1) Planning for civil works projects requires several preparatory stages including surveys of road conditions, design work, and preparation of bidding documents to allow projects to start on schedule.
2) Detailed surveys are conducted to assess road conditions and identify specific improvement projects, followed by design work and cost estimates to develop work plans.
3) Once budgets are secured, tendering can begin and contracts awarded, with work plans updated for contractor timelines and resource allocation before overall programs are compiled and maintenance and construction works can commence.
1) Planning for civil works projects requires several preparatory stages including surveys of road conditions, design work, and preparation of bidding documents to allow projects to start on schedule.
2) Detailed surveys are conducted to assess road conditions and identify specific improvement projects, followed by design work and cost estimates to develop work plans.
3) Once budgets are secured, tendering can begin and contracts awarded, with work plans updated for contractor timelines and resource allocation before overall programs are compiled and maintenance and construction works can commence.
1) Planning for civil works projects requires several preparatory stages including surveys of road conditions, design work, and preparation of bidding documents to allow projects to start on schedule.
2) Detailed surveys are conducted to assess road conditions and identify specific improvement projects, followed by design work and cost estimates to develop work plans.
3) Once budgets are secured, tendering can begin and contracts awarded, with work plans updated for contractor timelines and resource allocation before overall programs are compiled and maintenance and construction works can commence.
Preparatory Activities The sur vey work is a continuous There are several stages of preparations process carried out on a regular basis before a civil works programme can to monitor t he performa nce a nd 1 commence. These preparatory activities condition of the road network. Equally, will need staff resources and logistical the budget preparations are normally support in order to be carried out in carried out a year in advance and P L A N N I N G A N D P R E PA R AT I O N O F W O R K S
a timely fashion. For this reason, a therefore based on earlier preliminary
schedule of events defining when survey assessments of the road condition and works, design, preparation of bidding required improvement works. When documents a nd t he tendering of specif ic road improvement or new works will take place is prepared. The construction project are proposed, it is figure below outlines the sequence of necessary to carry out a detailed survey preparatory activities required in order specifically for this purpose. to secure that the road works take place at the right time. When the work budgets have been secured, detailed designs and work This time schedule should cover the plans are prepared for each road entire period starting from when works project. With the detailed plans the initial surveys will take place completed, it is possible to commence u nt i l c ont rac t awa rd a nd work s t he tendering process. Once t he implementation. This will ensure that contracts have been awarded, the the preparatory works are completed at detailed work plans need to be updated the correct time before the necessary to (i) reflect the actual time at which the budgets are available and works are contractor can commence works and (ii) intended to start. It also allows for to reflect the specific arrangements of the necessary supervision staff to be resources which the contractor intends mobilised when works are ready to to make. The plans of individual work commence. projects are finally compiled into an BUILDING RURAL ROADS
overall programme describing all works
The first step among the preparatory under the supervision of the road works activities is to establish in detail the agency. composition of the actua l work s requirements. All works planning is This planning and programming exercise based on field surveys where the actual not only applies for construction works condition of the road is established in but also provides the basis for planning detail. Based on what is observed in of road maintenance. The planning the field, it is possible to make specific process should therefore result in two sets suggestions on how to improve the road of plans, one for the annual maintenance and on this basis calculate quantities of progra mme a nd a not her for road work and estimate costs. improvement works. 0 4 2