Professional Documents
Culture Documents
DNV-TPI-VN-
SOURCE - INSPECTION RELEASE NOTE P1805760_RAA-
1254
Revision No:
0
Particulars of project
DNV GL project name: RAA Project
DNV GL customer name: HBK Contracting Co. WLL, Qatar
Supplier:
Manufacturer: Dai Dung Corporation - Factory An Ha
DNV GL acts on behalf of: HBK Contracting Co. WLL, Qatar
Inspection details
Customer's PO number to Supplier:
Supplier's reference:
Additional references:
Inspection location: Factory An Ha
Number of ITP items covered: Please see as below
ITP Description
4.2 Packing and Loading Control
4.3 Pre dispatch Inspection and release from fabrication yard to Cat Lai port
The following items were inspected and are released under applicable scope of work
PO item Released items as per the packing lists attached with Weekly Inspection Report
no. No.42
This report shall not be used as part of a verification or certification service, except for specific interoffice jobs performed by Division Inspection
under the governance of VMC or CMC for which the use of this form has been formally requested/authorized by VMC/CMC unit.
Form code: SRI 421 Revision: 2017-02 www.dnvgl.com Page 1 of 2
© DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL AS.
SOURCE - INSPECTION RELEASE NOTE Report No:
DNV-TPI-VN-P1805760_RAA-1254
Revision No: 0
Issuance of this release does not relieve the manufacturer of any of his responsibilities and/or
obligations; and from complying with any and all expressed or implied specifications, or manufacturer's
guarantee that the material shall perform satisfactorily under conditions of resonable service.