You are on page 1of 30

CALCULATION SUMMARY

Project Name : FAS Building7 Project Location: Kragujevac, Serbia

Drawing No. : City:

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(m²) (l/min) (bar) (l/min/m²) (bar) (l/min) # (l/min) (bar)

Required
2 Demand (HW) extra hazard 231.8 7514.03 24 1.51 198.72 28 1900 1.24
7.72

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : FAS Building7

Contract No. : City:

Project Location: Kragujevac, Serbia Date: 8/9/2014

Contractor Information
Name of Contractor:

Address: City:

Phone Number: E-mail:

Name of Designer:

Authority Having Jurisdiction:

Design
Remote Area Name 2

Remote Area Location Riser2

Occupancy Classification extra hazard

Density (l/min/m²) 24

Area of Application (m²) 231.8

Coverage per Sprinkler (m²) 8.3

Number of Calculated Sprinklers 28

In-Rack Demand (l/min) 0

Special Heads

Hose Streams (l/min) 1900

Total Water Required (incl. Hose Streams) (l/min) 7514.03

Required Pressure at Source (bar) 7.72

Type of System Wet

Volume - Entire System (l) 263054.8 l

Water Supply Information


Date DD/MM/YYYY

Location pump station

Source W1

Notes

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : FAS Building7 Node Labels: Node Reference
Pipe Labels: Off

Diagram for Design Area : 2


(Optimized Hydraulic Simplified)

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : FAS Building7

Hydraulic Analysis for : 2


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (N/m³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (Pa·s) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (l/min) Pressure (bar)


0 9.75
7571 8.95
11356 7.64

Hoses
Inside Hose Flow / Standpipe Demand (l/min) 0

Outside Hose Flow (l/min) 1900

Additional Outside Hose Flow (l/min)

Other (custom defined) Hose Flow (l/min) 0

Total Hose Flow (l/min) 1900

Sprinklers
Ovehead Sprinkler Flow (l/min) 5614.03

InRack Sprinkler Flow (l/min) 0

Other (custom defined) Sprinkler Flow (l/min) 0

Total Sprinkler Flow (l/min) 5614.03

Other
Required Margin of Safety (bar) 0

W1 - Pressure (bar) 7.72

W1 - Flow (l/min) 7514.03

Demand w/o System Pump(s) N/A

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : FAS Building7

Hydraulic Analysis for : 2

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 5
Job : FAS Building7

Hydraulic Analysis for : 2

Graph Labels
Values
Label Description
Flow (l/min) Pressure (bar)
S1 Supply point #1 - Static 0 9.75
S2 Supply point #2 7571 8.95
S3 Supply point #3 11356 7.64
D1 Elevation Pressure 0 1.25
D2 System Demand 7514.03 7.72

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (bar) Flow (l/min) Pressure (bar) @ Flow (l/min)
Supply 8.78 8156.87 1.24 7514.03

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(m²) (lpm/bar½) (l/min/m²) (l/min) (bar) (l/min/m²) (l/min) (bar)

Overhead
R27 8.3 161.4 24 198.72 1.51 24 198.78 1.52
Sprinkler

Overhead
R28 8.3 161.4 24 198.72 1.51 24.1 199.16 1.52
Sprinkler

Overhead
R3 8.3 161.4 24 198.72 1.51 24.1 199.24 1.52
Sprinkler

Overhead
R4 8.3 161.4 24 198.72 1.51 24.1 199.41 1.53
Sprinkler

Overhead
R5 8.3 161.4 24 198.72 1.51 24.2 200.19 1.54
Sprinkler

Overhead
R6 8.3 161.4 24 198.72 1.51 24.4 201.97 1.56
Sprinkler

Overhead
R7 8.3 161.4 24 198.72 1.51 24.8 205.1 1.61
Sprinkler

Overhead
R8 8.3 161.4 24 198.72 1.51 24.8 205.43 1.62
Sprinkler

Overhead
R9 8.3 161.4 24 198.72 1.51 24.4 202.24 1.57
Sprinkler

Overhead
R1 8.3 161.4 24 198.72 1.51 24.1 199.66 1.53
Sprinkler

Overhead
R10 8.3 161.4 24 198.72 1.51 24.2 200.41 1.54
Sprinkler

Overhead
R11 8.3 161.4 24 198.72 1.51 24.1 199.6 1.53
Sprinkler

Overhead
R12 8.3 161.4 24 198.72 1.51 24.1 199.41 1.53
Sprinkler

Overhead
R13 8.3 161.4 24 198.72 1.51 24.1 199.43 1.53
Sprinkler

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Overhead
R14 8.3 161.4 24 198.72 1.51 24.1 199.8 1.53
Sprinkler

