You are on page 1of 1

METHOD STATEMENT

Purpose: Excavation for Road Area

Scope of work

 Excavation up to 1.5 mtrs.To 2 Mtrs. approximately


 Side cutting, dressing leveling & compaction Road Roller
 Transported of soil to designated area.
Procedure

 De-markation of to Excavation Area.


 Proper access making for vehicle movement.
 Dressing leveling and side cutting using hand tools
 Compaction by using Road Roller
 Excavation using mechanical machines poclane, dumpers, & tractors
& may be manually.
 Transportation of soil to designated area using dumpers etc.
 Area hard barrication around excavated area.
 Access to be provided for entry exit to pit excavated.

Equipment Used

Poclan, JCB, Dumpers, Tractors.


Safety Measures

 PPE’S will be provided to all work men.


 Proper access for vehicle movements.
 Hard barrication 1.00mtr. Away from excavated pit.
 Swing area defines & barricaded any one side around excavator..
 Continuous supervision.