Professional Documents
Culture Documents
Phone :
Company / customer :
Address :
Power supply :
Control voltage :
&AAB/1
Date : 9/10/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Title page / cover sheet
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Title page / cover sheet
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 1 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
TABLE OF CONTENTS
HIGHER-LEVEL FUNCTION MOUNTING LOCATION: PAGE PAGE DESCRIPTION DATE EDITED BY
&AAA/1 &EPA/1
Date : 10/3/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Table of contents
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Table of contents
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 2 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
2 TF62N-A 1 Analog solid state timers TF62N, 1 Relay Output TF62N Hanyoung
8 MY4-CR AC220/240 2 Electromechanical relays, Industrial plug-in relays, MY MY4-CR AC220/240 OMRON
9 P2CF-08 1 Front connecting socket, Number of terminals: 8, Carry current 5 A P2CF-08 OMRON
11 3022218 6 Quick mounting end clamp for NS 35/7,5 DIN rail or NS 35/15 DIN rail 3022218 Phoenix Contact
12 3001035 6 Nominal cross section 2.5 mm², Nominal current In 24A, Nominal voltage Un 690 V UK 2,5 B Phoenix Contact
13 3004362 4 Nominal cross section 4 mm², Nominal current In 32A, Nominal voltage Un 800 V UK 5 N Phoenix Contact
14 0441504 1 Ground modular terminal block, Nominal cross section 4 mm² USLKG5 Phoenix Contact
15 0441119 2 Ground modular terminal block, Nominal cross section 2.5 mm² USLKG 2,5 N Phoenix Contact
17 XA2ES542 1 Red Ø40 Emergency swtiching off push-button Ø22 non trigger - turn release 1NC XA2 Schneider
23 XB7ND25 1 Selector switch - Ø 22 - black - standard handle - 2 positions - 1 NO + 1NC XB7ND25 Schneider
&AAB/1 &APB/1
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Summarized parts list
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Summarized parts list
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 3 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
-2F4.1 1 Thermal Overload Relays, Setting range 1-1.6A, 1a1b MT-32 LS LSIS.MT32-5
-3F4.1 1 Thermal Overload Relays, Setting range 1-1.6A, 1a1b MT-32 LS LSIS.MT32-5
-4K6 1 Coil ratings: 4.8mA 220 VAC, Control output 3A 24V, Socket Pins 14, Current Rating 5 A MY4-CR AC220/240+PYF14A-E OMRON MY4-CR AC220/240+PYF14A-E
-4K7 1 Coil ratings: 4.8mA 220 VAC, Control output 3A 24V, Socket Pins 14, Current Rating 5 A MY4-CR AC220/240+PYF14A-E OMRON MY4-CR AC220/240+PYF14A-E
-4S1 1 Red Ø40 Emergency swtiching off push-button Ø22 non trigger - turn release 1NC XA2 Schneider SE.XA2ES542
-4S1.1 1 Selector switch - Ø 22 - black - standard handle - 2 positions - 1 NO + 1NC XB7ND25 Schneider SE.XB7ND25
-4S1.2 1 Push-button Ø22, Spring return, Red - 1NC XB7NA42 Schneider SE.XB7NA42
-4S1.3 1 Push-button Ø22, Spring return, Green - 1NO XB7NA31 Schneider SE.XB7NA31
-4S3 1 Push-button Ø22, Spring return, Red - 1NC XB7NA42 Schneider SE.XB7NA42
-4S3.1 1 Push-button Ø22, Spring return, Green - 1NO XB7NA31 Schneider SE.XB7NA31
-4U5 1 Analog solid state timers TF62N, 1 Relay Output TF62N Hanyoung HYG.TF62N
&EPA/1 1.a
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Device tag list
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Device tag list
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 4 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
-WD1 1 VVCm 4x2.5mm2, 300/500V, TCVN 6610 VVCm 4x2.5 Lion LION.VVCm 4x2.5
-WD2 1 VVCm 4x2.5mm2, 300/500V, TCVN 6610 VVCm 4x2.5 Lion LION.VVCm 4x2.5
1 &ETC/1
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Device tag list
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1.a
Page Type : Device tag list
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 5 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
&APB/1.a 2
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Overview enclosure
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Model view