Overhead
R15 8.3 161.4 24 198.72 1.51 24 199.12 1.52
Sprinkler

Overhead
R16 8.3 161.4 24 198.72 1.51 24 198.74 1.52
Sprinkler

Overhead
R17 8.3 161.4 24 198.72 1.51 24 198.72 1.51
Sprinkler

Overhead
R18 8.3 161.4 24 198.72 1.51 24 198.89 1.52
Sprinkler

Overhead
R19 8.3 161.4 24 198.72 1.51 24.1 199.68 1.53
Sprinkler

Overhead
R2 8.3 161.4 24 198.72 1.51 24.1 199.26 1.52
Sprinkler

Overhead
R20 8.3 161.4 24 198.72 1.51 24.3 201.47 1.56
Sprinkler

Overhead
R21 8.3 161.4 24 198.72 1.51 24.7 204.62 1.61
Sprinkler

Overhead
R22 8.3 161.4 24 198.72 1.51 24.7 204.71 1.61
Sprinkler

Overhead
R23 8.3 161.4 24 198.72 1.51 24.3 201.54 1.56
Sprinkler

Overhead
R24 8.3 161.4 24 198.72 1.51 24.1 199.74 1.53
Sprinkler

Overhead
R25 8.3 161.4 24 198.72 1.51 24 198.94 1.52
Sprinkler

Overhead
R26 8.3 161.4 24 198.72 1.51 24 198.76 1.52
Sprinkler

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 7
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
R17 Overhead Sprinkler 161.4 198.72 8.3 1.51 1.51
11.5 HEAD Open 0 24 -1.25 198.72
R16 Overhead Sprinkler 161.4 198.74 8.3 1.52 1.51
11.5 HEAD Open 0.02 24 -1.25 198.72
R26 Overhead Sprinkler 161.4 198.76 8.3 1.52 1.51
11.5 HEAD Open 0.04 24 -1.25 198.72
R27 Overhead Sprinkler 161.4 198.78 8.3 1.52 1.51
11.5 HEAD Open 0.06 24 -1.25 198.72
R18 Overhead Sprinkler 161.4 198.89 8.3 1.52 1.51
11.5 HEAD Open 0.17 24 -1.25 198.72
R25 Overhead Sprinkler 161.4 198.94 8.3 1.52 1.51
11.5 HEAD Open 0.22 24 -1.25 198.72
R15 Overhead Sprinkler 161.4 199.12 8.3 1.52 1.51
11.5 HEAD Open 0.41 24 -1.25 198.72
R28 Overhead Sprinkler 161.4 199.16 8.3 1.52 1.51
11.5 HEAD Open 0.44 24.1 -1.25 198.72
R3 Overhead Sprinkler 161.4 199.24 8.3 1.52 1.51
11.4 HEAD Open 0.53 24.1 -1.24 198.72
R2 Overhead Sprinkler 161.4 199.26 8.3 1.52 1.51
11.4 HEAD Open 0.54 24.1 -1.24 198.72
R4 Overhead Sprinkler 161.4 199.41 8.3 1.53 1.51
11.4 HEAD Open 0.69 24.1 -1.24 198.72
R12 Overhead Sprinkler 161.4 199.41 8.3 1.53 1.51
11.4 HEAD Open 0.69 24.1 -1.24 198.72
R13 Overhead Sprinkler 161.4 199.43 8.3 1.53 1.51
11.4 HEAD Open 0.71 24.1 -1.24 198.72
R11 Overhead Sprinkler 161.4 199.6 8.3 1.53 1.51
11.4 HEAD Open 0.88 24.1 -1.24 198.72
R1 Overhead Sprinkler 161.4 199.66 8.3 1.53 1.51
11.4 HEAD Open 0.94 24.1 -1.24 198.72
R19 Overhead Sprinkler 161.4 199.68 8.3 1.53 1.51
11.5 HEAD Open 0.96 24.1 -1.25 198.72
R24 Overhead Sprinkler 161.4 199.74 8.3 1.53 1.51
11.5 HEAD Open 1.02 24.1 -1.25 198.72
R14 Overhead Sprinkler 161.4 199.8 8.3 1.53 1.51
11.4 HEAD Open 1.08 24.1 -1.24 198.72
R5 Overhead Sprinkler 161.4 200.19 8.3 1.54 1.51
11.4 HEAD Open 1.47 24.2 -1.24 198.72
R10 Overhead Sprinkler 161.4 200.41 8.3 1.54 1.51
11.4 HEAD Open 1.69 24.2 -1.24 198.72
R20 Overhead Sprinkler 161.4 201.47 8.3 1.56 1.51
11.5 HEAD Open 2.75 24.3 -1.25 198.72
R23 Overhead Sprinkler 161.4 201.54 8.3 1.56 1.51
11.5 HEAD Open 2.82 24.3 -1.25 198.72
R6 Overhead Sprinkler 161.4 201.97 8.3 1.56 1.51
11.4 HEAD Open 3.25 24.4 -1.24 198.72
R9 Overhead Sprinkler 161.4 202.24 8.3 1.57 1.51
11.4 HEAD Open 3.52 24.4 -1.24 198.72
R21 Overhead Sprinkler 161.4 204.62 8.3 1.61 1.51
11.5 HEAD Open 5.9 24.7 -1.25 198.72
R22 Overhead Sprinkler 161.4 204.71 8.3 1.61 1.51
11.5 HEAD Open 5.99 24.7 -1.25 198.72
R7 Overhead Sprinkler 161.4 205.1 8.3 1.61 1.51
11.4 HEAD Open 6.38 24.8 -1.24 198.72

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 8
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
R8 Overhead Sprinkler 161.4 205.43 8.3 1.62 1.51
11.4 HEAD Open 6.71 24.8 -1.24 198.72
564 Node 1.86
11.2 NODE -1.23
563 Node 1.86
11.2 NODE -1.23
521 Node 1.86
11.2 NODE -1.23
520 Node 1.86
11.2 NODE -1.23
565 Node 1.87
11.2 NODE -1.23
522 Node 1.87
11.2 NODE -1.23
562 Node 1.87
11.2 NODE -1.23
519 Node 1.87
11.2 NODE -1.23
603 Node 1.87
11.1 NODE -1.22
602 Node 1.87
11.1 NODE -1.22
604 Node 1.88
11.1 NODE -1.22
668 Node 1.88
11.1 NODE -1.22
669 Node 1.88
11.1 NODE -1.22
667 Node 1.88
11.1 NODE -1.22
601 Node 1.88
11.1 NODE -1.22
566 Node 1.88
11.2 NODE -1.23
523 Node 1.88
11.2 NODE -1.23
007 Node 1.88
11.1 NODE -1.22
605 Node 1.89
11.1 NODE -1.22
666 Node 1.89
11.1 NODE -1.22
567 Node 1.91
11.2 NODE -1.23
524 Node 1.92
11.2 NODE -1.23
606 Node 1.92
11.1 NODE -1.22
665 Node 1.93
11.1 NODE -1.22
568 Node 1.97
11.2 NODE -1.23
525 Node 1.97
11.2 NODE -1.23

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 9
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
516 Node 1.98
10.9 NODE -1.2
517 Node 1.98
10.9 NODE -1.2
515 Node 1.98
10.9 NODE -1.2
011 Node 1.98
10.9 NODE -1.2
607 Node 1.98
11.1 NODE -1.22
514 Node 1.98
10.9 NODE -1.2
012 Node 1.98
10.9 NODE -1.2
664 Node 1.99
11.1 NODE -1.22
477 Node 4.4
10.9 NODE -1.2
476 Node 4.4
10.9 NODE -1.2
475 Node 4.41
10.9 NODE -1.2
474 Node 4.42
10.9 NODE -1.2
473 Node 4.45
10.9 NODE -1.2
050 Node 4.5
10.9 NODE -1.2
064 Node 6.05
5.5 NODE -0.67
066-O Node 6.18
4.41 NODE -0.56
066-I Node 6.33
4.105 NODE -0.53
067-O Node 6.34
4.067 NODE -0.53
067-I Node 6.37
3.8 NODE -0.5
H1 Outside Hose 6.49
1900
1.7 HOSE -0.29 1900
068 Node 6.56
3.5 NODE -0.47
053 Node 6.86
1.7 NODE -0.29
054 Node 6.87
1.7 NODE -0.29
056 Node 7.11
1.7 NODE -0.29
072 Node 7.65
-1.3 NODE 0
071 Node 7.65
-1.3 NODE 0
078 Node 7.65
-1.3 NODE 0

