Professional Documents
Culture Documents
METHOD STATEMENt Fabrication
METHOD STATEMENt Fabrication
STRUCTURAL WORK
UNLOADING
o Hard Barricading will be done all around the Material Stacking Yard other than
access and will be identified using board.
o Material unloading is to be done by manually or by using machinery.
o For small sections i.e, Angles, channels small beams can be unloaded manually
for which unit weight is less.
o Heavy Sections will be unloaded by Hydra.
o Structural material will be stacked over wooden reapers.
o While unloading the material trained signal man will give the signal.
o While unloading material to be fastened securely using Sling, Nylon Belts &
Shackles.
FABRICATION YARD
Marking
Cutting Cutting Set
Drilling Bench Drill & Magnet Drill
Grinding AG7 &AG4
Fitting & Tack Welding. Rectifier
Final welding & Finishing
GAS STORAGE