CHECK LIST FOR INSTALLATION OF LV/MV/HV CABLES

Project IRAQ 4X400KV GIS SUBSTAIONS Project No.


Employer MINISTRY OF ELECTRICAL OF THE REPUBLIC OF IRAQ Report No.
Contractor TOYOTA TSUSHO CORPORATION IR Ref. No.
Subcontractor ELSEWEDY ELECTRIC POWER SYSTEM PROJECTS Date
Drawing Ref. Unit/Area
Description

Sl. Signature
Activity Observations
No. S/C CONTRACTOR EMPLOYER

1 Check the cables size, type and tag no. are correct

2 check the cables marking/phasing are correct

3 check that all cable glands are terminated satisfactory

4 check that all cables are terminated satisfactory from both sides

5 check that all cables passed the continuity test

6 Check cables are dressed and tied , secured properly.

check that the cable trays/conduits are free of dents , dirts and sharp
7 edges before pulling

check the cable trench depth , spacing , and trench is free of


8
rocks
check that marking tape or red tiles are installed after
9
compacted fine sand layer for direct buried cables .
check that all block outs has been sealed with suitable
10
material up on cable pulling

11 Check drawing marked up (As-built) if any changes made.


Remarks:-

RESULT: ACCEPTED ACCEPTED AS NOTED REJECTED


DETAILS SUBCONTRACTOR CONTRACTOR EMPLOYER (If Req.)
Name
Signature
Designation

3003/FP110 Att.06 Rev.0 21 Jun. 2019 Page 1 of 1


CHECK LIST FOR INSTALLATION OF LV/MV/HV CABLES

Date

3003/FP110 Att.06 Rev.0 21 Jun. 2019 Page 1 of 1