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 10
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
065 Node 7.65
-1.3 NODE 0
075 Node 7.65
-1.3 NODE 0
061 Node 7.65
-1.3 NODE 0
059 Node 7.65
-1.3 NODE 0
074 Node 7.65
-1.3 NODE 0
073 Node 7.65
-1.3 NODE 0
W1 Supply 7.72
-7514.03
-1.3 SUPPLY 0

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 11
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
1 Sprig 40 120 1(us.Tee-Br); 0.3 198.72 0.1752 0.18 564
1151 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 R17
1 Brline 10 120 155.51 0.0013 0.00 565
1(us.Tee-Run); 2.5
604 PIPE 2.5 0.1016 0.74 0.00 0 564
1 Brline 10 120 354.4 0.0058 0.01 566
1(us.Tee-Run); 2.5
605 PIPE 2.5 0.1016 1.68 0.01 0 565
1 Brline 10 120 554.08 0.0132 0.03 567
1(us.Tee-Run); 2.5
606 PIPE 2.5 0.1016 2.62 0.03 0 566
1 Brline 10 120 755.56 0.0234 0.06 568
1(us.Tee-Run); 2.5
607 PIPE 2.5 0.1016 3.58 0.06 0 567
1(us.Tee-Br);23(us.Tee-Run);1(us.
1 Brline 10 120 58.458 960.18 0.0365 0.1 475
90);
632 PIPE 2.5 0.1016 65.99 4.55 2.41 0.03 568
7.532
1 Brline 40 120 2792.04 0.0045 0.03 474
1(us.Tee-Run); 2.9
528 PIPE 6 0.1016 2.5 0.01 0 475
1 Brline 40 120 3754.69 0.0079 0.06 473
1(us.Tee-Run); 3.7
527 PIPE 6 0.1016 3.36 0.03 0 474
1 Brline 40 120 4723.56 0.012 0.09 050
1(us.Tee-Run); 3.5
526 PIPE 6 0.1016 4.22 0.04 0 473
1 Brline 40 120 5(us.90); 40.692 5614.03 0.0166 0.13 064
040 PIPE 6 0.1016 21.336 62.028 5.02 1.03 0.53 050
1 Brline 10 120 1(coupling); 1.09 5614.03 0.0132 0.1 066-O
041 PIPE 6 0.1016 0.383 1.473 4.57 0.02 0.11 064
1 VALVE AV-1 Check 0 5614.03 0.401 0 066-I
0.305
1239 VALVE 6 0 0 0.12 0.03 066-O
1 Cmain 10 120 1(coupling); 0.038 5614.03 0.0132 0.1 067-O
042 PIPE 6 0.1016 0.383 0.421 4.57 0.01 0.00 066-I
1 VALVE Gate A2360 0 5614.03 0.0193 0 067-I
0.267
1238 VALVE 6 0 0 0.01 0.03 067-O
1 Cmain 10 120 1(us.Tee-Br); 0.3 5614.03 0.0132 0.1 068
043 PIPE 6 0.1016 11.497 11.797 4.57 0.16 0.03 067-I
1(us.Tee-Br);6(us.90);1(us.Tee-Ru
1 Cmain 40 120 33.375 5614.03 0.0014 0.02 053
n);
268 PIPE 10 0.1016 88.848 1.8 0.12 0.18 068
55.473
1 Cmain 40 120 1(us.Tee-Run);2(us.45);2(us.90); 578.896 3015.3 0.0004 0.00 056
304 PIPE 10 0.1016 20.117 599.013 0.96 0.26 0 053
1 Cmain 40 120 2(us.90); 90.069 7514.03 0.0023 0.03 059
274 PIPE 10 0.1016 13.411 103.48 2.4 0.24 0.29 056
1 Cmain 40 120 1(us.90); 23.208 7514.03 0.0023 0.03 W1
276 PIPE 10 0.1016 6.706 29.914 2.4 0.07 0 059
2 Sprig 40 120 1(us.Tee-Br); 0.3 198.74 0.1752 0.18 563
1150 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 R16
2 Brline 10 120 241.94 0.0028 0.01 562
1(us.Tee-Run); 2.5
602 PIPE 2.5 0.1016 1.15 0.01 0 563
2 Brline 10 120 1(us.Tee-Br);1(us.90); 1.235 441.07 0.0086 0.02 516
600 PIPE 2.5 0.1016 7.532 8.767 2.09 0.08 0.03 562
2 Brline 40 120 427.03 0.0001 0 515
1(us.Tee-Run); 3.7
564 PIPE 6 0.1016 0.38 0 0 516
2 Brline 40 120 1(us.Tee-Br); 3.5 872.38 0.0005 0.00 514
563 PIPE 6 0.1016 9.144 12.644 0.78 0.01 0 515
2 Brline 10 120 30(us.Tee-Run);1(us.Tee-Br); 74.093 872.38 0.0306 0.09 477
532 PIPE 2.5 0.1016 5.021 79.114 4.13 2.42 0 514
2 Brline 40 120 872.38 0.0005 0.00 476
1(us.Tee-Run); 3.501
530 PIPE 6 0.1016 0.78 0.00 0 477

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 12
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.86
198.72 1.51
1.87
1.86
1.88
1.87
1.91
1.88
1.97
1.91

4.41
1.97

4.42
4.41
4.45
4.42
4.5
4.45
6.05
4.5
6.18
6.05
6.33
6.18
6.34
6.33
6.37
6.34
6.56
6.37

6.86
6.56

7.11
6.86
7.65
7.11
7.72
-7514.03
7.65
1.86
198.74 1.52
1.87
1.86
1.98
1.87
1.98
1.98
1.98
1.98
4.4
1.98
4.4
4.4

