1. OBJECTIVE: To establish a Paint Booth (Coating Booth) for Industrial Valve Factory.
6. COATING TYPE:
Option 1: Wet Coating
Option 2: Dry (Powder) Coating
3|Page
12.SPACE AVAILABLE:
37.30 m Wide
13.05 m Long
8.20 m Height (Eave Level)
(If above space is not adequate, the manufacturer shall specify the minimum space
needed)
4|Page
27.FINANCIAL QUOTATION :
a. Paint Booth System Cost in US $
b. Shipping & Insurance Cost (CIF – Dammam, Saudi Arabia) in US $
c. Installation / Commissioning Cost in US $
d. Training Cost in US $
e. One Year Supply Spare Parts Cost in US $
f. Total Cost in US $
28.SAFETY : Spray paint involves potential fire risk from both solvent and overspray deposits. It
also provides a health risk to the painter. Therefore Safe disposal required.
29.POLLUTION : The air exhausted from the paint shop must be free of paint.
30.QUALITY : Over spray and dust particles in the atmosphere may settle on wet painted
components. We need a spray paint booth to eliminate it settling on wet painted
components.