1. Notice of Confidentiality
The present document is of character of Internal Use and touches the Classified character,
if the situation of the using of the document deserves it.
The information Showed in the document, procedures, creations and innovations of the
organization, as well as any Invention, policy or topic related created and designed by
SAETA is of Their property, any illegal use or reproduction of any of the above of the
ownership of SAETA without authorization or consent will be sanctioned and punished,
and there Could be legal repercussions

2. Scope
All staff working in the building of the company.

3. Modifications table
Date Version description Who Realized Who Revised Who Approved
September Gilberto Alexander
1.0 Creation Israel Ibarra
2019 Contreras Martinez
October Alejandro Gilberto Alexander
1.1 Documents Names
2019 Martinez Contreras Martinez

4. Objective
Definir cómo proceder en caso de una manifestación fuera de las instalaciones

5. Documentary internal reference


ID DOCUMENT
PROCEDIMIENTO DE EMERGENCIA
PARA LA REANUDACIÓN DE LAS
PE-2019-00
OPERACIONES EN LAS
INSTALACIONES PRINCIPALES
P-2019-01 PROCEDIMIENTO PARA EL REPORTE
Página 2
PROCESOS DE CONTINUIDAD DE NEGOCIO de 7

MANIFESTACIONES AL EXTERIOR DE LAS INSTALACIONES CÓDIGO: PC-2019-04


Emite: Gerencia de Operaciones Revisión: (1) Fecha: (31 – 10 – 2019)

DE DAÑOS
PROCEDIMINETO DE EMERGENCIA
PE-2019-04 PAARA REANUDACION EN EDIFICIO
SECUNDARIO
PROCEDIMIENTO DE EMERGENCIA
PE-2019-03 PARA LA CONSERVACION DE LA
CALMA DE EMPLEADOS

6. Entrees
 Manifestations outside the facilities
 Push Groups

7. Diagram

8. Outs
Restoring the minimum required operation either on the side or facilities in the main
building.

9. Narrative
NUM ACTIVITY KIND RESPONSABLE NARRATIVE
It presents a
START demonstration outside Entry - -
the premises
Closing all
Apply security at every Responsible for
1 Activity doors and
entrance to the building each area
windows locked
2 PE-2019-04 Subprocess IT manager Procedure that
Página 3
PROCESOS DE CONTINUIDAD DE NEGOCIO de 7

MANIFESTACIONES AL EXTERIOR DE LAS INSTALACIONES CÓDIGO: PC-2019-04


Emite: Gerencia de Operaciones Revisión: (1) Fecha: (31 – 10 – 2019)

contains the
saving process,
PROCEDIMINETO DE
transfer and
EMERGENCIA
data recovery
PAARA
operation to lift
REANUDACION EN
a building
EDIFICIO
company as
SECUNDARIO
well as the
activation of this
They will be
informed to all
employees that
doors and
Notification to windows closed
3 Activity Crisis Manager
employees on closing and the entry
and exit of the
building will be
temporarily
blocked
Indicate that no
one comes
Indicate that no one
close to doors
4 comes close to doors Activity Crisis Manager
and windows for
and windows
safety of
throwing things
Stay calm while
Stay calm while
5 Activity Crisis Manager passing the
passing the contingent
contingent
Have the
directory
emergency
Have the directory
police, Civil
emergency police, Civil
Defense, Red
Defense, Red Cross, Responsible for
Cross, Cruz
6 Cruz Verde and Activity building security
Verde and
suppliers, mainly and brigadiers
suppliers,
energy
mainly energy
In case for rapid
response if
necessary
¿There are some
Determine if
7 wounded who needs Desition Crisis manager
anyone hurt
assistance?
8 PE-2019-05 Subprocess brigaders Perform first aid
PROCEDIMINETO DE procedure, this
EMERGENCIA PARA speaks of the
Página 4
PROCESOS DE CONTINUIDAD DE NEGOCIO de 7

MANIFESTACIONES AL EXTERIOR DE LAS INSTALACIONES CÓDIGO: PC-2019-04


Emite: Gerencia de Operaciones Revisión: (1) Fecha: (31 – 10 – 2019)

possible
transportation to
PRIMEROS AUXILIOS
the hospital
someone
See if the event
9 Contingency ended? Decision Crisis Manager
has concluded
Method having
P-2019-01
Responsible for the instructions
PROCEDIMIENTO
10 Subprocess the area in and format for
PARA EL REPORTE
question reporting
DE DAÑOS
damage
PE-2019-00
Procedure that
PROCEDIMIENTO DE
contains the
EMERGENCIA PARA
instructions to
LA REANUDACIÓN Responsible for
11 Subprocess follow to raise
DE LAS each area
100% activities
OPERACIONES EN
in the main
LAS INSTALACIONES
building
PRINCIPALES

10. Risk related


 Ventanas rotas
 Daño en el edificio
 Empleados heridos
 Autos dañados o destruidos

11. Metrics

12. References

13. Glosary
 Company: SAETA
 BIA: Business Impact Analysis
 UPS: Uninterruptible Power Supply (UPS) is a device that, thanks to its batteries or
other energy storage elements during a power outage can provide limited power for
all devices connected time. Another feature that can be added to these devices to
improve the quality of electrical energy reaching loads, filtering ups and downs and
eliminating voltage harmonics of the network in case of using alternating current.
Página 5