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 13
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
2 Brline 40 120 1831.86 0.0021 0.01 475
1(us.Tee-Run); 3.7
529 PIPE 6 0.1016 1.64 0.01 0 476
3 Sprig 40 120 1(us.Tee-Br); 0.3 198.76 0.1753 0.18 521
1121 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 R26
3 Brline 10 120 157.73 0.0013 0.00 522
1(us.Tee-Run); 2.5
571 PIPE 2.5 0.1016 0.75 0.00 0 521
3 Brline 10 120 356.67 0.0058 0.01 523
1(us.Tee-Run); 2.5
572 PIPE 2.5 0.1016 1.69 0.01 0 522
3 Brline 10 120 556.4 0.0133 0.03 524
1(us.Tee-Run); 2.5
573 PIPE 2.5 0.1016 2.64 0.03 0 523
3 Brline 10 120 757.95 0.0236 0.06 525
1(us.Tee-Run); 2.5
574 PIPE 2.5 0.1016 3.59 0.06 0 524
1(us.Tee-Br);23(us.Tee-Run);1(us.
3 Brline 10 120 58.458 962.66 0.0367 0.1 474
90);
599 PIPE 2.5 0.1016 65.99 4.56 2.42 0.03 525
7.532
4 Sprig 40 120 1(us.Tee-Br); 0.3 198.78 0.1753 0.18 520
1120 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 R27
4 Brline 10 120 239.82 0.0028 0.01 519
1(us.Tee-Run); 2.5
569 PIPE 2.5 0.1016 1.14 0.01 0 520
4 Brline 10 120 1(us.Tee-Br);1(us.90); 1.235 438.98 0.0086 0.02 517
567 PIPE 2.5 0.1016 7.532 8.767 2.08 0.08 0.03 519
4 Brline 40 120 453.02 0.0002 0 011
1(us.Tee-Run); 3.7
566 PIPE 6 0.1016 0.41 0 0 517
4 Brline 40 120 1(us.Tee-Br); 3.5 890.47 0.0005 0.00 012
003 PIPE 6 0.1016 9.144 12.644 0.8 0.01 0 011
4 Brline 10 120 30(us.Tee-Run);1(us.Tee-Br); 74.093 890.47 0.0318 0.09 050
005 PIPE 2.5 0.1016 5.021 79.114 4.22 2.51 0 012
5 Sprig 40 120 1(us.Tee-Br); 0.3 198.89 0.1755 0.18 565
1152 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 R18
6 Sprig 40 120 1(us.Tee-Br); 0.3 198.94 0.1755 0.18 522
1122 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 R25
7 Sprig 40 120 1(us.Tee-Br); 0.3 199.12 0.1758 0.18 562
1149 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 R15
8 Sprig 40 120 1(us.Tee-Br); 0.3 199.16 0.1759 0.18 519
1119 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 R28
9 Sprig 40 120 1(us.Tee-Br); 0.3 199.24 0.176 0.18 603
1181 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 R3
9 Brline 10 120 152.82 0.0012 0.00 604
1(us.Tee-Run); 2.5
637 PIPE 2.5 0.1016 0.72 0.00 0 603
9 Brline 10 120 352.23 0.0057 0.01 605
1(us.Tee-Run); 2.5
638 PIPE 2.5 0.1016 1.67 0.01 0 604
9 Brline 10 120 552.42 0.0131 0.03 606
1(us.Tee-Run); 2.5
639 PIPE 2.5 0.1016 2.62 0.03 0 605
9 Brline 10 120 754.38 0.0234 0.06 607
1(us.Tee-Run); 2.5
640 PIPE 2.5 0.1016 3.57 0.06 0 606
1(us.Tee-Br);23(us.Tee-Run);1(us.
9 Brline 10 120 58.358 959.48 0.0365 0.1 476
90);
665 PIPE 2.5 0.1016 65.89 4.55 2.4 0.02 607
7.532
10 Sprig 40 120 1(us.Tee-Br); 0.3 199.26 0.1761 0.18 602
1180 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 R2
10 Brline 10 120 245.69 0.0029 0.01 601
1(us.Tee-Run); 2.5
635 PIPE 2.5 0.1016 1.16 0.01 0 602
10 Brline 10 120 1(us.Tee-Br);1(us.90); 1.135 445.35 0.0088 0.02 515
633 PIPE 2.5 0.1016 7.532 8.667 2.11 0.08 0.02 601

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 14
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
4.41
4.4
1.86
198.76 1.52
1.87
1.86
1.88
1.87
1.92
1.88
1.97
1.92

4.42
1.97

1.86
198.78 1.52
1.87
1.86
1.98
1.87
1.98
1.98
1.98
1.98
4.5
1.98
1.87
198.89 1.52
1.87
198.94 1.52
1.87
199.12 1.52
1.87
199.16 1.52
1.87
199.24 1.52
1.88
1.87
1.89
1.88
1.92
1.89
1.98
1.92

