LARSEN & TOUBRO (OMAN) LLC

INSTALLATION CHECK LIST FOR LV SWITCHGEAR

CONSTRUCTION OF 132/33 KV GRID STATION AND


PROJECT ASSOCIATED TRANSMISSION SYSTEM AT MISFAH AREA
(TENDER 175 /2009)
CLIENT Oman Electricity Transmission Company SAOC
CLIENT’S CONSULTANT Energoprojekt Entel LLC
CONTRACTOR Larsen & Toubro (Oman) LLC
RFI NO DATE
LOCATION: SYSTEM/DUTY:
MANUFACTURER: SERIAL NO: TYPE:
GA DRAWING NO: WIRING/SCHEMATIC DIAGRAM NO:

VOLTS: CURRENT RATING:


FAULT LEVEL RATING: MVA SEC
TAG NO: U NO:

INSPECTION RESULT

1. Inspect switchgear for mechanical damage and missing parts.

2. Check switchgear nameplate details and labels. Confirm supplied as per the data
sheet

3. Ensure that the installation meets the requirements of the hazardous area.

4. Ensure that weatherproofing meets the requirements.

5. Inspect the switchgear for cleanliness.

6. Check panels' arrangement in accordance with approved drawings.

7. Inspect switchgear assembly for alignment, level and check foundation fixing details.

8. Check cubicles for alignment and ease of removal.

9. Inspect to ensure that all the internal parts, bus bar chambers and terminal bases are
clean and free from dirt, dust, moisture, and hygroscopic or metallic materials.

10. Inspect all bus bar bolted connections for tightness., record torque

11. Check to ensure that the recommended clearances have been attained.

12. Inspect switchgear earthing bar and earthing connection.

13. Record earth bars to earthing ring resistance (ohms).

14. Check wiring, ferruling and connections against panel wiring/schematic diagrams.

MISFAH- SF – E 08
LARSEN & TOUBRO (OMAN) LLC

INSTALLATION CHECK LIST FOR LV SWITCHGEAR

CONSTRUCTION OF 132/33 KV GRID STATION AND


PROJECT ASSOCIATED TRANSMISSION SYSTEM AT MISFAH AREA
(TENDER 175 /2009)
CLIENT Oman Electricity Transmission Company SAOC
CLIENT’S CONSULTANT Energoprojekt Entel LLC
CONTRACTOR Larsen & Toubro (Oman) LLC
15. Check rating of MCCBs, MCBs and fuses.

16. Continuity checks for fuses.

INSPECTION RESULT

17. Record Instruments' range

18. Insulation resistance of switchgear busbars (M):

Between phases

Between phases to Earth

19. Record current transformer data.

20. Record voltage transformer data

21. Unused cable entries to be blanked off.

22. Inspect incomer protection relays and record types fitted.

23. Check cubicle heating and illumination.

C REMARKS/OBSERVATIONS:

TITLE Larsen & Toubro (Oman) LLC Energoprojekt Entel LLC


NAME
DESIGNATION
SIGNATURE
DATE

MISFAH- SF – E 08