You are on page 1of 3

Technical ebid number 221 Rev.

0
Electricity provided by the
Project number 12201 Bulilding No. 1 NO
customer
Water provided by the
Project name Heritage NO
customer
Date of bid 27-Mar-2019 Site roll forming NO
Last date of bid 03-Apr-2019 Mobilisation date 20 - Apr - 2019
From 22 - Apr - 2019 To
GA dwawing no. GA-01 to GA-06 Structure erection 15 - May -
2019
15 - May -
From 2019 To
Drawing revision no. R0 Roofing installation 25 - May -
2019
06 - May -
From 2019 To
Nature of work Structural erection & sheeting Deck sheet 15 - May -
2019
15 - May -
Site location (complete Block No. 4 & 5, Khasra No. 1840/1028 &
Cladding installation From 2019 To
address.) 1951/1028, Jodhpur-342005, Rajasthan.
05 - Jun - 2019
Contact name Aftab Saifi Handover 10 - Jun - 2019
Contact number 80926-87595 Erector zone N, PAN INDIA
Approximate duration to
6 weeks Project add on NO
complete the project
Review [yes/no] YES Site condition GREEN FIELD
Bid Created Date 27-Mar-2019

Building/Area Information
LENGTH WIDTH CLEAR HEIGHT UNDER THE KNEE (PL.
BUILDING/AREA NAME TYPE OF BUILDING (c/c-o/o) (c/c-0/0) BUILDING AREA (SQM) CHECK IN GA DWG.) MTRS. SLOPE

Building-01 MULTI SPAN 65.24 38 2479.12 4.0m clear from FFL to bottom 1:10

Total Building Area : 2479.12

Erector Type
S. DESCRIPTION OF SPECIAL NOTE IF
ERECTOR TYPE UNIT QUANTITY REQUIREMENT RATE AMOUNT
NO. WORK ANY
STRUCTURE
SUPERVISION OF ANCHOR CHECKING OF
1 MT YES
BOLT ANCHOR BOLTS
Paint Touch-up must be start
APPLICATION OF
immediately after unloading of
ALKYD BASE PAINT YES
2 PAINTING MT 236.974 1500 355461 structure material. Paint for
(SPRAY APPLIED ) AT TOUCH UP
touch-up will be supplied by
SITE
Interarch
SUPPLY OF PREMIUM
QUALITY SYNTHETIC
3 PAINTING MT
ENAMEL PAINT
APPLIED AT SITE
Paint Touch-up must be start
APPLICATION OF
immediately after unloading of
EPOXY COATING
4 PAINTING MT structure material. Paint for
(SPRAY APPLIED ) AT
touch-up will be supplied by
SITE
Interarch
SUPPLY OF PREMIUM
QUALITY EPOXY
5 PAINTING MT
PAINT APPLIED AT
SITE
6 STRUCTURAL ERECTION BUILT-UP MT 187.769 YES 8000 1502152
YES
7 STRUCTURAL ERECTION COLD FORM MT 38.559 10000 385590
PRE-GALVANIZED
8 STRUCTURAL ERECTION HOT ROLL STEEL MT 49.205 YES 18000 885690
9 STRUCTURAL ERECTION PIPE MT
10 CABLE TRAY
ROOF PLAT FORM /
11 WALKWAYS WITH HAND
RAILING
HEADER PIPE SYSTEM
12
WITH PAINTING MS
S. DESCRIPTION OF SPECIAL NOTE IF
ERECTOR TYPE UNIT QUANTITY REQUIREMENT RATE AMOUNT
NO. WORK ANY
13 CRANE BEAM (EOT / MONO)
CRANE WALKWAY WITH
14
HAND RAIL
15 FRAMED OPENINGS YES
16 CAGE LADDER YES
MEZZANINE WITH HAND
17 CHEQUERED PLATE YES
RAIL
STAIRCASE WITH
HANDRAIL OFFICE /
18 INDUSTRIAL TYPE AND YES
CHEQUERED PLATE (WITH
TOE GUARD)
19 MONKEY LADDER
20 FASCIA
TOTAL STRUCTURE 275.533
SHEETING
ROOF SHEETING +
21 SINGLE-KILPPON M2
FLASHING
ROOF SHEETING +
22 SINGLE-HI RIB M2 2504 YES 95 237880
FLASHING