4.4
1.98

1.87
199.26 1.52
1.88
1.87
1.98
1.88

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 15
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
11 Sprig 40 120 1(us.Tee-Br); 0.3 199.41 0.1763 0.18 604
1182 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 R4
12 Sprig 40 120 1(us.Tee-Br); 0.3 199.41 0.1763 0.18 668
1236 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 R12
12 Brline 10 120 161.19 0.0013 0.00 667
1(us.Tee-Run); 2.5
695 PIPE 2.5 0.1016 0.76 0.00 0 668
12 Brline 10 120 360.79 0.006 0.01 666
1(us.Tee-Run); 2.5
694 PIPE 2.5 0.1016 1.71 0.01 0 667
12 Brline 10 120 561.19 0.0135 0.04 665
1(us.Tee-Run); 2.5
693 PIPE 2.5 0.1016 2.66 0.03 0 666
12 Brline 10 120 763.43 0.0239 0.07 664
1(us.Tee-Run); 2.5
692 PIPE 2.5 0.1016 3.62 0.06 0 665
1(us.Tee-Br);23(us.Tee-Run);1(us.
12 Brline 10 120 58.358 968.87 0.0371 0.11 473
90);
667 PIPE 2.5 0.1016 65.89 4.59 2.45 0.02 664
7.532
13 Sprig 40 120 1(us.Tee-Br); 0.3 199.43 0.1763 0.18 669
1237 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 R13
13 Brline 10 120 237.65 0.0028 0.01 007
1(us.Tee-Run); 2.5
697 PIPE 2.5 0.1016 1.13 0.01 0 669
13 Brline 10 120 1(us.Tee-Br);1(us.90); 1.135 437.45 0.0085 0.02 011
002 PIPE 2.5 0.1016 7.532 8.667 2.07 0.07 0.02 007
14 Sprig 40 120 1(us.Tee-Br); 0.3 199.6 0.1766 0.18 667
1235 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 R11
15 Sprig 40 120 1(us.Tee-Br); 0.3 199.66 0.1767 0.18 601
1179 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 R1
16 Sprig 40 120 1(us.Tee-Br); 0.3 199.68 0.1768 0.18 566
1153 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 R19
17 Sprig 40 120 1(us.Tee-Br); 0.3 199.74 0.1769 0.18 523
1123 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 R24
18 Sprig 40 120 1(us.Tee-Br); 0.3 199.8 0.177 0.18 007
698 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 R14
19 Sprig 40 120 1(us.Tee-Br); 0.3 200.19 0.1776 0.18 605
1183 PIPE 1 0.1016 1.524 1.824 5.98 0.32 0.03 R5
20 Sprig 40 120 1(us.Tee-Br); 0.3 200.41 0.178 0.18 666
1234 PIPE 1 0.1016 1.524 1.824 5.99 0.32 0.03 R10
21 Sprig 40 120 1(us.Tee-Br); 0.3 201.47 0.1797 0.18 567
1154 PIPE 1 0.1016 1.524 1.824 6.02 0.33 0.03 R20
22 Sprig 40 120 1(us.Tee-Br); 0.3 201.54 0.1798 0.18 524
1124 PIPE 1 0.1016 1.524 1.824 6.02 0.33 0.03 R23
23 Sprig 40 120 1(us.Tee-Br); 0.3 201.97 0.1805 0.18 606
1184 PIPE 1 0.1016 1.524 1.824 6.04 0.33 0.03 R6
24 Sprig 40 120 1(us.Tee-Br); 0.3 202.24 0.181 0.18 665
1233 PIPE 1 0.1016 1.524 1.824 6.05 0.33 0.03 R9
25 Sprig 40 120 1(us.Tee-Br); 0.3 204.62 0.1849 0.19 568
1155 PIPE 1 0.1016 1.524 1.824 6.12 0.34 0.03 R21
26 Sprig 40 120 1(us.Tee-Br); 0.3 204.71 0.1851 0.19 525
1125 PIPE 1 0.1016 1.524 1.824 6.12 0.34 0.03 R22
27 Sprig 40 120 1(us.Tee-Br); 0.3 205.1 0.1857 0.19 607
1185 PIPE 1 0.1016 1.524 1.824 6.13 0.34 0.03 R7
28 Sprig 40 120 1(us.Tee-Br); 0.3 205.43 0.1863 0.19 664
1232 PIPE 1 0.1016 1.524 1.824 6.14 0.34 0.03 R8
29 Cmain 10 120 1(us.Tee-Br); 2.348 1900 0.0458 0.17 054
310 PIPE 3 0.1016 6.145 8.492 5.88 0.39 0 H1
29 Cmain 40 120 1(us.Tee-Br);1(us.90); 241.857 4498.73 0.0009 0.01 056
271 PIPE 10 0.1016 21.946 263.803 1.44 0.24 0 054

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 16
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.88
199.41 1.53
1.88
199.41 1.53
1.88
1.88
1.89
1.88
1.93
1.89
1.99
1.93

4.45
1.99

1.88
199.43 1.53
1.88
1.88
1.98
1.88
1.88
199.6 1.53
1.88
199.66 1.53
1.88
199.68 1.53
1.88
199.74 1.53
1.88
199.8 1.53
1.89
200.19 1.54
1.89
200.41 1.54
1.91
201.47 1.56
1.92
201.54 1.56
1.92
201.97 1.56
1.93
202.24 1.57
1.97
204.62 1.61
1.97
204.71 1.61
1.98
205.1 1.61
1.99
205.43 1.62
6.87
1900 6.49
7.11
6.87

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 17
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
30 Brline 10 120 43.21 0.0001 0 563
1(us.Tee-Run); 2.5
603 PIPE 2.5 0.1016 0.2 0 0 564
31 Cmain 40 120 2598.73 0.0003 0.00 054
1(us.Tee-Run); 60
269 PIPE 10 0.1016 0.83 0.02 0 053
32 Cmain 40 120 1(us.Tee-Br); 232.617 1.9 0 0 074
292 PIPE 10 0.1016 15.24 247.857 0 0 0 059
32 Cmain 40 120 1(us.Tee-Br); 105.403 4.33 0 0 073
291 PIPE 10 0.1016 15.24 120.643 0.00 0 0 074
32 Cmain 40 120 5.11 0 0 072
1(us.Tee-Run); 226.39
289 PIPE 10 0.1016 0.00 0 0 073
32 Cmain 40 120 8.11 0 0 071
1(us.Tee-Run); 8.796
288 PIPE 10 0.1016 0.00 0 0 072
1(us.Tee-Run);4(us.90);1(us.45);1
32 Cmain 40 120 541.579 5.58 0 0 065
(us.Tee-Br);
282 PIPE 10 0.1016 586.994 0.00 0 0 071
45.415
32 Cmain 40 120 1(us.Tee-Br);4(us.90); 1136.821 2.9 0 0 078
299 PIPE 10 0.1016 42.062 1178.883 0 0 0 065
32 Cmain 40 120 1(us.Tee-Run);2(us.90); 472.836 5.42 0 0 075
295 PIPE 10 0.1016 13.411 486.247 0.00 0 0 078
32 Cmain 40 120 2(us.Tee-Br); 101.371 2.99 0 0 072
294 PIPE 10 0.1016 30.48 131.851 0 0 0 075
33 Brline 40 120 14.04 0 0 517
1(us.Tee-Run); 2.9
565 PIPE 6 0.1016 0.01 0 0 516
34 Brline 10 120 41.04 0.0001 0 520
1(us.Tee-Run); 2.5
570 PIPE 2.5 0.1016 0.19 0 0 521
35 Brline 10 120 46.43 0.0001 0 602
1(us.Tee-Run); 2.5
636 PIPE 2.5 0.1016 0.22 0 0 603
36 Brline 10 120 38.22 0.0001 0 669
1(us.Tee-Run); 2.5
696 PIPE 2.5 0.1016 0.18 0 0 668
37 Cmain 40 120 2.52 0 0 078
1(us.Tee-Run); 341.032
298 PIPE 10 0.1016 0 0 0 071
1(us.Tee-Run);2(elbow.22.5);1(us.
38 Cmain 40 120 225.559 2.68 0 0 061
Tee-Br);1(us.90);
278 PIPE 10 0.1016 250.858 0 0 0 065
25.298
38 Cmain 40 120 1(us.Tee-Br); 106.306 1.9 0 0 059
277 PIPE 10 0.1016 15.24 121.546 0 0 0 061
39 Cmain 40 120 1(us.Tee-Br); 227.981 2.43 0 0 074
293 PIPE 10 0.1016 15.24 243.221 0 0 0 075
40 Cmain 40 120 0.79 0 0 073
1(us.Tee-Run); 237.006
290 PIPE 10 0.1016 0 0 0 061

