You are on page 1of 1

Oil & Gas Engineering

Services

DETAILED DESIGN FOR BLACK POWDER FILTRATION UNIT FOR


GTP
SKID FOUNDATION CALCULATION NOTE
CONTRACTOR Document N°: COMPANY Document N°: Rev: 000
55367-OMV-CV-CA-001 NAWGTP-AEI-PF02-220-CV-CLN-00001 Page : 20 of 20

8.2.2. Top Spread


 Inferior bed reinforcement:

Figure 9 : Inferior Reinforcement


For 3.98 cm2/m section  70 HA16, Spacing = 15cm will be adapted

 Superior bed reinforcement:

Figure 10 : Superior Reinforcement


For 3.91 cm2/m section  36 HA14, Spacing = 15cm will be adapted

ALPHA ENGINEERING Intl.


Sahloul III - 4054 Sousse – Tunisia
Code TVA : 950448R/A/M/000. R.C : B279902006
Tél : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249
This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

You might also like