Cheikh S M Moustapha Djamil Seck

Weekly Report for week 3

Date Duties/Tasks Performed Remarks by Supervisor


For today, I was getting familiar with Prota steel in order to start
the design of the portal frame. I watched few tutorial videos on
29/6/2020
YouTube. Moreover, I was rearranging my CV as it was required.

I printed all the plans and I started the design with prota
30/6/2020 structure.

We hold a meeting at MTC with Doctor Salmaliza. Some


information and clarifications was done. Therefore, I can
1/7/2020 continue my task.

I start to design of the portal frame with prota structure.

2/7/2020

3/7/2020