You are on page 1of 1

Flight units

11 12
7 8
3 4 Oceanview Pocket 1 ,Carol Court

ITEM QUANTITY

Sleeve pipe 12.2m

Valve stop tap box 8

25mm lever stop valve 8

25mm hdpe pipe 26.4m

25mm hdpe elbows 22

Male bends 6

25mm hdpe tees 4

32mm brackets 27

25mm brackets 17

25mm male straight 16

Concrete reinstatement 3.39m2

1. Neatly concrete over all excavated areas at the manifold _________

2. Patch & Paint all areas______

3. Stop tap boxes flush with the reinstated concrete level _____

4. Pipe work laid in the ground & façade as per specification ______

5. All unit number plastic tags installed _____

6. Comments :____________________________________________________________

You might also like