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 18
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.86
1.86
6.87
6.86
7.65
7.65
7.65
7.65
7.65
7.65
7.65
7.65

7.65
7.65

7.65
7.65
7.65
7.65
7.65
7.65
1.98
1.98
1.86
1.86
1.87
1.87
1.88
1.88
7.65
7.65

7.65
7.65

7.65
7.65
7.65
7.65
7.65
7.65

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 19
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 1
R17 11.5 161.4 198.72 1 1x(us.Tee-Br)=1.524 0.3 120 1.51
564 11.2 198.72 26.6 1.524 0.1752 0.03
1.824 0.32
564 11.2 -43.21 2.5 2.5 120 1.86
565 11.2 155.51 66.9 0 0.0013 0
2.5 0.00
565 11.2 198.89 2.5 2.5 120 1.87
566 11.2 354.4 66.9 0 0.0058 0
2.5 0.01
566 11.2 199.68 2.5 2.5 120 1.88
567 11.2 554.08 66.9 0 0.0132 0
2.5 0.03
567 11.2 201.47 2.5 2.5 120 1.91
568 11.2 755.56 66.9 0 0.0234 0
2.5 0.06
568 11.2 204.62 2.5 1x(us.Tee-Br)=5.021 58.458 120 1.97
475 10.9 960.18 66.9 1x(us.90)=2.511 7.532 0.0365 0.03
65.99 2.41
475 10.9 1831.86 6 2.9 120 4.41
474 10.9 2792.04 154.1 0 0.0045 0
2.9 0.01
474 10.9 962.66 6 3.7 120 4.42
473 10.9 3754.69 154.1 0 0.0079 0
3.7 0.03
473 10.9 968.87 6 3.5 120 4.45
050 10.9 4723.56 154.1 0 0.012 0
3.5 0.04
050 10.9 890.47 6 5x(us.90)=21.336 40.692 120 4.5
064 5.5 5614.03 154.1 21.336 0.0166 0.53
62.028 1.03
064 5.5 0 6 1x(coupling)=0.383 1.09 120 6.05
066-O 4.41 5614.03 161.5 0.383 0.0132 0.11
1.473 0.02
066-O 4.41 0 6 0.305 0 6.18 AV-1 Check
066-I 4.105 5614.03 0 0 0.401 0.03 ***
0.305 0.12
066-I 4.105 0 6 1x(coupling)=0.383 0.038 120 6.33
067-O 4.067 5614.03 161.5 0.383 0.0132 0.00
0.421 0.01
067-O 4.067 0 6 0.267 0 6.34 Gate A2360
067-I 3.8 5614.03 0 0 0.0193 0.03 ***
0.267 0.01
067-I 3.8 0 6 1x(us.Tee-Br)=11.497 0.3 120 6.37
068 3.5 5614.03 161.5 11.497 0.0132 0.03
11.797 0.16
068 3.5 0 10 1x(us.Tee-Br)=15.24 33.375 120 6.56
053 1.7 5614.03 257.6 6x(us.90)=40.233 55.473 0.0014 0.18
88.848 0.12
053 1.7 -2598.73 10 2x(us.45)=6.706 578.89 120 6.86
056 1.7 3015.3 257.6 2x(us.90)=13.411 6 0.0004 0
20.117 0.26
599.01
3

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 20
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 1
056 1.7 4498.73 10 2x(us.90)=13.411 90.069 120 7.11
059 -1.3 7514.03 257.6 13.411 0.0023 0.29
103.48 0.24
059 -1.3 0 10 1x(us.90)=6.706 23.208 120 7.65
W1 -1.3 7514.03 257.6 6.706 0.0023 0
29.914 0.07
W1 7.72

Path No: 2
R16 11.5 161.4 198.74 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
563 11.2 198.74 26.6 1.524 0.1752 0.03
1.824 0.32
563 11.2 43.21 2.5 2.5 120 1.86
562 11.2 241.94 66.9 0 0.0028 0
2.5 0.01
562 11.2 199.12 2.5 1x(us.Tee-Br)=5.021 1.235 120 1.87
516 10.9 441.07 66.9 1x(us.90)=2.511 7.532 0.0086 0.03
8.767 0.08
516 10.9 -14.04 6 3.7 120 1.98
515 10.9 427.03 154.1 0 0.0001 0
3.7 0
515 10.9 445.35 6 1x(us.Tee-Br)=9.144 3.5 120 1.98
514 10.9 872.38 154.1 9.144 0.0005 0
12.644 0.01
514 10.9 0 2.5 1x(us.Tee-Br)=5.021 74.093 120 1.98
477 10.9 872.38 66.9 5.021 0.0306 0
79.114 2.42
477 10.9 0 6 3.501 120 4.4
476 10.9 872.38 154.1 0 0.0005 0
3.501 0.00
476 10.9 959.48 6 3.7 120 4.4
475 10.9 1831.86 154.1 0 0.0021 0
3.7 0.01
475 4.41

