You are on page 1of 2

1.

TODAY SCOPE OF WORK


 CHANGE 3 LIFERAFT ON STARBOARD SIDE
 DECK PAINTING
2. PLAN & METHODE STATEMENT
 A GENTLE REMINDER GUYS, ALL THE WORK TO BE DONE SHOULD Base on te existing
latest and therefore iwould like to emphasize , its very importance to understand the
contain of the JHA . JHA Will Tell us the
- Job step sequence
- Potential job step hazards
- The risk assessment
- Job step control or action
3. Equipment and material used for the task

 Paint
- I would like to remind you all once again, that Paint we have potential hazard ,
its flammable liquid , harmful if inhaled & Also May Causes serious Irritiation on
skin & eyes contact . please see the Safety data sheet of Jotun paint & Thinner
before job painting begin.
- The paint is Marine Polutant ,in case spill to Main deck please use absorbant or
Cotton Rug To Absorb spillage then Place to Appropriate waste Disposal
container.
4. Man Power and Skill Involved
- AB1 & AB2 , To Paint The deck, Trainee Gangway Watch
5. Permit to Work
6. Discuss what Can Go Wrong/Risk during the wark carry out
 Fire
 Eye & Skin Irritation due to contact with Paint
 Pollution
 Dehydration
 Fatigue
7. Discuss what can Cause it go Wrong/Potentioal hazards during the work carry out
 Flamable Subastance
 Poor House keeping
 Exposure of Weather
 Not wear Proper PPE
 Hot Weather outside
8. Discuss What Can be done the prevent the hazard
 Housekeeping to be implemented daily
 Working in Buddy System and Good Comunication
 Always comply , standard , procedure & rules
 Intervene on unsafe or non compliance action & Situation
 Have the right Attitude then put safety above everything else and care for each other
 Just Encase if you get involving the manual handling, don’t forget with 6 hand free rules
 No Hand on Loads
 Hand on Handle Only
 Permission to touch 20 Kg
 Hand off.. Energy On
 Safe Cargo Loading
 Impact Resistance Gloves
 Please Bear In Mind if you see any lifting activities, BSP Color Coding for this January
2018 is Green
 Stop Working Policy
 It our duty to stop any work which we believe to be unsafe
 Remember when you stop somebody from his work.. please in proper manner
9. Please be reminded that we are subject to follow the existing rules such as
 BSP 12 Saving rules
 PTAs 13 House rules
 Failure to comply with any rules will result appropriate disciplinary action from
management
10. The contingency plans or the recovery measure in case of any serious injury please contact the
nearest first Aider or
 Emergency number 991 Ambulance
 SMR Duty Captain
 Today is no emergency drill, Please proceed to assembly Point /muster station in case of
emergency
11. To alert
12. Relevant previous accident is Head injury from Pairs Slip and Fall while do Repair Azimuth
Truster on Work Boat. As per investigation it cause Working area was slippery due to oil
dripping from Azimuth drive unit during work, and the casualty Was worn Safety Helmet
Without Chin Strap
13. I hope You all understand
14. Do you Have any Question Please ?
15. Do You Have Any Issue With PPE ?
16. Very Good and thank you for your attention & Participant toolbox talk this morning
17. Rember you are responsible for the safety of those around us !!
18. Remember our Commitment .. YOU & I Will Go Home Safely..

You might also like