Approximate
Acquired Area
SN Structure/Support Facility Acquisition Area
(ha)
(ha)
1 Reservoir Area (Upto EL. 275.0) 63.7
2 Barrage Area 1.46 1.14
3 Project Colony 1.26
4 Muck Disposal Areas 2
5 Intakes, Powerhouse & Tailrace Area 1.26
6 Internal Access Road & Bridge 3
7 Construction Material Storage Area 1
8 Mechanical Yard/Workshop 0.5
9 Batching Plant 0.5
10 Contractor Camp and Labor Camp 2
11 Aggregate Crushing Plant and Storage Area 2.5
Total Area 79.18 1.14
Total Area Required 78.04
ct
Nature of Acquisition
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Temprorary
Temprorary
Temprorary
Temprorary
Temprorary