The document summarizes the comments and feedback from panel examiners on a proposed development plan and design project. Key points addressed in the feedback include considering including more context on the need for new sports facilities, validating user data, justifying building capacities, redesigning site layouts, and benchmarking existing facilities. The proponents were requested to address these comments by providing additional data, rearranging site plans, clarifying discussions, and redesigning some aspects of the proposed structures.
The document summarizes the comments and feedback from panel examiners on a proposed development plan and design project. Key points addressed in the feedback include considering including more context on the need for new sports facilities, validating user data, justifying building capacities, redesigning site layouts, and benchmarking existing facilities. The proponents were requested to address these comments by providing additional data, rearranging site plans, clarifying discussions, and redesigning some aspects of the proposed structures.
The document summarizes the comments and feedback from panel examiners on a proposed development plan and design project. Key points addressed in the feedback include considering including more context on the need for new sports facilities, validating user data, justifying building capacities, redesigning site layouts, and benchmarking existing facilities. The proponents were requested to address these comments by providing additional data, rearranging site plans, clarifying discussions, and redesigning some aspects of the proposed structures.
Project Title: “PROPOSED DEVELOPMENT PLAN AND DESIGN OF SPORTS AND RECREATIONAL FACILITIES AT
BRGY. CALOOCAN, BALAYAN, BATANGAS”
Proponents: 1. Carable, John Michael J. 2. Gaba, Jose Henderson P. 3. Masicat, Jiannroi D. 4. Mercado, Sharmaine M.
Date of Defense: January 6, 2020
Summary of Comments
Comments Page No. Action Taken Page No. Remarks
Consider the Cutawtaw Included the Cutawtaw Gymnasium in the background 1-4 Gymnasium in the Background of the study of the Study Clarify the orientation of the 8 location of the proposed project Requested for and presented Present more data in Chapter 2 data of athletes that will use the to support the _ of design facilities of the proposed project Discussed the basis of the Discuss the basis of the 30 capacity for each building on capacity for each building Chapter _ Validate the source and provide a study of the users for the 30 proposed project Justified the paragraphs and Justify the paragraphs and - rephrased some sentences as - rephrase some sentences necessary
Engr. Erwin Rafael D. Cabral
Member, Panel of Examiner Project Title: “PROPOSED DEVELOPMENT PLAN AND DESIGN OF SPORTS AND RECREATIONAL FACILITIES AT BRGY. CALOOCAN, BALAYAN, BATANGAS” Proponents: 1. Carable, John Michael J. 2. Gaba, Jose Henderson P. 3. Masicat, Jiannroi D. 4. Mercado, Sharmaine M.
Date of Defense: January 6, 2020
Summary of Comments
Comments Page No. Action Taken Page No. Remarks
Interviewed the Balayan Need more discussion and data Municipal Planning and in Project Background about Development Office about the 1-4 the need of a new sports need of a new sports coliseum coliseum and included it on Project Background Location of the Study first Put the Location of the Study before the Objectives of the 4 before the Objectives of the Study Study Explain the current situation of Explained the current situation the location of the proposed 9 of the location of the proposed project project Discuss the reason of including Discuss the reason of including 9 the contour map the contour map on Chapter _ Requested for and presented Lack of data for the Potential data of athletes that will use the 11 Users facilities of the proposed project Show the basis of the capacity Showed the basis of the of users in sports coliseum and 11 capacity for the Sports include the number of delegates Coliseum on Chapter _ Validate the number of persons Showed the basis of the who will use the quarters 12 capacity for the Quarters building and the number of Building on Chapter _ rooms in the building Waste disposal and waste Removed waste disposal and management, fire protection waste management, fire 14 and security system does not protection and security system include in the Utilities from Utilities Discuss the budget in the Discussed the budget in the 18 Economic Constraints Economic Constraints The discussion under Put the discussion under Environmental Constraints are 19 Environmental Constraints into mostly technical Technical Constraints Are there no social constraint? 