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 21
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 3
R26 11.5 161.4 198.76 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
521 11.2 198.76 26.6 1.524 0.1753 0.03
1.824 0.32
521 11.2 -41.04 2.5 2.5 120 1.86
522 11.2 157.73 66.9 0 0.0013 0
2.5 0.00
522 11.2 198.94 2.5 2.5 120 1.87
523 11.2 356.67 66.9 0 0.0058 0
2.5 0.01
523 11.2 199.74 2.5 2.5 120 1.88
524 11.2 556.4 66.9 0 0.0133 0
2.5 0.03
524 11.2 201.54 2.5 2.5 120 1.92
525 11.2 757.95 66.9 0 0.0236 0
2.5 0.06
525 11.2 204.71 2.5 1x(us.Tee-Br)=5.021 58.458 120 1.97
474 10.9 962.66 66.9 1x(us.90)=2.511 7.532 0.0367 0.03
65.99 2.42
474 4.42

Path No: 4
R27 11.5 161.4 198.78 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
520 11.2 198.78 26.6 1.524 0.1753 0.03
1.824 0.32
520 11.2 41.04 2.5 2.5 120 1.86
519 11.2 239.82 66.9 0 0.0028 0
2.5 0.01
519 11.2 199.16 2.5 1x(us.Tee-Br)=5.021 1.235 120 1.87
517 10.9 438.98 66.9 1x(us.90)=2.511 7.532 0.0086 0.03
8.767 0.08
517 10.9 14.04 6 3.7 120 1.98
011 10.9 453.02 154.1 0 0.0002 0
3.7 0
011 10.9 437.45 6 1x(us.Tee-Br)=9.144 3.5 120 1.98
012 10.9 890.47 154.1 9.144 0.0005 0
12.644 0.01
012 10.9 0 2.5 1x(us.Tee-Br)=5.021 74.093 120 1.98
050 10.9 890.47 66.9 5.021 0.0318 0
79.114 2.51
050 4.5

Path No: 5
R18 11.5 161.4 198.89 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
565 11.2 198.89 26.6 1.524 0.1755 0.03
1.824 0.32
565 1.87

Path No: 6
R25 11.5 161.4 198.94 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
522 11.2 198.94 26.6 1.524 0.1755 0.03
1.824 0.32
522 1.87

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 22
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 7
R15 11.5 161.4 199.12 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
562 11.2 199.12 26.6 1.524 0.1758 0.03
1.824 0.32
562 1.87

Path No: 8
R28 11.5 161.4 199.16 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
519 11.2 199.16 26.6 1.524 0.1759 0.03
1.824 0.32
519 1.87

Path No: 9
R3 11.4 161.4 199.24 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
603 11.1 199.24 26.6 1.524 0.176 0.03
1.824 0.32
603 11.1 -46.43 2.5 2.5 120 1.87
604 11.1 152.82 66.9 0 0.0012 0
2.5 0.00
604 11.1 199.41 2.5 2.5 120 1.88
605 11.1 352.23 66.9 0 0.0057 0
2.5 0.01
605 11.1 200.19 2.5 2.5 120 1.89
606 11.1 552.42 66.9 0 0.0131 0
2.5 0.03
606 11.1 201.97 2.5 2.5 120 1.92
607 11.1 754.38 66.9 0 0.0234 0
2.5 0.06
607 11.1 205.1 2.5 1x(us.Tee-Br)=5.021 58.358 120 1.98
476 10.9 959.48 66.9 1x(us.90)=2.511 7.532 0.0365 0.02
65.89 2.4
476 4.4

Path No: 10
R2 11.4 161.4 199.26 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
602 11.1 199.26 26.6 1.524 0.1761 0.03
1.824 0.32
602 11.1 46.43 2.5 2.5 120 1.87
601 11.1 245.69 66.9 0 0.0029 0
2.5 0.01
601 11.1 199.66 2.5 1x(us.Tee-Br)=5.021 1.135 120 1.88
515 10.9 445.35 66.9 1x(us.90)=2.511 7.532 0.0088 0.02
8.667 0.08
515 1.98

Path No: 11
R4 11.4 161.4 199.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
604 11.1 199.41 26.6 1.524 0.1763 0.03
1.824 0.32
604 1.88

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 23
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 12
R12 11.4 161.4 199.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
668 11.1 199.41 26.6 1.524 0.1763 0.03
1.824 0.32
668 11.1 -38.22 2.5 2.5 120 1.88
667 11.1 161.19 66.9 0 0.0013 0
2.5 0.00
667 11.1 199.6 2.5 2.5 120 1.88
666 11.1 360.79 66.9 0 0.006 0
2.5 0.01
666 11.1 200.41 2.5 2.5 120 1.89
665 11.1 561.19 66.9 0 0.0135 0
2.5 0.03
665 11.1 202.24 2.5 2.5 120 1.93
664 11.1 763.43 66.9 0 0.0239 0
2.5 0.06
664 11.1 205.43 2.5 1x(us.Tee-Br)=5.021 58.358 120 1.99
473 10.9 968.87 66.9 1x(us.90)=2.511 7.532 0.0371 0.02
65.89 2.45
473 4.45

Path No: 13
R13 11.4 161.4 199.43 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
669 11.1 199.43 26.6 1.524 0.1763 0.03
1.824 0.32
669 11.1 38.22 2.5 2.5 120 1.88
007 11.1 237.65 66.9 0 0.0028 0
2.5 0.01
007 11.1 199.8 2.5 1x(us.Tee-Br)=5.021 1.135 120 1.88
011 10.9 437.45 66.9 1x(us.90)=2.511 7.532 0.0085 0.02
8.667 0.07
011 1.98

Path No: 14
R11 11.4 161.4 199.6 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
667 11.1 199.6 26.6 1.524 0.1766 0.03
1.824 0.32
667 1.88

Path No: 15
R1 11.4 161.4 199.66 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
601 11.1 199.66 26.6 1.524 0.1767 0.03
1.824 0.32
601 1.88

Path No: 16
R19 11.5 161.4 199.68 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
566 11.2 199.68 26.6 1.524 0.1768 0.03
1.824 0.32
566 1.88

Path No: 17
R24 11.5 161.4 199.74 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
523 11.2 199.74 26.6 1.524 0.1769 0.03
1.824 0.32
523 1.88

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 24
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 18
R14 11.4 161.4 199.8 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
007 11.1 199.8 26.6 1.524 0.177 0.03
1.824 0.32
007 1.88

