. 154+854 (Package-2-A) of
Ghoshpukur-Salsalabari section in the State of West Designed by: Checked by: Date
Bengal on EPC mode Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

DESIGN OF PIER CAP (LONGITUDNAL DIRECTION)

CORBEL DESIGN (as per Raina)

Grade of concrete M 35 Mpa


Grade of steel Fe 500 Mpa
m 1.4

DL of SuperStructure = 286.2 Tons


Total wt of SIDL = 67.103 Tons
Live load = 138.20 Tons 0 FOR LONG DIRN.
Total wt of superstructure= 491.502 Tons

Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 507.0667 Ton = 91.3 Tons
Force to be resisted by each reaction block = 91.3 Tons for 1.0 blocks
Factored load for seismic 1.5 times = 1.5 136.9 Tons
Height of the Reaction Block 970 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 1360 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 1500 mm

face to cg of load ac 300 mm


thickness of corbel at face hc 1500 mm
effective depth of corbel d' 1386 mm
d 1109 (0.8d')
width of corbel b 1360 mm
Ultimate Shear force (seismic) Vu 492 T with factor of 1.5 for seismic
Hor force perpendicular to Vu Hu 137 T >=0.2Vu
Conc. shear capacity (10bd) Vc 150.8 T
Checks
ac/hc >= > 0.5 & < 1.0 0.200
ac/d' <= 1 0.216 design as corbel
Vu/bd <= 0.15fc = 4.2 3.26 safe

Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation


Job No 4800197 4800197-GGN-DD-013
and Up-Gradation to Four Laning of NH-31D from Km.
113+200 to km. 154+854 (Package-2-A) of
Ghoshpukur-Salsalabari section in the State of West Designed by: Checked by: Date
Bengal on EPC mode Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

Avf = Vu = 8261 mm2


0.85*fsy*m

At = Hu 3221 mm2
.85*fy

Af = Vu*a+Hu*(h-d') 3460 mm2


0.85*fsy*d

As >=(Af+At) 6682 As final 8731 mm2


(tensile) >=(.667*Avf+At) 8731
>=(.04*f'c/fsy)*bd' 4222
provide 32 dia bars As provided 10450 mm2 OK
Nos 13 spacing 102 mm

Ah >=0.5As 4366 Ah final 4366 mm2


spacing of hor bars below top As = within full depth
provide 16 dia bars
Legged 4 spacing 102
Nos. 7 Ah prov 5627 mm2 OK
vert spacing 202 mm c/c

Fed 492 ton > Vrd,c 150.8 ton Vert Stirrups reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 1574 mm2

Provide 8 Legged 16 mm dia 2 Set vertically


Upto face of piercap
Av prov 3215 mm2 OK

Piercap_123+518.5_1_corbal
LOUIS BERGER Document no.

Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-013
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
Designed by: Checked by: Date
of West Bengal on EPC mode
Akshit S.Chatterjee
Design of Pier cap for Ch: 123+518.5 29-11-2019

Torsion check for Long Direction in One span dislodged case:


114 Torsion TED KN-m 4240
115 q 45
116 Sin q 0.707
117 Cos q 0.707
118 D at pedestal location m 1.08
119 B at pedestal location m 4.10
120 Area (A) at pedestal location m^2 4.43
121 Outer perimeter (u) m 10.36
122 tef (m) only for one outer web m 0.428
123 Ak m^2 2.40
124 TRd, max = KN-m 8544
125 Only Torsion UR 0.496
128 If q = 45 deg, both Ast and Asl for Torsion will be same.
129 Ast / st = TED / (2*Ak*fyd*cot q) (mm2/mm). 1.847 Only 1 Leg of outer closed link will be considered
130 Provided Bar Dia mm 25 Outer closed stirrup
131 Spacing mm 150
132 Ast/st provided (mm2/mm). 3.271
133 OK
134 AsL / sL = TED *cot q/ (2*Ak*fyd) (mm2/mm). 1.847
135 Width of pier cap mm 4100
136 AsL reqd (mm2) 7572.2
137 Required Ast (mm2) 44714 Bars are uniformly distrubuted along the width
138 Provided Ast (mm2) 36586 OK

139 Depth of pier cap 1081


mm
AsL reqd (mm2) 1997.2
Provided Ast (at bottom) (mm2) 2011.1 16 dia. 10 no.s OK

Design of Pier Cap


DESIGN OF TEST PILES
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Job No 4800197
DD-045
Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Akhil Madhusudan
Design of Test Piles for MNB at Ch. 134+814 29-11-2019

PIER PILES

REINFORCEMENT PROVIDED IN TEST PILE

It is proposed to provide following reinforcement (Grade Fe500 having minimum elongation of 14.5% &
conforming to IS: 1786) in the test pile:

For Piles under pier location:


nos. of24 20 mm dia (i.e. min of 0.4%)
nos. of 0 20 mm dia
Total Pt = 0.43 %
INITIAL VERTICAL LOAD TEST ON PILES

WORKING VERTICAL LOAD (SAFE LOAD) ON FREE HEADED PILES

For piles, V = 500 t (SLS)

TEST LOAD (ULTIMATE LOAD) ON FREE HEADED PILES

For piles, Vu = 2.5 x 500 = 1250 t.

FOR VERTICALLY LOADED PILES

Same test pile as used in lateral load test shall be used. Hence, reinforcement proposed is Pt =0.43%
Under vertical load compression in concrete governs

We consider the Ultimate load on pile

Vu = 1250 t
2
A= 1.7671 m (for 1500mm dia pile section)
2 2
c = Vu/A = 707.36 t/m < 1680 t/m for M35.
Hence OK