Q&HSE DEPARTMENT
B-228, OKHLA INDUSTRIAL AREA PHASE - 1
NEW DELHI - 110020
Phone: +91-11-42785500
Fax: +91-11-42785512
Email: gdc.delhi@airtelmail.in, cdricsharma@gdcl.in
Website: www.gannondunkerley.com
HAZARD IDENTIFICATION
AND RISK ASSESSMENT
HIRA REGISTER
(AS PER OHSAS 18001:2007 OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEM)
HSER – 001
ISSUE 04/2013
Note: This manual is the property of Gannon Dunkerley & Co., Ltd. and is not to be reproduced in part or full without the permission of
Managing Director / Management Representative.
Version: 0.04 Dated: 26.09.2013 Page 1 of 1
Gannon Dunkerley & Co., Ltd.
Health, Safety and Environmental Manual Module HSER
No. 001
REV No. 2
INDEX
No.
0 COVER PAGE 1
1 INDEX 2
2 DISTRIBUTION LIST 3
3 DEFINITIONS 4
6 HIRA FORMAT 14
101 to 199 For sites and functions controlled by Delhi Division, New Delhi, AMR Delhi Division
201 to 299 For sites and functions controlled by Mumbai Division, Mumbai, AMR Mumbai Division
301 to 399 For sites and functions controlled by CED, Kolkata, AMR Kolkata CED
401 to 499 For sites and functions controlled by CED, Hyderabad, AMR Hyderabad CED
501 to 599 For sites and functions controlled by WTD, New Delhi, AMR WTD
Note:
a.) The distribution of the IMS Manual, Procedures, Work Instructions and forms of Railway RCC Sleeper Factory, Rayagada, is done as per
details given in the Sleeper Factory Manual.
b.) Copy no 101 onwards are assigned to controlled copies of the manuals that are issued to each site/department by the Associate
Management Representative of the respective Divisions as per procedure and controlled by them.
Gannon Dunkerley & Co., Ltd.
Health, Safety and Environmental Manual Module HSER
No. 001
REV No. 1
DEFINITIONS
ACTIVITY:
Broad group of Tasks.
CONSEQUENCE:
Severity of Injury or Damage.
CONTROL MEASURES:
Methods of controlling the Hazard.
HAZARD:
Source, situation or act with a potential for harm in terms of Human Injury or Ill
Health, or a combination of these.
RECOVERY MEASURES:
Measures to reduce the gravity of consequence and regain control if an undesired
event or emergency situation arises.
TASK
Any work conducted on the basis of a fixed procedure.
Gannon Dunkerley & Co., Ltd.
Health, Safety and Environmental Manual Module HSER
No. 001
REV No. 1
HIRA INTRODUCTION
HAZARD MANAGEMENT PROCESS
Comprises of:
HAZARD CONTROL
a. Wearing of PPE
b. Training and instructions related to the job
c. Obtaining work permit if applicable
d. Conducting Toolbox Meetings
e. Deploying right person for the right job
f. Good Housekeeping
g. Keeping adequate warning signs and barricading etc.
h. Use of recommended tools and equipment
i. Adequate and effective supervision
RECOVERY MEASURES
In case any undesired event or incident does happen at the work site or labour
camp, inspite of essential precautionary measures in place, (may be due to at-
risk behavior of individuals) such emergencies shall be handled in such a way
as to reduce the gravity of consequence (Severity of human injury or property
damage) and to regain control over the situation within the least possible time.
The following will be the action plan in such contingencies.
In the case of major events such as fatalities, severe injuries, fire and explosion,
leakage of toxic gases, and natural calamities etc. the work will be stopped
immediately and emergency response procedure will be adopted to control the
situation.
The incident will be reported to the client / local authority etc. by the easiest
available means, seeking assistance and resources to handle the situation.
Further work will be resumed only on getting clearance from the Emergency
Controller. A special emergency meeting of the work force shall be convened to
explain the incident, the immediate and underlying causes (if identified), the
learning points and corrective actions required to prevent reoccurrence of similar
incident.
A First Information Report (FIR) shall be sent to MD’s Office and Divisional
Office within Four (4) hours of occurrence. Subsequent investigations shall be
completed and Detailed Investigation Report (DIR) furnished to all concerned
within Seven (7) days.
In less serious cases, medical aid shall be given to the injured victims, if any,
and the matter intimated to the concerned authorities.
The following hazards have been identified as existing or likely to exist in the
Project Site area:
• Hydrocarbons
• High pressure liquids and gases
• Heavy Plant
• Road Transport Vehicles
• Material Handling (Manual and Mechanical)
• Rock Breaking
• Working at Heights
• Working at OH Lines
• OH Line pole erection and stringing
• Electrical tools / equipment
• Static Equipment
• Steel Bar bending and cutting
• Trenching and Underground Services
• Radiation
• Spillage
• Confined Space
• Blasting, Coating and GRE lining
• Manual Operations (cutting, grinding and welding etc.)
• Heat, Dust, Vibration and Noise
• Concreting
Gannon Dunkerley & Co., Ltd.
PROCEDURE Procedure for Hazard Identification & Risk Assessment and
HSEP – 001 development of Risk Control Measures (HIRA)
1. INTRODUCTION
This procedure is primarily concerned with personal injury and ill health risks and
does not address damage to plant and equipment, except when such damage may
injure people. The task of risk assessment should involve both identification of the
hazards and undertake an evaluation of the impacts of the risks involved.
2. PURPOSE
3. SCOPE
4. RESPONSIBILITIES
The overall responsibility of ensuring success of risk control measures remain with
the Divisional Heads and Divisional HSE Managers.
Project Site In-charges, Engineers and Supervisors are responsible for the effective
implementation of this procedure by identifying the hazards in all the activities at
their Project Site, assessing the risk associated with the identified hazards, rating
the risk and initiating the Risk Control Measures.
5. REFERENCES
6. PROCEDURE
Project Site In-charges shall constitute a core group for conducting Hazard
Identification and Risk Assessment of all Project Site Activities before the activities
are performed at the Project Site. The Process of Risk Assessment is based on the
steps described here.
B. Assessment of Risk
Following steps are used to identify, assess and control the identified hazards at
work place:
a. Collect information about existing hazards and potential hazards for all the
Project Site activities
b. Assess the Risk
c. Set priorities
d. Communicate information about the hazards and risks
e. Develop, select and implement controls and monitor their effectiveness
f. Maintain Records
Risk Level and Risk Rating is obtained from the Risk Rating Matrix Table P1.2.
The assessed risks with a risk rating of 1 or 2 are within the tolerable limit.
A risk rating above 2 (that is 3, 4 or 5) is considered as intolerable (or un-
acceptable) risk.
The higher the number, the higher is the risk.
This will assist in deciding the priorities for risk control measures.
Project Site In-Charges shall review HIRA Register for effectiveness at-least once a
year or after any LTI at Project Site Location.
GDCL Procedure for Hazard Identification and Risk Assessment and
Development of Risk Control Measures
3 3 6 9
2 2 4 6
SEVERITY FACTOR
1 1 2 3
0 1 2 3
PROBABILITY FACTOR
TABLE P 1.3 INTERPRETATION OF THE RISK RATING
In practice, all these methods mentioned above are used in Construction Industry.
Also it is important to
ACTIVITY:
1 2
3 4
S. Activity Hazard Consequence Probability Severity Existing Risk Control Revised
No. Factor Factor Risk Rating Measures Risk Level
Level = P x S (after
Control
Measures)