Path No: 19
R5 11.4 161.4 200.19 1 1x(us.Tee-Br)=1.524 0.3 120 1.54
605 11.1 200.19 26.6 1.524 0.1776 0.03
1.824 0.32
605 1.89

Path No: 20
R10 11.4 161.4 200.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.54
666 11.1 200.41 26.6 1.524 0.178 0.03
1.824 0.32
666 1.89

Path No: 21
R20 11.5 161.4 201.47 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
567 11.2 201.47 26.6 1.524 0.1797 0.03
1.824 0.33
567 1.91

Path No: 22
R23 11.5 161.4 201.54 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
524 11.2 201.54 26.6 1.524 0.1798 0.03
1.824 0.33
524 1.92

Path No: 23
R6 11.4 161.4 201.97 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
606 11.1 201.97 26.6 1.524 0.1805 0.03
1.824 0.33
606 1.92

Path No: 24
R9 11.4 161.4 202.24 1 1x(us.Tee-Br)=1.524 0.3 120 1.57
665 11.1 202.24 26.6 1.524 0.181 0.03
1.824 0.33
665 1.93

Path No: 25
R21 11.5 161.4 204.62 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
568 11.2 204.62 26.6 1.524 0.1849 0.03
1.824 0.34
568 1.97

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 25
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 26
R22 11.5 161.4 204.71 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
525 11.2 204.71 26.6 1.524 0.1851 0.03
1.824 0.34
525 1.97

Path No: 27
R7 11.4 161.4 205.1 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
607 11.1 205.1 26.6 1.524 0.1857 0.03
1.824 0.34
607 1.98

Path No: 28
R8 11.4 161.4 205.43 1 1x(us.Tee-Br)=1.524 0.3 120 1.62
664 11.1 205.43 26.6 1.524 0.1863 0.03
1.824 0.34
664 1.99

Path No: 29
H1 1.7 1900 3 1x(us.Tee-Br)=6.145 2.348 120 6.49
054 1.7 1900 82.8 6.145 0.0458 0
8.492 0.39
054 1.7 2598.73 10 1x(us.Tee-Br)=15.24 241.85 120 6.87
056 1.7 4498.73 257.6 1x(us.90)=6.706 7 0.0009 0
21.946 0.24
263.80
3
056 7.11

Path No: 30
564 11.2 0 2.5 2.5 120 1.86
563 11.2 43.21 66.9 0 0.0001 0
2.5 0
563 1.86

Path No: 31
053 1.7 0 10 60 120 6.86
054 1.7 2598.73 257.6 0 0.0003 0
60 0.02
054 6.87

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 26
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 32
059 -1.3 0 10 1x(us.Tee-Br)=15.24 232.61 120 7.65
074 -1.3 1.9 257.6 7 0 0
15.24 0
247.85
7
074 -1.3 2.43 10 1x(us.Tee-Br)=15.24 105.40 120 7.65
073 -1.3 4.33 257.6 3 0 0
15.24 0
120.64
3
073 -1.3 0.79 10 226.39 120 7.65
072 -1.3 5.11 257.6 0 0 0
226.39 0
072 -1.3 2.99 10 8.796 120 7.65
071 -1.3 8.11 257.6 0 0 0
8.796 0
071 -1.3 -2.52 10 4x(us.90)=26.822 541.57 120 7.65
065 -1.3 5.58 257.6 1x(us.45)=3.353 9 0 0
1x(us.Tee-Br)=15.24 45.415 0
586.99
4
065 -1.3 -2.68 10 1x(us.Tee-Br)=15.24 1136.8 120 7.65
078 -1.3 2.9 257.6 4x(us.90)=26.822 21 0 0
42.062 0
1178.8
83
078 -1.3 2.52 10 2x(us.90)=13.411 472.83 120 7.65
075 -1.3 5.42 257.6 6 0 0
13.411 0
486.24
7
075 -1.3 -2.43 10 2x(us.Tee-Br)=30.48 101.37 120 7.65
072 -1.3 2.99 257.6 1 0 0
30.48 0
131.85
1
072 7.65

Path No: 33
516 10.9 0 6 2.9 120 1.98
517 10.9 14.04 154.1 0 0 0
2.9 0
517 1.98

Path No: 34
521 11.2 0 2.5 2.5 120 1.86
520 11.2 41.04 66.9 0 0.0001 0
2.5 0
520 1.86

Path No: 35
603 11.1 0 2.5 2.5 120 1.87
602 11.1 46.43 66.9 0 0.0001 0
2.5 0
602 1.87

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 27
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 36
668 11.1 0 2.5 2.5 120 1.88
669 11.1 38.22 66.9 0 0.0001 0
2.5 0
669 1.88

Path No: 37
071 -1.3 0 10 341.03 120 7.65
078 -1.3 2.52 257.6 2 0 0
0 0
341.03
2
078 7.65

Path No: 38
065 -1.3 0 10 2x(elbow.22.5)=3.353 225.55 120 7.65
061 -1.3 2.68 257.6 1x(us.Tee-Br)=15.24 9 0 0
1x(us.90)=6.706 25.298 0
250.85
8
061 -1.3 -0.79 10 1x(us.Tee-Br)=15.24 106.30 120 7.65
059 -1.3 1.9 257.6 6 0 0
15.24 0
121.54
6
059 7.65

Path No: 39
075 -1.3 0 10 1x(us.Tee-Br)=15.24 227.98 120 7.65
074 -1.3 2.43 257.6 1 0 0
15.24 0
243.22
1
074 7.65

Path No: 40
061 -1.3 0 10 237.00 120 7.65
073 -1.3 0.79 257.6 6 0 0
0 0
237.00
6
073 7.65

* Pressures are balanced to a high degree of accuracy. Values may vary by 0.01 bar due to display rounding.

* Maximum Velocity of 6.14 m/s occurs in the following pipe(s): (664-R8)

*** Device pressure loss (gain in the case of pumps) is calculated from the device’s curve. If the device curve is printed with
this report, it will appear below. The length of the device as shown in the table above comes from the CAD drawing. The friction
loss per unit of length is calculated based upon the length and the curve-based loss/gain value. Internal ID and C Factor values
are irrelevant as the device is not represented as an addition to any pipe, but is an individual item whose loss/gain is based
solely on the curve data.

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 28
Job : FAS Building7 Device Graphs

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 29
Job : FAS Building7 Device Graphs

File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 30