SMR Station Master Key in De-energizing of this relay
Relay by changing the SM key to Reverse by the stationmaster will prevent unauthorized operation. LR Route Initiating Relay To initiate the points on the selected route based on the selection of signal knob position & Route Button. UR Route Initiating Relay for To initiate the Route for the Advance Starter Advance Starter. WNR Normal Point ordering Relay to ensure the Relay selection of Normal point operation. WRR Reverse Point Ordering Relay to ensure the Relay selection of Reverse point operation. WLR Point Locking Relay Relay to prevent the point operation when the point is set to the required position after the selection of a route. NWKR Normal Point Detection Relay to detect the point Relay condition is in Normal at field. RWKR Reverse Point Detection Relay to detect the point Relay condition is in Reverse at field. NWKPR Normal Point Detection Relay to break before the Repeater Relay actual relay to perform the normal operation when selected. RWKPR Reverse Point Detection Relay to break before the Repeater Relay actual relay to perform the Reverse operation when selected. NWKSR Normal Point Detection Relay to hold the Normal Stick Relay point detection once received from field till next operation. RWKSR Reverse Point Detection Relay to hold the Reverse Stick Relay point detection once received from field till next operation.
Southern Railway Projects Page1 of 4
RELAY NOMENCLATURE FUNCTION
UCR Route Checking Relay Relay to check the entire
route before Lock the Route.
SR Route Checking Relay for Relay to check the entire
Advance Starter route before Clearing Signal. TPR Track Repeater Relay To indicate the status of the track circuit TSR Track Stick Relay To prove one signal for one train movement ASR Approach Stick Relay When this relay is in “Up” the route is free to operate. When this relay in “Down” the route is locked. TPZR Route Release For First To ensure the sequence of Section operation of track by a train to release the route. TSSLR Route Release For Last To ensure the last sequence Section of operation of track by a train to release the route. OHR Overlap Control Relay Relay to ensure the locking of overlap points & to hold the overlap route. HR Signal Control Relay Relay to clear the Single (Single Yellow Aspect) Yellow Aspect. DR Signal Control Relay Relay to clear the Green (Green Aspect) Aspect. HHR Signal Control Relay Relay to clear the second (Double Yellow Aspect) Yellow Aspect. UGR Route Signal Control Relay to indicate the Relay selection of diverted route on the station. HECPR Single Yellow Aspect Relay to confirm the Lamp Proving Relay condition of filament in Yellow aspect lamp lit. DECPR Green Aspect Lamp Relay to confirm the Proving Relay condition of filament in Green aspect lamp lit. HHECPR Double Yellow Aspect Relay to confirm the Lamp Proving Relay condition of filament in second yellow aspect lamp while lit.
Southern Railway Projects Page2 of 4
RELAY NOMENCLATURE FUNCTION
UECPR Route Aspect Lamp Relay to confirm the
Proving Relay condition of lamps in Route aspect while lit. RECPR Red Aspect Lamp Proving Relay to confirm the Relay condition of filament in Red aspect lamp while lit. JSLR Timer Initiating Relay Relay to initiate the timer in cancellation.
JR Timer Relay Timer Relay to initiate the
NJPR. NJPR Normal Timer Relay Relay to ensure the timing for releasing the route once the cancellation is selected. RJPR Timer Element Back- To ensure that no timer Contact Proving Relay element is initiated for route cancellation. OVJSLR Timer Initiating Relay for Relay to initiate the timer Overlap for release of overlap route. OVJR Overlap Timer Relay Timer Relay to initiate the OVNJPR. OVNJPR Overlap Timer Element Relay to ensure the timing Proving Relay for releasing the overlap route once the cancellation is selected. OVRJPR Overlap Timer Element To ensure that no timer Back-Contact Proving element is initiated for Relay overlap route cancellation. CHR “Key in” Proving Relay Relay to ensure that the key for Crank Handle is not taken out from Key Transmitter Unit to operate the Crank Handle. CHR_CR Key Locked Control Relay Relay to permit the key to for Crank Handle be taken out from Key Transmitter Unit to operate the Crank Handle. LCPR Key Proving Relay for Relay to ensure that the key Level Crossing is kept in the Key Transmitter Unit/Gate lodge, once the Gate is closed. LCXR Key Locked Control Relay Relay to permit the key to for Level Crossing be taken out from Key
Southern Railway Projects Page3 of 4
RELAY NOMENCLATURE FUNCTION
Transmitter Unit/Gate lodge
to open the gate. CO_ERR Emergency Route Release Relay to be used for Relay for Calling-on signal emergency release of the Calling-on signal. HZR Ahead Signal Aspect Relay to ensure that the any Proving Relay one aspect is available in the ahead signal. ‘N’ or ‘S’ XR Main Filament Checking To ensure the Main Relay filament of all aspect in a signal is Working. GXPR Main filament failure To Prove the main filament Proving Relay failure.
ACKNR Main Filament Failure To acknowledge the Main
Alarm Acknowledging Filament Failure & to Stop Relay the Alarm. GFXR Signal Checking Relay Relay to ensure that the All Signals are Working. XR Signal Failure Alarm To Acknowledge Signal Acknowledging Relay Failure & to stop Alarm LVR Low Voltage Relay To ensure that the power supply is available at required voltage level to operate the system. R Power On Relay Relay to allow the system to working after the power supply is stabilized. SLR Power Supply Stabilized Relay to Ensure that the Relay power supply is Stabilized. LPR Power Failure Alarm To acknowledge the power Acknowledging Relay failure & To stop the Alarm. VCOR_A Vital Cut Off Relay for Relay to ensure the system ‘A’ system A is working with safe & healthy condition. VCOR_B Vital Cut Off Relay for ‘B’ Relay to ensure the system system B is working with safe & healthy condition.