Objective questions answers
(1) Hardwire control means?
(A) Controlling the hardware with the help of software.
(B) Controlling the plant with relays contactors etc. without any
programmable controller
(C) Controlling the plant with relays contactors etc. with programmable
controller
(D) None
(2) Solenoids, lamps, motors are connected to
(A) Analog input
S7 PLC
(B) Analog output
(C) Digital input
EtherNet/IP
(D) Digital output
(3) How the instruction -] N [- in the PLC language work?
(A) It detects the signal state from 0 to 1. Our Function Blocks
(B) It detects the signal state from 1 to 0 and remains close till signal is 0.
(C) It detects the signal state from 1 to 0 and remains close for one scan makes it possible for
cycle only. Siemens S7 300, S7 400,
(D) When signal state is 1 this instruction remains close.
(4) Full name of DCS is? S7 1200 & S7 1500 PLC's
(A) Designed Control System
(B) Distributed Control System
(C) Display Control System
(D) Dedicated Control System
(5) For PLC’s scan cycle which one is correct?
(A) Program execute Output write Input read Sigma NSW Pty Ltd
(B) Input read Output write Program execute
(C) Output write Input read Program execute
(D) Input read Program execute Output write Forum
(6) CPU 1214C has __ integrated digital inputs and __ digital outputs
(A) 10 & 12 PLC SCADA learining
(B) 12 & 14
(C) 12 & 10 Category
(D) 14 & 10
Industrial automation
(7) Programming language for PLC is..
(A) Function Block Diagram (FBD) PLC example programs
(B) Statement list (STL)
SCADA system
(C) Ladder
(D) All of the above.
(8) What is full name of SCADA? Contact Form
(A) Supervision Control and Data Acquire
(B) Supervisory Control and Data Administration Name
(C) Supervisory Control and Data Acquisition
(D) Super Control and Data Acquisition
Email *
IW 96
(11) PLC’s analog input/output has. Total Pageviews
(A) 1 bit address
(B) 1 byte address 3 4 2 1 8
(C) 1 word address
(D) 1 double word address Followers
(12) The PLCs were originally designed to replace..
(A) Analog controllers Followers (3)
(B) DCS
(C) Microcomputers
Follow
(D) Hardwired control
https://plcscadaacademy.blogspot.com/p/v-behaviorurldefaultvmlo.html 2/5
7/6/2020 PLC Objective questions answers ~ PLC SCADA ACADEMY
(13) In Counter when CV is equal to or greater than PV, then Blog Archive
(A) CU bit will set
(B) CU bit will reset ▼ 2020 (32)
(C) QU bit will reset ▼ June (9)
(D) QU bit will set ▼ Jun 28 (4)
(14) In S7-1200, we define Timer value (PT) as ____________. Clock memory function in the S7-1200 PLC.
(A) T#1s (B) T1 (C) IEC 0 (D) Make test mode and manual mode in the
S5t#1s system.
(15) When signal state changes from 0 to 1 in LD input of CTD (down counter), Automatic overhead tank system.
then…
Level indications in the HMI for the water
(A) CV will reset tank.
(B) PV will reset
(C) The value at CV is set to the value of PV ► Jun 21 (4)
(D) The value at PV is set to the value of CV
► Jun 13 (1)
(16) A control valve will receive _____ signal from an analog output module is
► May (12)
the count is 27648. The module is configured for 0 to 10V.
(A) 10V (B) 5V (C) 8V (D) ► April (9)
7.5V ► March (2)
(17) The Real Data type comprises of _______ Bits.
(A) 8 (B) 16 (C) 32 (D) ► 2019 (30)
6
► 2018 (111)
(18) Answer the following considering the network shown.
(20) How many Signal modules we can connect in 1214C CPU? ______
https://plcscadaacademy.blogspot.com/p/v-behaviorurldefaultvmlo.html 3/5
7/6/2020 PLC Objective questions answers ~ PLC SCADA ACADEMY
(A) 8 (B) 10 (C) 32 (D) 11
(21) From following, which CPU is not available for S7-1200 PLC? ______
(A) 1211C (B) 1212C (C) 1213C
(D) 1215C
(22) Which answer names all the memory bytes addressed with MD 200?
(A) MW 201,202 (B) MB 200 (C) MB
200,201,202,203 (D) MB 200,201
(23) TIA Portal Software has Portal View &project View.
0 comments:
Post a Comment
Industrial IoT
Synching MES/ERP/SCADA with remote production equipment
using HTTP/OPC/MQTT interface.
Home
https://plcscadaacademy.blogspot.com/p/v-behaviorurldefaultvmlo.html 4/5
7/6/2020 PLC Objective questions answers ~ PLC SCADA ACADEMY
Basic NOR gate operation explanation using electrical wiring diagram and PLC ladder
diagram
Application:- In electrical panel there are two switches given for panel ON lamp.
Both the switches are optional, the lamp can be OFF eith...