Kitchen Tech Risk Assessment Bureau Veritas

Subject: Process 1 - RISK ASSESSMENT RECORD SHEET Sheet No. 1/5


Can Opener Pressing

Location: Kitchen Tech HAZARD IDENTIFICATION/ Assessment By: Neil McFarlane


CONSIDERATION OF RISK
Employees
Affected: Press Operators Assessment Date: 04/03/20XX

Hazard Description Severity Control Measures in Place Likelihood Risk Comments


 Injured whilst handling, lifting or  Manual Handling Training Steel coils are currently manually taken
carrying from a pallet that has housed the coil in
the storage racks. Non-compliance with
 Loading 45kg coils into press Medium Likely High Manual Handling Regs. Re: weight of
coil, frequency of handling, position of
operator.
 Contact with moving machinery  Power Press fully guarded with NB: Employees not happy about one-
or material photosensitive interlocks man two machines. (Stress??)
 Standard Operating Procedure Power Press fully compliant with Power
 Contact with Press High  Authorised and trained personnel only Not Likely Medium Press Regs. Interlock testing carried
 Lock Out tag Out Procedure for tool out. Full preventative maint. schedule
setting operation
 Contact with steel coil  Steel coils only handled using cut Assessment of gloves needed in respect
Low resistant gloves Not Likely V. Low of PPE Regs.

 Slip, trip or fall at same height  Regular cleaning schedule around NB: Need to instill further discipline
machines. amongst workers re: cleanliness of work
 Slip on oil from steel coils Medium  Housekeeping Audits Possible Medium areas.
 Spill Kits
 Sawdust on floors
 Struck by moving, falling object  Racks are secure and tied into SWL of racking not displayed.
building structure
 Steel coil falls from racks  Coils on pallets and secured by ropes
Very High Not Likely Medium
 Only removed from racks by forklift
with cage protection

Feb’18 CQI-IRCA Certified PR 357:ISO 45001 OH&SMS Lead Auditor Training Course Page 1 of 5
(Course ID: 1911)
Kitchen Tech Risk Assessment Bureau Veritas

Subject: Process 2 – Pivot Pin machine RISK ASSESSMENT RECORD SHEET


Sheet No. 2/5
Location: Kitchen Tech
HAZARD IDENTIFICATION/
CONSIDERATION OF RISK Assessment By: Simon Deal
Employees
Affected:
Pivot Machine Operators Assessment Date: 04/03/20XX

Hazard Description Severity Control Measures in Place Likelihood Risk Comments


 Injured whilst handling, lifting or carrying  Manual Handling Training Steel bars are currently
manually taken from a pallet in
 Loading steel bars into machine the storage racks. Non-
Medium Likely High compliance with Manual
Handling Regs. Re: weight of
bar, frequency of handling,
position of operator.
 Contact with moving machinery or material  Lathe guarded with photosensitive Interlock testing carried out. Full
interlocks preventative maintenance
 Contact with Lathe  Standard Operating Procedure schedule
High  Authorised and trained personnel only Not Likely Medium
 Lock Out tag Out Procedure for tool
setting operation

 Exposure to or contact with a harmful  Operators required to wear ear Use of protection dependant on
substance High defenders Quite Medium worker cooperation
 Standard Operating Procedure Possible
 Noise from lathe  Authorised trained personnel only
 Contact with steel bars Low  Steel bars only handled using cut Not Likely V. Low Assessment of gloves needed in
resistant gloves respect of PPE Regs.

 Slip, trip or fall at same height  Regular cleaning schedule around NB: Need to instill further
machines. discipline amongst workers re:
 Slip on cutting oil from lathe Medium  Housekeeping Audits Possible Medium cleanliness of work areas.
 Spill Kits
 Sawdust on floors

Feb’18 CQI-IRCA Certified PR 357:ISO 45001 OH&SMS Lead Auditor Training Course Page 2 of 5
(Course ID: 1911)
Kitchen Tech Risk Assessment Bureau Veritas

RISK ASSESSMENT RECORD SHEET


Subject: Process 3 – Welding Sheet No. 3/5

Location: Kitchen Tech HAZARD IDENTIFICATION/


CONSIDERATION OF RISK Assessment By: Alicia Gregory
Employees
Affected: Weld Operators
Assessment Date: 04/03/20XX
Hazard Description Severity Control Measures in Place Likelihood Risk Comments
 Injured whilst handling, lifting or  Manual Handling Training Trays are currently manually taken
carrying from welding area to paint process.
Non-compliance with Manual
 Loading 26kg trays into press Medium Likely High Handling Regs. Re: weight of coil,
frequency of handling, position of
operator.
 Exposure to or contact with a  Operators required to wear eye Use of PPE dependent on
harmful substance High protection (welding goggles Quite Medium operators.
 Standard Operating Procedure Possible Maintenance program in place.
 Fumes from welding  Authorised trained personnel only
 LEV extraction system for fumes
 Light from welding  Maintenance programme

 Hot metal from weld

Feb’18 CQI-IRCA Certified PR 357:ISO 45001 OH&SMS Lead Auditor Training Course Page 3 of 5
(Course ID: 1911)
Kitchen Tech Risk Assessment Bureau Veritas

RISK ASSESSMENT RECORD SHEET


Subject: Process 4 - Painting Sheet No. 4/5

Location: Kitchen Tech HAZARD IDENTIFICATION/


CONSIDERATION OF RISK Assessment By: Neil McFarlane

Employees
Affected: Paint Applicators Assessment Date: 04/03/20XX

Hazard Description Severity Control Measures in Place Likelihood Risk Comments


 Injured whilst handling, lifting or  Manual Handling Training Trays are currently manually taken
carrying from a pallet to the paint area. Non-
compliance with Manual Handling
 Carrying 25kg trays into paint area. Medium Likely High Regs. Re: weight of coil, frequency
of handling, position of operator.
 Exposure to or contact with a  Operators required to wear Use of PPE dependent on
harmful substance respiratory protection Possible Medium operators.
Medium  Standard Operating Procedure Maintenance program in place.
 Powder paint emissions from  Authorised trained personnel only
process  LEV extraction system for fumes
 Maintenance program
 Exposure to explosion  LEV extraction system NB: Need to instill further discipline
 Regular housekeeping amongst workers re: cleanliness of
 Risk of dust explosion Very High  Housekeeping audits Possible High work areas.
 Static isolation
 Explosion and spark protected
equipment

Feb’18 CQI-IRCA Certified PR 357:ISO 45001 OH&SMS Lead Auditor Training Course Page 4 of 5
(Course ID: 1911)
Kitchen Tech Risk Assessment Bureau Veritas

RISK ASSESSMENT RECORD SHEET


Subject: Process 5 – final assembly and packing Sheet No. 5/5

HAZARD IDENTIFICATION/
Location: Kitchen Tech CONSIDERATION OF RISK Assessment By: Brad Pitt

Employees Affected: Packers Assessment Date: 04/03/20XX

Hazard Description Severity Control Measures in Place Likelihood Risk Comments


 Injured whilst handling, lifting or carrying  Manual Handling Training

 Carrying loaded trays


 Repetitive strain Medium Likely High

Feb’18 CQI-IRCA Certified PR 357:ISO 45001 OH&SMS Lead Auditor Training Course Page 5 of 5