You are on page 1of 7

Customer comments Resolution sheet For Calculations 060_JS_402 NOT FOR CLIENT SUBM

Project Ref: IOCLP MEG MIX


Customer: L&T Hydrocarbon
Date: 9/4/2020
Tag No
Clarification of comments

Comment
Sr.No DOCUMENT TITLE Sulzer Drawing no
Source

1 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 -

2 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 -

3 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

4 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

# 000000SULZER CONFIDENTIAL
5 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

6 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

7 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

8 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

9 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

10 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

11 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

12 L&T IPEG-6389-SIPL(2)-8430-CA-060-0001 _

# 000000SULZER CONFIDENTIAL
Closed
Open

# 000000SULZER CONFIDENTIAL
er comments Resolution sheet For Calculations 060_JS_402 NOT FOR CLIENT SUBMISSION

Comments by Customer Post Order Engineering reply

We will update this comment

We need inputs from FEA for this point.


As there is corrosion allowance value for hydrotest in cold and
new condition (MAP) and hot and corroded condition should be
different in FEA Report.
After receiving inputs from FEA we can update those value
according to FEA report on commented place.

Mentioned correctly. We will provide CRS for this point.

We have already provided CRS for this point.


PM needs to confirm the same with customer.

# 000000SULZER CONFIDENTIAL
FEA should take care for this point

FEA should take care for this point

FEA should take care for this point

FEA should take care for this point

FEA should take care for this point

FEA should take care for this point

FEA should take care for this point

FEA should take care for this point

# 000000SULZER CONFIDENTIAL
Status

OPEN

OPEN

OPEN

OPEN

# 000000SULZER CONFIDENTIAL
OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

# 000000SULZER CONFIDENTIAL

You might also like