SEAMING MACHINE
ROOF SHEETING + SHALL BE PROVIDED ON
23 SINGLE-SS-2000 M2 RENTAL BASIS AND RENT
FLASHING
WILL BE DEDUCTED
FROM YOUR ACCOUNT.
ROOF SHEETING +
24 PUFF PANEL M2
FLASHING
ROOF SHEETING +
25 DOUBLE SKIN-HR M2
FLASHING
WALL CLADDING +
26 FASCIA-HR M2
FLASHING
WALL CLADDING +
27 PUFF PANEL M2
FLASHING
WALL CLADDING +
28 SINGLE-HR M2 4544 YES 105 477120
FLASHING
WALL CLADDING +
29 DOUBLE SKIN -HR M2
FLASHING
WALL CLADDING +
30 PARTITION
FLASHING
MEZZANINE WITH HAND DECKING SHEET
31 M2 5306 YES 80 424480
RAIL (GI)
MEZZANINE WITH HAND SHEAR STUDS FOR
32 NOS
RAIL DECKING SHEET
BARE GALVALUME
33 GUTTER M 140 YES 450 63000
/GI
INTERNAL BOX
34 GUTTER M
/VALLEY GUTTER MS
ALUMININUM
35 GUTTER M
GUTTER
36 GUTTER SS GUTTER M
37 DOWN TAKE PIPE HDPE M
38 DOWN TAKE PIPE SMP (GALVALUME) M 320 YES 290 92800
39 DOWN TAKE PIPE PVC M
40 DOWN TAKE PIPE MS(MILD STEEL) M
YES
41 DAYLIGHT PANEL M2 110 115 12650
ROOF
FALL PROTECTION
42 DAYLIGHT PANEL YES
FRAME GI WITH MESH
43 INSULATION WITH WELD MESH M2
WITHOUT WELD
44 INSULATION M2
MESH (FSK)
RIDGEVENT(MM
45 VENTILATOR M
THROAT)
YES
46 VENTILATOR TURBO (MM DIA) NOS 16 800 12800
600
POWER VENT WITH
47 VENTILATOR NOS
TIG WELDING
48 INDUSTRIAL LOUVER M2
49 LOUVER (S-TYPE) M2
50 DEKSTRIP FLASHING M
51 CEMENT BOARD M2
S. DESCRIPTION OF SPECIAL NOTE IF
ERECTOR TYPE UNIT QUANTITY REQUIREMENT RATE AMOUNT
NO. WORK ANY
52 FALSE CEILING M2
53 CRIMP-CURVED SHEET NOS
54 SAFETY NET M2
BIRD MESH/WELD
MESH/INSECT
55 MESH(ROOF/WALL)-
(25*25*1.6/50*50*2.0/75*75*1.
6MM)
56 WINDOW (ALLUMINIUM) M2
57 SLIDING DOOR M2
MS DOOR(POWDER
58 M2
COATED)
59 ROLLING SHUTTER M2
60 ROOF LIFE LINE SYSTEM M
61 SUB GIRTS GI
62 SOFFIT SHEET
63 CANOPY YES
64 ROOF MONITOR
65 ROOF EXTENSION
TRANSVERSE MONITOR
66
WITH TIG WELDING
67 PARTITION WALL
68 FRAMED OPENINGS YES YES
69 LEAN-TO
70 FASCIA
OTHERS YES
71 SPECIALS, IF ANY
1) After building completion,
Hydro testing is to be done by
erector
2) Consider 3.5mtr RCC
column on BEW, steel column
will start from 3.5 mtr. Lvl.
3) Cut-out for lift.