You are on page 1of 6

Report No:

DNV-TPI-VN-
SOURCE - INSPECTION RELEASE NOTE P1805760_RAA-
1254
Revision No:
0

Particulars of project
DNV GL project name: RAA Project
DNV GL customer name: HBK Contracting Co. WLL, Qatar
Supplier:
Manufacturer: Dai Dung Corporation - Factory An Ha
DNV GL acts on behalf of: HBK Contracting Co. WLL, Qatar

DNV GL project number: PP228571


DNV GL assignment number: 27-326
DNV GL order/PO number:

Inspection details
Customer's PO number to Supplier:
Supplier's reference:
Additional references:
Inspection location: Factory An Ha
Number of ITP items covered: Please see as below

ITP Description
4.2 Packing and Loading Control
4.3 Pre dispatch Inspection and release from fabrication yard to Cat Lai port

The following items were inspected and are released under applicable scope of work

PO item Released items as per the packing lists attached with Weekly Inspection Report
no. No.42

This report shall not be used as part of a verification or certification service, except for specific interoffice jobs performed by Division Inspection
under the governance of VMC or CMC for which the use of this form has been formally requested/authorized by VMC/CMC unit.
Form code: SRI 421 Revision: 2017-02 www.dnvgl.com Page 1 of 2

© DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL AS.
SOURCE - INSPECTION RELEASE NOTE Report No:

DNV-TPI-VN-P1805760_RAA-1254
Revision No: 0

Issuance of this release does not relieve the manufacturer of any of his responsibilities and/or
obligations; and from complying with any and all expressed or implied specifications, or manufacturer's
guarantee that the material shall perform satisfactorily under conditions of resonable service.

Report issued on (2020-Feb-18)


DNV GL Performing office: Thailand for DNV GL
DNV GL Contracting office: Qatar

(LE PHUOC NGHIA)


Inspector
Stamp:

Form code: SRI 421 Revision: 2017-02 www.dnvgl.com Page 2 of 2

You might also like