Setup a typical new plant with no CCS. The plant should have 1GW gross output.
How does the net output, capital, operating and breakeven costs; and CO2 emissions change with:
Capacity factor
Steam cycle type – Sub, super and ultra supercritical
Boiler firing type
Cooling type,
Discount rate
What happens to the base values when you install CCS using:
Membranes
Pressure Swing Adsorption
Does this new configuration represent a new plant or a retrofit of the old plant? If you want to
retrofit the old plant – consider how you might do this to ensure the cost of the existing equipment
(which has already been paid for) is not included in your overall costs.
Setup a typical new plant with no CCS. The plant should have 3 GE 7FB turbines.
How does the net output, capital, operating and breakeven costs; and CO2 emissions change with:
Ambient temperature and humidity
Fuel composition – 100% methane, High CO2 - 93.1% CH4, 5%CO2, rest N2 and High C2/C3 –
92.5% CH4, 3.5% C2, 2% C3, rest CO2.
Capacity factor
Turbine type
HRSG outlet temperature – 130, 140, 90
Cooling type – wet cooled, air cooled
Discount rate
What happens to the base values when you install CCS using:
Ammonia