You are on page 1of 1

01 SHEET OF 08

Review Levels Legend:


Type of Instruments Alert Levels Work Suspension Level Pre Determination Levels Remarks Depth Monitoring Frequency Contingency Measures Instrumentation Layout Plan Symbol Quantity BUILDING AND CONSTRUCTION AUTHORITY
Inclinometer (INC 01, 05 & 06) 35mm 50mm --- --- 15m Twice a week during excavation and Upon reaching alert level: Upon reaching suspension level: Inclinometer I 6
APPROVED UNDER SECTION 5/SECTION 5A OF THE
BUILDING CONTROL ACT (CHAPTER 29)
Inclinometer (INC 02, 03 & 04) 28mm 39mm --- --- 15m once a week during upcoming stages -Increase monitoring frequency - Stop all excavation works and backfill the affected location Water Standpipe W 6
Water Standpipe 2m --- 3m --- 10m -Visual inspection of adjacent - Increase monitoring frequency Piezometer
Monitoring stopping criteria: 6 PROJECT REF. NO.: A1995-00005-2019-ST50
10m buildings/ utilities - Review the design.
Piezometer 20 kPa --- 30 kPa --- · 3 consecutive stable readings after Ground Settlement Markers 16
- Install additional strut if required based on design review
Ground Settlement Markers 21mm --- 30mm --- --- completion of ERSS works. Strain Gauge SG 6
results
· Final instrumentation report
Building Settlement Markers 10mm 15mm --- --- --- Vibration Meter --
assessment by QP (ERSS). FOR COMMISSIONER OF BUILDING CONTROL
Tilt Plate 1/700 1/500 --- --- --- Building Settlement Markers 9
Noise Meter --- --- --- --- --- Tilt Plate T 9

3
07
Vibration Meter --- --- --- --- --- Noise Meter --

12
Prism --- --- --- --- Prism P --
All direction

20
20
GENERAL NOTES: (Unless Otherwise Stated)
1. All temporary works drawings are to be read in conjunction with all relevant Architectural and Structural drawings. All discrepancies shall be reported immediately to the Engineer.
2. The contractor shall check all dimensions before fabrication & any discrepancy shall be reported to Engineer.
3. All structural steel should be of Grade BS EN 10025 S275 & conform to latest BC1(Class 1) & designed in accordance with SS EN 1993.
4. All bolts shall be G8.8 in 2mm clearance holes to SS EN 1993-1-8. WI
SH
5. All welding shall be done in accordance with SS EN 1993-1-8 & electrodes to SS EN 1993-1-8. All fillet weld shall be all round the member. SITE AR
TR
6. All welding shall be minimum 10mm fillet weld. OA
D
7. All connection between steel members to be fillet weld.
8. Min 15% fillet weld shall be tested by magnetic particle flaw detection tests.
9. All butt welds locations shall be tested by ultrasonic or radiographic tests. W
10. All steel members indicated are the minimum section required, alternative section with equivalent or higher strength may be proposed by the Contractor but subjected to the Engineer's
ES
T CO
approval.
11. All piling works should be supervised full time by RE/RTO and as built pile lengths shall be submitted to Engineer for review prior to any excavation works. AS
12. If the structure member is recycled, the material strength and condition report must be submitted to Engineer for acceptance prior to the field installation.
T HI
13. For kingpost vertically, a deviation of 1 in 75 shall not be exceeded and also shall not deviate more than 75mm from the designed positions at cut-off level. GH
W TE
14. All temporary slope to be protected by 50mm thk. lean concrete. AY LO

D
15. All backfill shall be compacted sandy material or compacted good soil or other material subject to PE's approval. K

OA
16. Concrete packing shall be minimum C16/20. BL

ER
AN
17. The sheet piles will be installed and extracted using silent pile near the existing building and the sheet pile shall be interlocking including corner. The contractor shall submit the shop

RS
GA

MO
drawing with interlocking detail and mitigation measure in the event that interlocking is not achievable. H
18. The existing boundary walls around the development shall be protected with proper approved Measures. RO
19. If splicing is required for struts and walers, the splice shall be able to take the full strength of the corresponding member.
AD
20. All sheet pile shall be new, if the structure member is recycled, the material strength and condition report must be submitted to engineer for acceptance prior to the field installation.
21. Sheet pile shall be welded (crimped) to have effective interlocking.
22. All backfill shall be compacted sandy material or compacted good soil or other material subject to PE's approval.
23. Contractor shall immediately backfill and notify the Engineer if water or soil ingress is observed during excavation.
24. Refer to the interface zone of Section-A & B area, needs to excavate down at S2 Level of section A and then complete Section-A excavation/backfilled first, prior to excavation to below S2
level of Section-A for section B.

