DESIGN PROCEDURE FOR SWIMMING POOLS
EXAMPLE
Swimming pool halls must be designed DanX ventilation plants from Dantherm
and constructed to comply with a number have all the features needed to comply
of demands, requirements and needs. with all the above-mentioned demands
When considering the design of the and provide an ideal solution.
building, environmental demands must be
taken into consideration just as the These plants are specifically designed for
interests of the various groups of users use in swimming pool halls. They are
must be considered. flexible, resistant to aggressive
atmospheres and they provide energy-
Today a swimming pool hall is not only for saving ventilation and dehumidification,
the sportsman requiring competition and exact control of the parameters which
pools of international dimensions. There can be expected in swimming pool halls.
must be room for general exercise
swimming, family fitness and fun, Swimming pool halls also incorporate
relaxation and socialising. other areas, such as changing rooms,
bathrooms, cafeteria etc. The demands
During the design process, consideration on the interior climate in these areas are,
should be given to the following of course, all different and they will
requirements: typically be connected to separate
■ Competition use. ventilation plants. Whatever the mix of
■ Leisure use. requirements may be, the DanX range
■ Diving facilities. offers a perfect solution which can be
■ Spa and therapy use. individually tailored to suit a particular
■ Wave generation and other water project.
movement techniques such as chutes
and rapids.
3
VENTILATION & DEHUMIDIFICATION IN SWIMMING POOL HALLS
4
exchanger from freezing. Using a mixing box
thus offers several advantages.
DANTHERM DEHUMIDIFIER
Dantherm has a wide range of
dehumidifiers. As mentioned above, the
DanX plant incorporating a heat pump can
be used as a dehumidifier. The principle is
the same as smaller dehumidifiers which DanX with heat pump
recirculate air (such as those described on
pages 10 and 11), which are used in private
swimming pools. The principle is shown on
the drawing below. The air from the hall is
drawn in and passed through a dehumidifier.
It then passes over evaporator coils where
the air is cooled down to a temperature
below the dew point allowing water vapour
to condense into water droplets which are
collected in a drip tray. The air flow then
passes through a compressor and, if fitted,
a water-cooled condenser. Having passed DanX with heat pump and mixing box
through a warm condenser coil and an after-
+ +
5
DESIGN PROCEDURE FOR SWIMMING POOLS
When choosing reasonable operating can be maintained. This process has the
conditions, moisture problems potential to use a great deal of energy so it is
as well as operational essential to recover as much heat as possible
expenditure can be from the exhaust air, and to avoid changing air
controlled. To minimise more than is necessary. A DanX heat recovery
evaporation rates the system complete with controls is the ideal
pool hall temperature device for providing energy efficient, cost
should always be higher effective control of the swimming pool hall
than the pool water environment.
temperature. The higher
the temperature differential DESIGN PROCESS
between air and water the lower the The first step is to calculate the evaporation
evaporation rate from the pool surface. rate, and then on the basis of this determine
However, in order to maintain a reasonable the necessary maximum fresh air volume
operating economy, the difference should not required. These are then used to determine the
be bigger than 2-3°C. size of the DanX to be installed.
In public swimming pools the pool hall air Evaporation from the pool surfaces and the
temperature is usually 29/30°C with the water surrounding wet areas is the main contributor
temperature a degree or two below that. to the moisture problem. The quantity of
Hydrotherapy pools usually have a water evaporation depends on such factors as pool
temperature of 35-37°C. area, water temperature, air temperature,
humidity, air velocity, and the bathing activity.
VENTILATION WITH HEAT RECOVERY There are many formulae and rules of thumb
The object of the ventilation plant is to that profess to calculate evaporation rate. In
maintain the design temperature and humidity, the examples below we have used the German
and to secure good air quality within the pool calculation formula VDI-2089 which states the
hall. Air in a swimming pool hall will always required data for the design of indoor
have a moisture content higher than that of swimming pools. The calculations have been
outside air. It follows therefore that by converted to the tables shown below, including
introducing a calculated amount of fresh air quick-selection charts as well.
into the pool hall the desired relative humidity
6
The evaporation rate is calculated as follows: Necessary air change
W = ε x A x (PB – PL) (g/h) The fresh air volume, required to remove the
evaporation can be calculated as follows:
A = Pool surface area (m2)
mL = mw
PB= Saturated vapour pressure at water (xu – xi)
temperature (hPa)
mL = Mass flow, outside air (kg/s)
PL= Partial vapour pressure at air mW = Mass flow, exhaust air (kg/s)
temperature/% RH (hPa)
xu = Moisture content, outside air (g/kg)
ε = empirical factor g/(hhPa m2 h): xi = Moisture content, inside air (g/kg)
0,5 covered pool surfaces The moisture content of the outside air (xu) varies
5 calm surface according to the season of the year – from a
maximum of 11 - 12 g/kg in the summer to 2 - 3
15 private swimming pool, not very occupied g/kg in the winter.