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 6 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
ENCLOSURE LEGEND
Device tag Part number
-1H2 SE.XB7EV04MP
-1H3 SE.XB7EV05MP
-1H3.1 SE.XB7EV03MP
-4S1 SE.XA2ES542
-4H1 SE.XB7EV03MP
-4H4 SE.XB7EV03MP
-4H8 SE.XB7EV04MP
-1H3.1
-4H9 SE.XB7EV04MP
-1H2
-1H3
-4S1.2 SE.XB7NA42
-4S1.3 SE.XB7NA31 22 mm
-4S3 SE.XB7NA42
-4S3.1 SE.XB7NA31
-4S1.1 SE.XB7ND25
-4S1
-4S1.1
-4H1
-4H8
-4H4
-4H9
-4S1.3
-4S1.2
-4S3.1
-4S3
1 3
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL View door enclosure
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 2
Page Type : Model view
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 7 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
ENCLOSURE LEGEND
Device tag Part number
-1F4 LSIS.BKN_3P_10A
-2F4 LSIS.BKN_3P_6A
-3F4 LSIS.BKN_3P_6A
-1Q3.1
-4K1 LSIS.MC-9b
-1F4
-2F4
-3F4
-4F1
-1Q2
-1Q3
-4K3 LSIS.MC-9b
-1Q2 SE.DF81
U10
-1Q3 SE.DF81
-1Q3.1 SE.DF81
-3F4.1 LSIS.MT32-5
-2F4.1 LSIS.MT32-5
-4F1 LSIS.BKN_1P_6A
-4U5
-U10 OMR.P2CF-08
-4U5 HYG.TF62N
-X1:1 PXC.3022218
-X1:1 PXC. 3004362
-X1:2 PXC. 3004362
-X1:3 PXC. 3004362
-X1:4 PXC. 3004362
-X1:5 PXC. 0441504
-X1:5 PXC.3022218
-X3:1 PXC.3022218
-X3:1 PXC. 3001035
-X3:2 PXC. 3001035
-X3:3 PXC. 3001035
-X3:4 PXC. 0441119
-4K6
-4K7
-4K1
-4K3
-X3:4 PXC.3022218
-X2:1 PXC.3022218
-X1:1 -X2:1 PXC. 3001035
-X1:1 -X2:2 PXC. 3001035
-X1:2 -X2:3 PXC. 3001035
-X1:3
-X1:4 -X2:4 PXC. 0441119
-2F4.1
-3F4.1
-X3:1
-X3:1
-X3:2
-X3:3
-X3:4
-X3:4
2 4
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL View panel enclosure
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 3
Page Type : Model view
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 8 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
-U1
-U7
-U4
-U2 -U3
-U8
-U6 -U9
-U5
3 5
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL View rail duct enclosure
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 4
Page Type : Model view
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 9 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
FRONT RIGHT
BOTTOM
4 6
Date : 10/19/2019 Dimensions enclosure
PROJECT : Project Control 2 Pump Run Alternate Method DOL
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 5
Page Type : Model view
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 10 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
CUTTING LIST
DT PART NUMBER FUNCTION DESCRIPTION LENGTH
-U6 RCCN.HVDR2525 Wire duct Wire duct color gray, W25 x H25 193 mm
-U4 RCCN.HVDR2525 Wire duct Wire duct color gray, W25 x H25 298 mm
-U1 RCCN.HVDR2525 Wire duct Wire duct color gray, W25 x H25 350 mm
-U5 RCCN.HVDR2525 Wire duct Wire duct color gray, W25 x H25 350 mm
-U2 RCCN.HVDR2525 Wire duct Wire duct color gray, W25 x H25 363.5 mm
-U3 RCCN.HVDR2525 Wire duct Wire duct color gray, W25 x H25 363.5 mm
5 &EMA/1
Date : 10/2/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Cutting list
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 6
Page Type : Parts list
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 11 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
CONNECTION LIST
CONNECTION TARGET 1 TARGET 2 COLOR CROSS-SECTION L-3.1 -1F4:5 -X1:3 BU 2.5
&ETC/6 1.a
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Connection list
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Connection list
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 12 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
CONNECTION LIST
CONNECTION TARGET 1 TARGET 2 COLOR CROSS-SECTION
1 &EMB/1
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Connection list
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1.a
Page Type : Connection list
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 13 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
CABLE DIAGRAM
Cable name -WD1 Cable type VVCm
Connection Connection
Function text Page / column Target designation from Conductor Target designation to Page / column Function text
