Design Calculation w/o Sludge Dewatering Facilities
1. DESIGN CRITERIA
Page 1
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
Page 2
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
2. DESIGN RESULT
Let,
Bar screen thickness = 10.0 mm
Bar spacing = 25 mm
Thus, clear area of screen = (500 35) x 0.025 x 0.2 m2
= 0.07 m2
Thus, flow through velocity at peak flow = (0.008 0.07) m/sec
= 0.11 m/sec ( 1.0 m/sec)
Page 3
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
Page 4
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
Proposed Grit Removal Chamber of = 1.00 m (W) x 3.50 m (L) x 1.00 m (D)
Page 5
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
= 27 day
288
= 0.94 day
= 2.25 hrs
Knowing hydraulic detention time at reactor is 18.43 Hrs.
Thus, fraction of the total retention volume required for the denitrification basin is
= 2.25 x 100 %
18.43
= 12.21 %
Knowing vol. of Aeration tank = 120.96 m3
and vol. of Anoxic Zone = 120.96 x 0.12 m3
= 14.77 m3
Volume of Anoxic Zone Provided = 1.10 m (W) x 5.10 m (L) x 3.60 m (D) x 1 unit
= 20.20 m3 (14.77 m3 req)
Proposed Anoxic Tank size = 1.10 m (W) x 5.10 m (L) x 3.60 m (D)
Page 6
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
= 37.79 m³
Volume provided = (26.53 + 37.79) m³
= 64.32 m³ > (Req.: 55.93 m³)
Area provided = (5.10 x 5.10 ) m²
= 26.01 m² > (Req.: 22.37 m²)
Thus, Sedimentation Chamber Area = 5.10 m x 5.10 m
Page 7
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
VT x MLSS
Quantity of WAS per day = SLUDGE
- Qavg x SS eff
Cu
where: -
VT = volume of reactor (m3)
MLSS = mixed liquid suspended solid (kg/m3)
SLUDGE = sludge age (days)
Qavg = average flow (m3/day)
SSeff = effluent suspended solid (kg/m3)
Cu = underflow concentration (kg/m3)
120.96 x 3.50
Thus, quantity of WAS per day = - 157.5 x 0.02
30
_
10
= 11.00 m3/day
10
= 1.10 m3/day
Vol. of sludge/day = 1.10 m³
= 11.33 kg/day
th
According to Metcalf-Eddy, 4 Ed. Page 1,536, the main objective of aerobic
sludge holding tank is to reduce the mass solid disposal and VSS reduction range
from 35% to 55%.
Page 8
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
Page 9
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
The summary of all the compartments of the treatment plant are as follow: -
Treatment tank
a) Aeration chamber (2.40 m x 7.20 m) x 2 units
b) Anoxic zone 1.10 m x 5.10 m
c) Sedimentation chamber 5.10 m x 5.10 m
d) Sludge holding chamber 1.40 m x 5.10 m
e) Chlorination Tank (0.50 m x 2.05 m) x 4 passes
Page 10
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities
4. CONCLUSION
Hence, the site area of the plant of 408.77 m2 is sufficient to construct the proposed plant
of PE capacity of 700 persons.
Thus, your kind approval on our renewal of PDC 1 submission is very much
appreciated.
Page 11