20 public swimming pool, normal activity In practise xu should be set to no less than 9 g/kg
28 leisure pool which will only be exceeded for 15% of the year
and which is also recommended by VDI-2089.
35 wave pool
Besides condensation problems are rare in the
On basis of the formula and ε= 20 we have made summer and the water content xi of the inside air
the diagram below to make the work easier. can therefore be a little higher.
7
CORRECT AIR DISTRIBUTION
The air movement and especially the air on the fourth. It is important to
distribution of supply air into a swimming emphasise that all surfaces (especially
pool hall is of great importance, of equal glazed areas) require an adequate supply
importance to that of designing the of air to prevent condensation from
ventilation system with the correct air forming.
volume.
On the other hand air movement above
Protection of the building fabric is the the pool surface should be kept as low as
primary objective of a swimming pool possible, as the air movement influences
ventilation system. The conditioned air evaporation. The more saturated the air is
supplied to a pool hall is warm and dry immediately above the pool surface the
and does not condense as easily as less water can evaporate.
stagnant air, which has had time to cool
off. The incoming conditioned air should Furthermore it is important that the
ideally be supplied from low level around pressure in the pool hall should be
the perimeter of the pool hall on three slightly lower than outside in order not to
sides and then extracted at higher level press the vapour out into the fabric of the
8
D ATA
The DanX exhaust air heat pump is a fresh addition to that a wide range of
air ventilation system that recovers accessories is available to cover the
normally wasted energy. It is a modular various needs.
system that uses a range of standard
options that allow a design to be as CONTROL
simple or as sophisticated as is required. The control of the DanX unit is based on
All types are mounted in a strong frame a modern DDC control which makes it
construction with insulated cover panels possible to control all the functions of the
made of galvanised plates. For use in plant optimally. This kind of control offers
more aggressive environments, as for a variety of options and nevertheless it is
instance in swimming pool halls, the DanX easy and simple to use thanks to the well-
plants can be supplied with powder
enamelled cover plates.
Dimensions in mm
XK XWP VV & VF F B
Model w d h* w d h* w d h* w d h* w d h*
3/6 1707 880 1760 2270 880 1760 985 880 1760 880 880 916 475 880 1760
5/10 1707 1400 1760 2270 1400 1760 1200 1400 1760 1400 1400 475 475 1400 1760
7/14 1707 1900 1920 2270 1900 1920 1290 1900 1920 1900 1900 475 475 1900 1920
9/18 1920 1800 2350 2500 1800 2350 1550 1800 2350 1800 1800 600 600 1800 2350
12/24 1920 2200 2550 2600 2200 2550 1400 2200 2550 2200 2200 600 600 2200 2550
16/32 2650 2200 2800 3529 2200 2800 1500 2200 2800 2200 2200 700 700 2200 2800
*Excludes base and adjustable feet 145–200mm common to all models
9
SMALL SWIMMING POOLS
DEHUMIDIFIER
TYPE CDP
Dantherm has a range available in two sizes and it is easy to
of small dehumidifiers install. Control is taken care of by a room
especially designed for hygrostat.
dehumidification of
smaller swimming Evaporation is calculated as described on
pool halls. The CDP the previous pages. As the activity in a
dehumidifier is private swimming pool is not as high as in
designed to blend well a public swimming pool, the evaporation
into the interior of private swimming will be lower too, and this is allowed for
pools where its only purpose is to in the calculation formula. For this speci-
dehumidify the room. The dehumidifier is fic field it is easier to use a selection chart.
10
and from the pool hall. The units can be
supplied with after heating coils which
will contribute to the
heating of the room.
Control is governed by
a thermostat and a
hygrostat.
Denmark
A/S Dantherm
Jegstrupvej 4
DK-7800 Skive
Tel: +45 97 52 41 44
Fax: +45 97 52 61 34
EUROPEAN CONTACTS
England
Dantherm Limited
Hither Green
Clevedon
North Somerset
BS21 6XT
Norway
A/S Dantherm
Løkkeåsveien 26
N-3135 Torød
Tel: +47 33 38 58 00
Fax: +47 33 38 51 91
Sweden
AB Dantherm
Kabelgatan 12
S-43422 Kungsbacka 1
Dealer network
throughout Europe.
08/97