point point
&EMA/1.a 2
Date : 10/2/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Cable diagram -WD1
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Cable diagram
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 14 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
CABLE DIAGRAM
Cable name -WD2 Cable type VVCm
Connection Connection
Function text Page / column Target designation from Conductor Target designation to Page / column Function text
point point
1 &EFS/1
Date : 10/2/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Cable diagram -WD2
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 2
Page Type : Cable diagram
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 15 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
-X1 1 2 3 4 5
1 3 5
-1F4
10A
MCB 2 4 6
Icu 6kA
12.1
BK
0.75
13.2
BK
0.75
13.3
BK
0.75
1 1 1
X1 X1 X1
-1H2 -1H3 -1H3.1
Phase A X2 Phase B X2 Phase C X2
N-1
BK
0.75
R S T N PE
2.1 2.1 2.1 4.0 2.1
&EMB/2 2
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Power Supply 400VAC - 50Hz
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 1
Page Type : Schematic multi-line
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 16 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
L-1.3
RD
2.5
1.4 / R R / 3.1
L-2.3
YE
2.5
1.4 / S S / 3.1
L-3.3
BU
2.5
1.4 / T T / 3.1
PE-2
GNYE
1.0
1.5 / PE PE / 3.1
1 3 5
-2F4
6A
MCB 2 4 6
Icu 6kA
U1 V1 W1
RD YE BU
2.5 2.5 2.5
-X2 1 2 3 4
-WD1
VVCm
4C2.5
300/500V BN BU BK GNYE
U1 V1 W1
M
-2M4
0.37 kW 3~
PUMP-1
PE
1 3
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Pump 1 Wiring Diagram (Power Circuit)
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 2
Page Type : Schematic multi-line
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 17 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
L-1.6
BK
0.75
2.8 / R R / 4.0
2.8 / S
2.8 / T
2.8 / PE
1 3 5
-3F4
6A
MCB 2 4 6
Icu 6kA
U1 V1 W1
RD YE BU
2.5 2.5 2.5
-X3 1 2 3 4
-WD2
VVCm
4C2.5
300/500V BN BU BK GNYE
U1 V1 W1
M
-3M4
0.37 kW 3~
PUMP-2
PE
2 4
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Pump 2 Wiring Diagram (Power Circuit)
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 3
Page Type : Schematic multi-line
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 18 / 19
www.hocthatlamthat.edu.vn
0 1 2 3 4 5 6 7 8 9
L-1.7 L-1.8
BK BK
0.75 0.75
3.8 / R R/
1
-4F1
6A 2
MCB
Icu 6kA
41.1
BK
0.75
11
-4S1
Emergency Stop 12
41.3 41.3
BK BK
0.75 0.75
97 97
13 21 -2F4.1 -3F4.1
1 2
/2.4 /3.4
-4S1.1 98 98
Selector Switch 14 22
41.5
BK
0.75
42.1
BK
41.6 0.75
BK (-)(~)
0.75 -4U5
41.6 2 48.1 49.1
BK BK BK
0.75 45.1 0.75 0.75
BK 24-240 VAC/DC
0.75
42.2
11 BK 11
0.75
-4S1.2 -4S3
Stop-1 12 Stop-2 12
TF62N
41.7 43.1
BK 41.8 BK 44.1
0.75 BK 0.75 BK Relay output
0.75 0.75
X1 X1
-4H8 -4H9
Pump 1 Fault X2 Pump 2 Fault X2
7 1 3 4 8 6 5
(+)(~)
13 43 1 5 1 5 13 43
-4S1.3 -4K1 -4K6 -4K7 -4S3.1 -4K3
Start-1 14 /4.1 44 /4.6 9 /4.7 9 Start-2 14 /4.3 44
41.9 43.3
BK BK
0.75 0.75
95 95
-2F4.1 -3F4.1
/2.4 96 /3.4 96 44.2
Pump 1 Overload Pump 2 Overload BK
0.75
41.13
BK 13 13
41.13 0.75 44.2
BK BK -4K6 -4K7
0.75 0.75 Relay 14-pin, 4PDT Relay 14-pin, 4PDT
14 14
A1 X1 A1 X1
-4K1 -4H1 -4K3 -4H4
Coil AC-220V 50/60Hz A2 Running X2 Coil AC-220V 50/60Hz A2 Running X2
N-2 N-3 N-4 N-5 N-6 N-7 N-8 N-9
BK BK BK BK BK BK BK BK
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
1.4 / N N/
5 5
1 9 /4.2 1 9 /4.3
6 6
R/L1 U/T1 /2.4 R/L1 U/T1 /3.4 2 10 2 10
S/L2 V/T2 /2.4 S/L2 V/T2 /3.4 7 7
T/L3 W/T3 /2.4 T/L3 W/T3 /3.4 3 11 3 11
43 44 /4.1 43 44 /4.4 8 8
31 32 31 32 4 12 4 12
3
Date : 10/19/2019 PROJECT : Project Control 2 Pump Run Alternate Method DOL Control Circuit Wiring Diagram
Toàn Thật Co.,Ltd EPLAN Software & Service
Ed : Hoang Duc An Hotline: 0985 500 536 GmbH & Co. KG Page 4
Page Type : Schematic multi-line
www.real-group.org
Modification Date Name Original Replacement of Replaced by MST: 0314238236 Email: services.realgroup@gmail.com https://www.eplanusa.com Page 19 / 19
www.hocthatlamthat.edu.vn