MAIN CONTRACTOR ROHAN BUILDERS (INDIA) PVT LTD.

CLIENT JABIL CIRCUIT (INDIA) PVT LTD.

CONSULTANT DANDEKAR ASSOCIATES

Logicon Building
Sub Contractor Name System (I) Pvt.Ltd.

TASK (Work Method Statement) .Installation of fire detection system (24v DC)

LOCATION SMT PRODUCTION AREA.

METHOD STATEMENT FOR

Installation of Fire Detection System. ( 24v DC)

 Purpose : Installation of fire detection system.


 Scope of Work : Shifting Of Material, Fabrication, Fixing.

 Procedure : Unloading of Fire detection system material.


Stacking of Fire detection material ( Manual Call-
Point, Hooter, Control Module) .
Shifting of Fire detection material (Manually)to work
place .
Fabrication Of cable tray Support /spacer strip.
Erection of cable tray Support /spacer strip.
Mcp, detector,hooter,cm Installation. Use angle
Support & partition.
Armoured cable laying & cable termination.

 Possible Hazard: - Cut Injury.


Fall of Material / Person
Hot Injury/ Fire Hazard
Electrical Hazard
 Use of Equipment :- 1) Three Phase ( Welding Machine)
2) Cutting Machine
3) Drilling Machine
4) Hand Tools
5) Mechanical tool Box
6) Wire-Brush
7) Spanner.

 Use of PPE’S :-
 Safety Helmet, Shoe, Reflective Jacket
 Hand gloves
 Nose mask.
 Full body safety harness
 Goggles ( White)
 Ear plug.
 Safety shoes

Responsible Person -- S.M.Pansare