19 Explain the contents of the Explained the contents of the republic acts mentioned in the 19 republic acts mentioned in the Legal Constraints Legal Constraints Discussion under Health and Removed the discussion about Safety Constraints are not 19 Health and Safety Constraints constraints The description of the layout in Matched the description of the the paragraph does not match 23 site layout in the paragraph to the drawing the figure Include FIBA in the Design Included FIBA in the Design 24 Considerations Considerations Look for more codes for the 25 facilities Show a better perspective of the Changed the perspective of the 31 Sports Coliseum Sports Coliseum Reduce the dimensions to Reduced the dimensions to 31 whole numbers of the facilities whole numbers of the facilities Removed the functions of each Remove the functions of each 31 facility in the tables in the facility in the table Preliminary Design Remove the perspective of the Removed the perspective of the Materials Recovery Facility in 36 Materials Recovery Facility in the Preliminary Design the Preliminary Design Utilize/Rearrange the buildings Rearranged the buildings in the 37 in the site development plan site development plan Justify the number of parking Justified the number of parking 37 lot lot Redesign the parking area 37 Redesigned the parking area Use the vicinity map in the Used the vicinity map in the Location of the Project in - Location of the Project in Chapter 1 Chapter 1 Change ‘Site Development Changed ‘Site Development Plan’ into ‘Proposed Layout - Plan’ into ‘Proposed Layout Plan’ Plan’ Clarify the need of perimeter Clarified the need of perimeter - fence fence Clarify the size of the creek - TANGGALIN The dimension text should not - Placed the dimension text be at the center of the above the dimension line dimension line Redesigned the Sports Utilize the space of the toilet Coliseum and utilized the space and commercial space in the - of the toilet and commercial Sports Coliseum space Consider to elevate the height Elevated the height of the - of the Sports Coliseum Sports Coliseum to _ meters Performed a benchmarking Benchmark for the existing activity at an accommodation sports quarters with same - building for athletes in the facilities Batangas Sports Complex Redesign the proposed Redesigned the structures of the - structures proposed project
Engr. Rhea S. De Ocampo
Member, Panel of Examiner Project Title: “PROPOSED DEVELOPMENT PLAN AND DESIGN OF SPORTS AND RECREATIONAL FACILITIES AT BRGY. CALOOCAN, BALAYAN, BATANGAS” Proponents: 1. Carable, John Michael J. 2. Gaba, Jose Henderson P. 3. Masicat, Jiannroi D. 4. Mercado, Sharmaine M.
Date of Defense: January 6, 2020
Summary of Comments
Comments Page No. Action Taken Page No. Remarks
Justified the paragraphs as Justify the paragraphs - necessary Present a figure that shows the Presented a figure that shows existing court in Balayan is the existing court in Balayan is 2 located right in front of its located right in front of its municipal building municipal building Include the date when the Included the date when the picture of existing court is 3 picture of existing court is taken taken Present more pictures to prove 3 that there is lack of facilities Provide a representation of the Provided a representation of the location map of Balayan from 6 location map of Balayan from different source different source Overlay the contour map 9 Provide a table that lists the Tabulated the target activities in target activities in the Sports 11 the Sports Center Center ... low cost chenes Discuss the total population and Discussed the total population demography of Balayan and demography of Balayan (Discuss the foundation design Discussed the foundation - in Chapter 2) design in Chapter 2 Included a figure which shows Show that the location of the that the location of the proposed project is beside the 23 proposed project is beside the proposed new government proposed new government center center Clarify the need of perimeter Clarified the need of perimeter 23 fence fence Interviewed the Balayan Municipal Planning and Consider the slope protection Development Office regarding 23 system for the creek the plans for the creek and the slope protection system to be used Provide larger figure for the Provided a larger figure for the 23 proposed layout plan proposed layout plan Present the figure of the Presented the figure of the standard dimensions of the 29 standard dimensions of the courts in the appendix courts in the Appendix Consider the government center 37 Included the road network of in the traffic flow the proposed government center in the flow of traffic Parking area were placed only Centralize the parking area 37 at around the Sports Coliseum Show the creek in the drainage Showed the creek in the 52 layout drainage layout Improve the design of the Redesigned the structures of the - facilities to attract people proposed project