You are on page 1of 11

PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.

0
Design Calculation w/o Sludge Dewatering Facilities

PERMOHONAN KEBENARAN MERANCANG KEPADA CADANGAN


PEMBANGUNAN 1 BLOK HOTEL 8 TINGKAT YANG MENGANDUNGI:
i) 5 TINGKAT HOTEL (155 BILIK)
ii) 1 TINGKAT FASILITI
iii) 1 TINGKAT LOBI UTAMA DI ARAS TANAH (TERMASUK DEWAN
BANKUET)
iv) 1 TINGKAT SUB-BESMEN TEMPAT LETAK KERETA DAN 1 UNIT LOJI
RAWATAN KUMBAHAN
DI ATAS LOT 1780, (HSM 328-78) MUKIM KUAH, (LOT BARU 1046, SEKSYEN
4, BANDAR KUAH) DAERAH LANGKAWI, NEGERI KEDAH DARUL AMAN.
UNTUK TETUAN NILAM TIMUR SDN. BHD. (NO. SYARIKAT : 169187-A)

1. DESIGN CRITERIA

1.1 Population Equivalent Computation

No. of Area Total


Item Type of Development PE Criteria
Unit (m2) P.E.
1 Shop 1 31.5 3 PE/100m2 1
2 Banquet Hall (280 pax) 1 741.6 3 PE/100m2 22
3 Deluxe Rooms 136 4555.6 4 PE/Hotel Room 544
4 Junior Suite – Type 1 8 425.6 4 PE/Hotel Room 32
5 Junior Suite – Type 2 8 764.4 4 PE/Hotel Room 32
6 Presidential Suites 2 236.0 4 PE/Hotel Room 8
7 VIP Suite 1 106.8 4 PE/Hotel Room 4

Total Population Equivalent 643

Design plant capacity is for 700 PE > 643 PE.

1.2 Influent and Effluent Characteristics: -

BOD5 : 250 mg/liter (250 g/m3)


S.S. : 300 mg/liter (300 g/m3)
Oil & Grease :  5 mg/liter
Effluent Standard : BOD5 = 10mg/liter
SS = 20 mg/liter
Treatment Process : Extended Aeration

Page 1
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

1.3 Design Parameter Adopted

a) sludge, sludge age = 30 days


b) Y, yield coefficient over finite
period of log growth = 0.5
c) Thus, MLSS concentration
maintained in aeration basin = 3500 g/ m3 (3.5 kg/ m3)
d) S0 = influent soluble BOD5 concentration, mg/l
e) S = effluent soluble BOD5 concentration, mg/l

1.4 Design Parameter

a) Design population equivalent = 700 persons


b) Average flowrate/person = 0.225 m3/day
c) Average influent flowrate = 700 x 0.225 m3/day
= 157.50 m3/day (1.82 L/sec)
d1) Peak factor = 4.7 (p)-0.11
where p = population equivalent in thousand
Thus, peak factor = 4.7 (0.70)-0.11
= 4.89
d.2) Peak flow = 157.50 x 4.89 m3/day
= 769.87 m3/day (8.91 L/sec)
e.1) BOD5 loading /day = 157.50 x 0.25 kg
= 39.38 kg
e.2) % of BOD5 req. to remove/day = (250 – 10) %
250
= 96%
e.3) BOD5 req. to remove/day = 39.38 x 0.96 kg
= 37.8 kg
f.1) TSS loading/day = 157.50 x 0.30 kg
= 47.25 kg
f.2) % of TSS req. to remove = (300 – 20) %
300
= 93.3%
f.3) SS req. to remove/day = 47.25 x 0.9333 kg
= 44.10 kg

Page 2
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2. DESIGN RESULT

2.1 Primary Screen Chamber

Dimensions of screen chamber channel provided are as follows: -


Width of screen channel = 0.50 m
Hydraulic flow depth = 0.2 m
Flow area = 0.10 m2
Thus, approach velocity at peak flow = (0.008 0.10)
= 0.08 m/sec ( 1.0 m/sec)

Let,
Bar screen thickness = 10.0 mm
Bar spacing = 25 mm
Thus, clear area of screen = (500  35) x 0.025 x 0.2 m2
= 0.07 m2
Thus, flow through velocity at peak flow = (0.008  0.07) m/sec
= 0.11 m/sec ( 1.0 m/sec)

Proposed Primary Screen Chamber = 2.10 m (W) x 2.80 m (L)

2.2 Pump Sump

Design Average Flow, Qavg = 157.50 m3/day


= 0.11 m3/min
= 1.82 litre/sec
Design Peak Flow, Qpeak = 769.87 m3/day
= 0.53 m3/min
= 8.91 litre/sec
Volume of Pump Sump = V
Pump Cycle Time = 6 min or 10 start stop per hours
V = (6 x Qavg ) / 4 m3
= (6 x 0.53) / 4 m3
= 0.80 m3
Effective Depth = 0.45 m3
Pump Sump Area Required = (0.80 / 0.45) m2
= 1.78 m2

