Professional Documents
Culture Documents
Provided: Item Quantity
Provided: Item Quantity
NB :Manifold measurements were not done because no layout photograph was provided
ITEM QUANTITY
Male bends 11
32mm brackets 54
3. Stop tap boxes flush with the reinstated concrete level _____
4.Pipe work laid in the ground & façade as per specification ______
Comments :____________________________________________________________