You are on page 1of 1

Flight units

10 9
6 5
Oceanview Pocket 5, ASTER Court
2 1
FAÇADE & BALCONY ONLY

ITEM QUANTITY

Sleeve pipe 14.99m

Valve stop tap box -

25mm lever stop valve -

25mm hdpe pipe 43.95m

25mm hdpe elbows 31

Male bends 6

25mm hdpe tees -

32mm brackets 26

25mm brackets 51

25mm male straight -

Concrete reinstatement - m2

1. Neatly concrete over all excavated areas at the manifold _________

2. Patch & Paint all areas______

3. Stop tap boxes flush with the reinstated concrete level _____

4. Pipe work laid in the ground & façade as per specification ______

5. All unit number plastic tags installed _____

6. Comments :____________________________________________________________

You might also like