Area Provided = 2.00 m (W) x 2.10 m (L)


= 4.20 m2
Proposed Pump Sump of = 2.00 m (W) x 2.10 m (L)

Page 3
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2.3 Secondary Screen Chamber


Design Average Flow, Qavg = 157.50 m3/day
= 0.002 m3/sec
Design Peak Flow, Qpeak = 769.87 m3/day
= 0.009 m3/sec
Flow Through Screen Velocity at Qpeak = < 1.0 m/sec
Channel Width = 500 mm
Bar Thickness = 10 mm
Bar Spacing = 12 mm
Effective Depth = 200 mm
Flow Though Velocity Screen at Qpeak = (0.01 / 0.50 x 0.20) m/sec
= 0.09 m/sec

Clear Screen Width = (500 / 22) mm x 12mm


= 272.73 mm
= 0.27 m
Wetted Area of Screen = (0.27 x 0.20) m2
= 0.05 m2
Flow Through Screen Velocity at Qpeak = (0.002 / 0.05) m/sec
= 0.03 m/sec
Proposed Secondary Screen Chamber of = 1.00 m (W) x 2.15 m (L)

2.4 Grit Removal Chamber


Design Average Flow, Qavg = 157.50 m3/day
= 0.11 m3/sec
Design Average Flow, Qpeak = 769.87 m3/day
= 0.53 m3/sec
Detention Time = 3 min of Qpeak
Volume of Grit Removal Chamber
Required = 3 x 0.53 m3
= 1.60 m3
Volume Provided = (1.00 x 3.50 x 1.00) m3
= 3.50 m3
Proposed Grit Removal Chamber of = 1.00 m (W) x 3.50 m (L) x 1.00 m (D)

Page 4
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2.5 Grease Removal Chamber

Design Average Flow, Qavg = 157.50 m3/day


= 0.109 m3/sec
Design Average Flow, Qpeak = 769.87 m3/day
= 0.53 m3/sec
Detention Time = 3 min of Qpeak
Volume of Grit Removal Chamber
Required = 3 x 0.53 m3
= 1.60 m3
Volume Provided = (1.00 x 3.50 x 1.00) m3
= 3.50 m3

Proposed Grit Removal Chamber of = 1.00 m (W) x 3.50 m (L) x 1.00 m (D)

2.6 Treatment Tank

2.6.a Aeration Chamber

The area requires by this chamber is as follow: -


Volume required = 18 to 24 Hrs of D.W.F.
Let retention time = 18 Hrs
Thus, volume require = (18 x 157.50)  24 m³
= 118.13 m³
Area of aeration tank = 2.40 m (W) x 7.20 m (L) x 2 units
Liquid depth = 3.50 m
Volume provided = (2.40 x 7.20 x 3.50) m³ x 2 units
= 120.96 m³ > (req. 118.13 m³)

Proposed Aeration Tank of = 2.40 m (W) x 7.20 m( L) x 3.50 m (D)


x 2 units

Page 5
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2.6.b Calculation Of Denitrification Basin Residence Time


To calculate the denitrification basin residence time, Q from the equation,
U = So - S Equation (a)
Qx
where U = denitrification rate, Ib No3 - N/Ib.
MLVSS.d
So = Substrate concentration in influent, Mg/L
S = Substrate concentration in effluent, Mg/L
Q = Hydraulic detention time for denitrification, d
x = Concentration of micro organism in reactor,
mass Vss/unit volume, or mg/l
Thus, from equation (a),
Q = So - S Equation (b)
Ux
Adopt, U at 20oC = 0.03 to 0.11 (from MetCalf Eddy,
Wastewater Engineering Book, page 713)
Lets adopt U at 200C = 0.09 day-1

Let Inffluent Nitrate = 30 Mg/L


and Effluent Nitrate = 3 Mg/L
Hence, equation (b),
Q = 30 – 3 day
0.09 x 3200

= 27 day
288
= 0.94 day
= 2.25 hrs
Knowing hydraulic detention time at reactor is 18.43 Hrs.
Thus, fraction of the total retention volume required for the denitrification basin is
= 2.25 x 100 %
18.43
= 12.21 %
Knowing vol. of Aeration tank = 120.96 m3
and vol. of Anoxic Zone = 120.96 x 0.12 m3
= 14.77 m3
Volume of Anoxic Zone Provided = 1.10 m (W) x 5.10 m (L) x 3.60 m (D) x 1 unit
= 20.20 m3 (14.77 m3 req)
Proposed Anoxic Tank size = 1.10 m (W) x 5.10 m (L) x 3.60 m (D)

Page 6
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2.7 Sedimentation Chamber

