LCP-BADAMYAR PROJECT- EPSCC1

Campaign #2 – MCP Modification & LCP HU Works


DAILY PROGRESS REPORT (DPR) NIGHT SHIFT

Date - MAR /06/ 2017 Location - YDN Offshore


Report No - CP #15-YDN-LBM Contractor - HHI / PHT

A. Area of Concern(s)
MCP Mezzanine and Weather Deck
B. Activities:
0
N Reference TS NO Location Description
1 QA/QC LCP Today No Radiography no RT

2 piping MCP Line Number –BP03-FG- install -3-caskat on the flange

3 Piping MCP Line -24”- removing water on the pipe and ceiling Air drying on Going

4 Piping MCP Line -18”- removing water on the pipe and ceiling Air drying on Going

5 Piping AWB Line 24” –BP31-HC-2256-RW-003-fit up and welding on Going

6 piping AWB Line 20”-BP31-HC-2236 –FW-1- fit up and welding on Gping


C. Highlight:
-.N/A