You are on page 1of 3

Job Ref 22293

Triaxial Permeability Test


Borehole/Pit No. BH1

Site Name The Grove, Abington Road, Litlington Sample No. -

Project ID - Client J&M Contractors Depth m Ground Level

Sample Type B
Dark brown slightly gravelly slightly sandy silty CLAY with numerous
Soil Description
rootlets Samples received 02/02/2017
Schedule received 03/02/2017
Test Method BS1377: Part 6 : Clause 5 1990 Date started 17/02/2017

Orientation within original


Specimen Type/Preparation Remoulded Vertical
sample

In acordance with Clause


Specimen Details Initial Final Saturation Details 5.4.3

Height mm 115.0 - Initial Pore Pressure Parameter B 0.60

Diameter mm 105.0 - Final Pore Pressure Parameter B 1.00

Bulk Density Mg/m³ 1.70 1.76 Duration 3

Water Content % 33 34
Dry density Mg/m³ 1.28 1.31 Permeability Stage
Cell Pressure kPa 400
Consolidation Stage Top Pressure kPa 300

Cell Pressure applied kPa 400 Base Pressure kPa 350

kPa 300 Pressure Difference` kPa -50


Ba ck Pressure
kPa 100 Mean Effective Stress kPa 75
Effective Pressure
2 Duration Days 1
Duration Days

Coeffecient of Permeability at 200C 6.48E-10

Permeability Stage
7

5
Cummulative infrlow mL

0
0 50 100 150 200 250 300 350 400 450

Time (mins)

Test Report by K4 SOILS LABORATORY Checked and Aproved


Unit 8 Olds Close Olds Approach
Watford Herts WD18 9RU Initials K.P
Tel: 01923 711 288
Email: James@k4soils.com Date 02/03/2017
MSF5-R35 Approved Signatories: K.Phaure (Tech.Mgr) J.Phaure (Lab.Mgr)
Job Ref 22293
Triaxial Permeability Test
Borehole/Pit No. BH1

Site Name The Grove, Abington Road, Litlington Sample No. -

Project ID - Client J&M Contractors Depth m 1.00

Sample Type B
Off white silty sandy CLAY with numerous fmc and angular to sub-
Soil Description
angular mudstone fragments Samples received 02/02/2017
Schedule received 03/02/2017
Test Method BS1377: Part 6 : Clause 5 1990 Date started 17/02/2017

Orientation within original


Specimen Type/Preparation Remoulded Vertical
sample

In acordance with Clause


Specimen Details Initial Final Saturation Details 5.4.3

Height mm 115.0 - Initial Pore Pressure Parameter B 0.49

Diameter mm 105.0 - Final Pore Pressure Parameter B 1.00

Bulk Density Mg/m³ 2.02 2.09 Duration 3

Water Content % 20 22
Dry density Mg/m³ 1.68 1.71 Permeability Stage
Cell Pressure kPa 400
Consolidation Stage Top Pressure kPa 300

Cell Pressure applied kPa 400 Base Pressure kPa 350

kPa 300 Pressure Difference` kPa -50


Ba ck Pressure
kPa 100 Mean Effective Stress kPa 75
Effective Pressure
1 Duration Days 1
Duration Days

Coeffecient of Permeability at 200C 2.04E-09

Permeability Stage
18

16

14

12
Cummulative infrlow mL

10

0
0 50 100 150 200 250 300 350

Time (mins)

Test Report by K4 SOILS LABORATORY Checked and Aproved


Unit 8 Olds Close Olds Approach
Watford Herts WD18 9RU Initials K.P
Tel: 01923 711 288
Email: James@k4soils.com Date 02/03/2017
MSF5-R35 Approved Signatories: K.Phaure (Tech.Mgr) J.Phaure (Lab.Mgr)
Job Ref 22293
Triaxial Permeability Test
Borehole/Pit No. BH1

Site Name The Grove, Abington Road, Litlington Sample No. -

Project ID - Client J&M Contractors Depth m 2.00

Sample Type B
Light grey silty sandy CLAY with numerous fmc and angular to sub-
Soil Description
angular mudstone fragments Samples received 02/02/2017
Schedule received 03/02/2017
Test Method BS1377: Part 6 : Clause 5 1990 Date started 17/02/2017

Orientation within original


Specimen Type/Preparation Remoulded Vertical
sample

In acordance with Clause


Specimen Details Initial Final Saturation Details 5.4.3

Height mm 115.0 - Initial Pore Pressure Parameter B 0.36

Diameter mm 105.0 - Final Pore Pressure Parameter B 0.96

Bulk Density Mg/m³ 2.05 2.14 Duration 3

Water Content % 16 19
Dry density Mg/m³ 1.76 1.80 Permeability Stage
Cell Pressure kPa 400
Consolidation Stage Top Pressure kPa 300

Cell Pressure applied kPa 400 Base Pressure kPa 350

kPa 300 Pressure Difference` kPa -50


Ba ck Pressure
kPa 100 Mean Effective Stress kPa 75
Effective Pressure
1 Duration Days 1
Duration Days

Coeffecient of Permeability at 200C 1.53E-08

Permeability Stage
50

45

40

35
Cummulative infrlow mL

30

25

20

15

10

0
0 20 40 60 80 100 120 140

Time (mins)

Test Report by K4 SOILS LABORATORY Checked and Aproved


Unit 8 Olds Close Olds Approach
Watford Herts WD18 9RU Initials K.P
Tel: 01923 711 288
Email: James@k4soils.com Date 02/03/2017
MSF5-R35 Approved Signatories: K.Phaure (Tech.Mgr) J.Phaure (Lab.Mgr)

You might also like