The area required by this chamber is as follow: -

Volume required = 2.0 Hrs of peak flow


= (2 x 671.17)  24 m³
= 55.93 m³

Area required = 30 m³/m².day of peak flow


= (671.17  30) m²
= 22.37 m²

Dimension of Sedimentation tank is at follow: -


Hopper area = 5.10 m x 5.10 m
Hopper base area = 1.20 m x 1.20 m
Total hopper depth = 4.42 m
Actual hopper depth = 3.38 m
Side liquid depth = 1.02 m
Total liquid depth = 4.40 m
Slope gradient = 60°
No of hopper = 1
Volume of Sedimentation tank = Side liquid volume + actual pyramid
volume of hopper
Side liquid volume = (5.10 x 5.10 x 1.02) m³
= 26.53 m³
Actual pyramid volume of hopper = [(5.10 x 5.10 x 4.42)  3] –
[(1.20 x 1.20 x 1.04)  3] m³

= 37.79 m³
Volume provided = (26.53 + 37.79)  m³
= 64.32 m³ > (Req.: 55.93 m³)
Area provided = (5.10 x 5.10 ) m²
= 26.01 m² > (Req.: 22.37 m²)
Thus, Sedimentation Chamber Area = 5.10 m x 5.10 m

Page 7
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2.8 Sludge Holding Tank

VT x MLSS
Quantity of WAS per day = SLUDGE
- Qavg x SS eff

Cu

where: -
VT = volume of reactor (m3)
MLSS = mixed liquid suspended solid (kg/m3)
SLUDGE = sludge age (days)
Qavg = average flow (m3/day)
SSeff = effluent suspended solid (kg/m3)
Cu = underflow concentration (kg/m3)
120.96 x 3.50
Thus, quantity of WAS per day = - 157.5 x 0.02
30
_

10
= 11.00 m3/day
10
= 1.10 m3/day
Vol. of sludge/day = 1.10 m³
= 11.33 kg/day
th
According to Metcalf-Eddy, 4 Ed. Page 1,536, the main objective of aerobic
sludge holding tank is to reduce the mass solid disposal and VSS reduction range
from 35% to 55%.

Hence, VSS adopted = 35%

35% VSS to be digested = 11.33 x 0.35 kg


= 3.97 kg/day

WAS after VSS reduction = (11.33 – 3.97) kg/day


= 7.36 kg
= 0.72 m³/day

Design for 30 days capacity volume = (0.72 x 30) m³


= 21.45 m³

Hence, volume provided = 1.40 m (W) x 5.10 m (L) x 3.85 m (D)


= 27.49 m³ > (Req. : 21.45 m³)

Thus, sludge holding chamber


area = 1.40 m (W) x 5.10 m (L)

Page 8
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

2.9 Chlorination Chamber

Hydraulic Retention Time = 15 minutes


Design Peak Flow, Qpeak = 769.87 m3/day
Volume Required = (769.87 x 15) ÷ 1440 m3
= 8.02 m3
Proposed Volume of Chlorination
Chamber = 0.50 m (W) x 2.05 m (L) x 2.00 m (D)
x 4 passes
= 8.20 m3 > 8.02 m3 (req.)
Thus, proposed chlorination
chamber = 0.50 m (W) x 2.05 m (L) x 2.00 m (D)
x 4 passes

Page 9
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

3. PLANT LAYOUT PLAN

The summary of all the compartments of the treatment plant are as follow: -

Name of Compartment Area of Compartment

Primary screen 2.10 m x 2.80 m

Pump sump 2.00 m x 2.10 m

Secondary screen chamber 1.00 m x 2.15 m

Grit remover chamber 1.00 m x 3.50 m

Grease remover chamber 1.00 m x 3.50 m

Treatment tank
a) Aeration chamber (2.40 m x 7.20 m) x 2 units
b) Anoxic zone 1.10 m x 5.10 m
c) Sedimentation chamber 5.10 m x 5.10 m
d) Sludge holding chamber 1.40 m x 5.10 m
e) Chlorination Tank (0.50 m x 2.05 m) x 4 passes

Page 10
PDC1/STP/002C/16/LOW/fara TE-F02/PDC 1/Rev.0
Design Calculation w/o Sludge Dewatering Facilities

4. CONCLUSION

Based on the above mentioned drawing,

a) The buffer provided are as follows: -

Plant Fencing/Boundary Buffer Distance Provided

Western Side of STP > 10 m (Lot kosong)

Southern Side of STP 10.00 m (Road)

Eastern Side of STP 10.00 m (Internal Road)

Northern Side of STP > 10.00 m (Lot kosong)

Based on (a) the above table;


(b) the treatment plant layout drawing No: TEN-2102J-
2;
(c) the layout of the plant with respect to the area located as per
drawing No: TEN-2102J-1.
(d) the project and STP location plan PE219-1508/C/SW/01.

Hence, the site area of the plant of 408.77 m2 is sufficient to construct the proposed plant
of PE capacity of 700 persons.