DOCUMENT NO.

OPERATIONAL PROCEDURE
PAGE
GOOD MORNING INTERNATIONAL CORPORATION
EFFECTIVE DATE

IMPOSITION OF LABOR COST REVISION NO.

PREPARED BY: REVIEWED BY: APPROVED BY:

“ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE”


JERIC PAREDES ALERIDA U. REYES GEMMA CAYTON
SERVICE DEVELOPMENT ENGINEER HR MANAGER PRESIDENT

1.0 OBJECTIVES

1.1 To provide a proper method of labor cost imposition.

2.0 SCOPE

2.1 This procedure is only applicable to GMIC Team Leader Coordinator, Manager and Technical
Engineer for whom they are trained in this type of work, this procedure will only rotate
within the GMIC office for proper imposition of labor cost on the jobs to be performed.
Include in this scope is allowing the responsible person to be put on the lineup only the
work with the right pay.

3.0 TERMS AND DEFINITIONS

3.1 WIP (Work In Progress) – an excel spreadsheet equipped with a program that helps in the
smooth operation of monitoring, keeping an important records, organization of data and
financial analysis of a company.

3.2 ERP (Enterprise Resource Planning) – is an integrated system of software applications that
allows an organization to manage its business processes using a centralized relational
database.

3.3 SOR (Sales Order Request) –

3.4 ASSOCIATED HAZARDS

 Pressurized fluids
 Pressurized air and water
 Slippery surfaces
 Muscle strains
 Extreme heat
 Sharp objects

4.0 REFERENCE

None
DOCUMENT NO.
OPERATIONAL PROCEDURE
PAGE
GOOD MORNING INTERNATIONAL CORPORATION
EFFECTIVE DATE

IMPOSITION OF LABOR COST REVISION NO.

PREPARED BY: REVIEWED BY: APPROVED BY:

“ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE”


JERIC PAREDES ALERIDA U. REYES GEMMA CAYTON
SERVICE DEVELOPMENT ENGINEER HR MANAGER PRESIDENT

5.0 POLICIES AND OTHER CONSIDERATIONS

5.1 Optimize the use of resources by adhering to applicable provisions of Resource


Conservation.

5.2 For general environmental, safety and health in the workplace refer to General ESH
Guidelines and Best Practices.

5.3 Waste must be minimized, segregated, recycled and disposed-of properly in reference to
Waste Management Guidelines.

5.4 Significant environmental aspects identified must be controlled and managed properly,
refer to Company Safety Procedure.

6.0 DETAILS

ACTIVITY RESPONSIBILITY NOTES/ REFERENCES

START

A
DOCUMENT NO.
OPERATIONAL PROCEDURE
PAGE
GOOD MORNING INTERNATIONAL CORPORATION
EFFECTIVE DATE

IMPOSITION OF LABOR COST REVISION NO.

PREPARED BY: REVIEWED BY: APPROVED BY:

“ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE”


JERIC PAREDES ALERIDA U. REYES GEMMA CAYTON
SERVICE DEVELOPMENT ENGINEER HR MANAGER PRESIDENT

Coordinator 1. The coordinator is primarily


responsible for this work to inform the
Recommendation machinery owner of the additional
repairs or recommendations from
previous job orders. The information
must be transmitted right after being
encoded (AR) in ERP so that both
parties can agree on the next job or
transaction including labor cost and flat
rate time.

2. The coordinator team leader must


Planning of Manager/ Team
Leader/Technical plan all the agreed and additional
Unified Work
Engineer work, it needs thorough coordination
Agreements
with the manager and technical by
setting up a group chat and all
appropriate information must be
entered to provide only the correct
costing for the work to be done.
DOCUMENT NO.
OPERATIONAL PROCEDURE
PAGE
GOOD MORNING INTERNATIONAL CORPORATION
EFFECTIVE DATE

IMPOSITION OF LABOR COST REVISION NO.

PREPARED BY: REVIEWED BY: APPROVED BY:

“ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE”


JERIC PAREDES ALERIDA U. REYES GEMMA CAYTON
SERVICE DEVELOPMENT ENGINEER HR MANAGER PRESIDENT

Coordinator 3. 3. A coordinator will submit the


Proposition of corresponding document stating the
Labor Charges correct payment for the work to be
done, after which he will also follow
up on the assurance of approval and
he will do it three times a week.
B

Receive an 4. Upon receipt of the approved


Warehouse Supervisor
Approved proposition can be placed in the
Proposition lineup of work schedules, just make
sure the parts are ready and
prepared. Follow the WIP procedure
for an update.
A

END
DOCUMENT NO.
OPERATIONAL PROCEDURE
PAGE
GOOD MORNING INTERNATIONAL CORPORATION
EFFECTIVE DATE

IMPOSITION OF LABOR COST REVISION NO.

PREPARED BY: REVIEWED BY: APPROVED BY:

“ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE” “ORIGINAL SIGNATURE”


JERIC PAREDES ALERIDA U. REYES GEMMA CAYTON
SERVICE DEVELOPMENT ENGINEER HR MANAGER PRESIDENT

ATTACHMENTS

NONE

7.0 FORMS

1. WIP Form