You are on page 1of 2

DAEWOO Office

Agcalaga, Calinog, Iloilo


Philippines
T +63.2.551.2316 F + 63.2.550.1897
www.daewooenc.com

National Irrigation Administration – Region VI Date: Dec. 11, 2019


Brgy. Tacas, Jaro, Iloilo City Ref. No: DW-JDL-19-00
Philippines

ATTENTION: Gerardo P. Corsiga / Regional Manager


PROJECT : Jalaur River Multi-Purpose Project Stage II
SUBJECT : Monitoring Report No. 22 of the consultant as of Nov. 29, 2019 Under Contract No.
JRMP-II

Dear Sir,
Referencecs:

1. DW-JDT-19-00102 dated September 27, 2019 – Submission of Method Statement of Cofferdam


in Siphon2 (Sta. 4+340-4+460).
2. DW-JDL-19-00278 dated October 25, 2019 – Response Letter to Submission of Method
Statement of Cofferdam Siphon 2, Sta. 4+340 – 4+460 Contract No. JRMP II-ICB-C-1.

We refer to the above letters and respond as follows:

1. Prior to the commencement of the cofferdam activity we have submitted the MS, but we did
not receive any comments or official document if it is approved to this date.
2. The Design for the GFC drawings for cofferdam is not applicable to actual site condition along
Alibunan River. The redesign for the invert level for Siphon #2 is lower than the previous GFC
drawings which makes the water pressure at the slope areas during excavation greater in
addition to strong water current during heavy rain making the GFC design prone to scouring or
being washed out.
3. Refer to the attached documents for your reference.

Attachment list:

1. JRMP II-ICB-2019-422 dated December 10, 2019 – Monitoring report No. 22 of the consultant
as of November 29, Under Contract No. JRMP II-ICB-C-1
2. High Line Canal issues and recommendations.
3. WRF-19-A2-000-18 – Cofferdam Sand Bagging
4. WRF-19-A2-000-19 – Cofferdam Embankment
5. JF-272 Cofferdam Layout for Siphon
DAEWOO Office
Jalandoni St, Calinog, Iloilo
Philippines
T +63.2.551.2316 F + 63.2.550.1897
www.daewooenc.com

6. DW-JDL-19-00278 – Response Letter for Submission of Method Statement of Cofferdam in


Siphon 2 Sta. 4+340 – 4+460 Under Contract No. JRMP II-ICB-C-1
7. JRMP II-ICB-2019-331 – Submission of Method Statement of Cofferdam in Siphon 2, Sta. 4+340
– 4+460 Under Contract No. JRMP II-ICB-C-1
8. Picture attachment for Cofferdam activity
9. Construction schedule for Cofferdam and Siphon 2
10. DW-JDT-19-00102 – Submission of Method Statement of cofferdam in Siphon 2 (Sta. 4+340-
4+460)
11. Method Statement of Cofferdam in Siphon 2 (Sta. 4+340 – 4+460)
12. Joint Survey Data for As-built of Siphon 2

Yours faithfully,

Ju-Seok Kim
Project Manager
JRMP-II Project

C.C.: Consultant of JRMP II


AIT-2 of JRMP II

Issue Type ■for Approval □for Certification □for Consent/Acceptance □for Determination □Notice
Response Expected ■ Yes ■Cat 1 (Within 3 days) □Cat 2 (Within 5 days) □Cat 3 (Within 10 days)
□ No