N
LOCATION PLAN
NTS

DATE
NO DESCRIPTION
SIGN
STANDARD CERTIFICATION ON STRUCTURAL PLANS AND DESIGN STANDARD CERTIFICATION BY THE QUALIFIED PERSON FOR
CALCULATIONS BY THE QUALIFIED PERSON FOR STRUCTURAL WORKS GEOTECHNICAL ASPECTS OF GEOTECHNICAL BUILDING WORKS REVISION
STANDARD CERTIFICATION ON STRUCTURAL PLANS AND STANDARD CERTIFICATION BY THE SPECIALIST ACCREDITED CHECKER
DESIGN CALCULATIONS BY THE ACCREDITED CHECKER DEVELOPER:
1. In accordance with Regulation 10A of The Building Control Regulations,
1. In accordance with Regulation 9 of The Building Control Regulations, 1. I, CHOW WENG LEE , b eing a registered specialist accredited checker,
I, LIU XIANMING , the Qualified Person for structural works appointed
I, LIU XIANMING , the Qualified Person for the geotechnical aspects of the
1. I, SOH LIAN SENG , (ACCREDITED CHECKER) hereby certify that I GDL PROPERTIES PTE LTD
geotechnical building works appointed under section 8(1)(d)(i) or hereby certify that I have in accordance with the Building Control
under section 8(1)(a) or 11(1)(d)(i) of the Building Control Act, hereby have carried out an evaluation, analysis and review of the detailed (Accredited Checkers and Accredited Checking Organisations)
456 ALEXANDRA ROAD #02-09
11(1)(d)(iii) of the Building Control Act, hereby submit the geotechnical
submit the detailed structural plans and design calculations prepared by structural plans and design calculations presented herein and am Regulations carried out an evaluation, analysis and review of the plans of FRAGRANCE EMPIRE BUILDING
building works plans and design calculations prepared by me and certify
me and certify that they have been prepared in accordance with the satisfied that there are no inadequacies in the key structural elements. the geotechnical building works attached, and to the best of my SINGAPORE 119962
that, to the best of my knowledge and belief, they have been prepared in
provisions of the Building Control Regulations, the Building Control Act knowledge and belief the plans do not show any inadequacy in the
accordance with the provisions of the Building Control Regulations, the
and any other written law pertaining to buildings and construction for the 2. I further certify that these detailed structural plans and design calculations geotechnical aspects relating to the geotechnical building works if carried ARCHITECT:
Building Control Act and any other written law pertaining to buildings and
time being in force. are in reference to Project Ref. No.: A1995-00005-2019-ST50 . out in accordance with those plans.
construction for the time being in force. DP ARCHITECTS PTE LTD
2. I further certify that these detailed structural plans and design calculations 3. Total number of structural plans checked : 08 2. I append my Evaluation Report (comprising 177 pages) as well as the 6 RAFFLES BOULEVARD,
2. I further certify that these geotechnical building works plans and design
are in reference to Project Ref. No: A1995-00005-2019-ST50 analyses and calculations I have perfomed in carrying out the evaluation, #02-249 MARINA SQUARE
calculations are in reference to Project Ref. No: A1995-00005-2019-ST50
4. I hereby declare that I have no professional or financial interest in the analyses and review of the geotechnical reports and design calculations SINGAPORE 039594
3. Total number of structural plans submitted : 08 building works shown in the plans as defined in section 18 of the Building are in reference to Project Ref. No.: A1995-00005-2019-ST50 .
3. Total no. of geotechnical building works plans submitted : 08 and
Total number of pages of design calculations in this book: 220 Control Act (Cap 29).
total no. of pages of design calculations in this book: 220 ENGINEER:
3. I hereby declare that I have no professional or financial interest in the
S ION A L E NG ION A L E NG
geotechnical building works shown in the plans as defined in section 18 ERSS CONSULTANTS PTE LTD
ES I
ES
S
I
of the Building Control Act (Cap 29). 73 Ubi Road 1, #06-49,
NE
F

ACCREDITED CHECKER
PRO

NE
F

Oxley Bizhub, Singapore 408733.


PRO
E

SPECIALIST
ER
R

No: 1158 ACCREDITED CHECKER Tel: 6844 9849


CIVIL GEOTECHNICAL Fax: 6844 9439 ACCREDITED
CERTIFICATION

LIU XIANMING SOH LIAN SENG No: 7034 Email: mail@erssc.com.sg


CERTIFICATION
INTERNATIONAL SAC
BODY

C ert No : QS - 19 99 - 05

LIU XIANMING in AC Organisation


ISO 9001 : 2008
Cert No . CIS/100104 Member of the IAF MLA for QMS

4296 Registration No: A061


4296 CHOW WENG LEE PROJECT:
BUILDING CONTROL ACT
SI N E
G AP OR SI N
G AP OR
E SINGAPORE BUILDING CONTROL ACT PROPOSED ERECTION OF 1 BLOCK OF 5
SINGAPORE
STOREY WITH ATTIC HOTEL (180 ROOMS),
Accredited Checker 's Signature and Stamp
Qualified Person for Structural Works 's Signature and Stamp Qualified Person for Geotechnical Works 's Signature and Stamp Date:
Specialist Accredited Checker 's Signature and Stamp ANCILLARY FACILITIES AND CARPARKS ON
Date: Date: Date:
LOTS 03328C AND 04198A MK 01 AT TELOK
BLANGAH ROAD (BUKIT MERAH PLANNING
AREA)
DRAWING TITLE:

LOCATION PLAN AND


INSTRUMENTATION REVIEW LEVEL

DRAWING NO: REVISION


ERSS/2005/ST50/PL01
-

DRAWN YOON SCALE AS SHOWN

DESIGN ZWL DATE MAR 2020

CHECKED LXM FILE NAME 2005