METHOD OF STATEMENT
FOR LVAC PANELS
CONTENTS
1.0 Purpose 03
2.0 References 03
4.0 Manpower 03
5.0 Procedure 03
7.0 Responsibilities 07
8.0 Emergency 07
9.0 Records 07
2|Page
METHOD OF STATEMENT
FOR LVAC PANELS
1.0 Purpose
This method statement will give a brief steps which is to be carried to verify the physical
condition and Testing the connections of LVAC Panel
2.0 Reference
- Approved schematic drawing
- Project HSE Plan
- Project Quality Plan/Inspection Test Plan
- FAT reports
3.0 Test kits
- Insulation tester
- CPC 100
- Programma primary injection kit
- Multi meter and clamp meter
4.0 Man power
- Project Engineer/ CEP holder - 01
- Testing Engineer (DCRP) - 01
- HSE Officer - 01
- Technician - 04
5.0 Procedure
- Ensure all reference documents should be available at site.
- Ensure that valid permits are obtained from concerned authorities wherever applicable.
- Tool box talk will be conducted by the CEP/Site supervisor prior to start of work and
attendance will be recorded.
- Ensure only trained persons shall operate the Testing equipment.
- Ensure to provide proper barricades, caution signage’s before starting the Testing
activities to prevent the entry of unauthorised persons to the work area.
- Ensure all concerned personals shall use PPE and all other items are required.
- Ensure the availability of Calibration certificates for the test kits and measuring device.
- Competent Electrical Person with valid license for receiving LOA will be full time
available at site.
- Ensure to provide uninterrupted power supply for the Testing kit.
- Ensure that the Earthing of Test kit and the equipment where ever necessary.
- Always notify Owners Engineer before performing any activities.
3|Page
METHOD OF STATEMENT
FOR LVAC PANELS
4|Page
METHOD OF STATEMENT
FOR LVAC PANELS
5|Page
METHOD OF STATEMENT
FOR LVAC PANELS
6|Page
METHOD OF STATEMENT
FOR LVAC PANELS
Safety Provision
The following safety and precautionary measures will be taken prior to start of the activity.
- Tool box talk shall be conducted and all workers who shall be involved in the testing
works shall be well oriented to the nature of work.
- Ensure the work force deployed for these activities are having adequate skill and
undergone required HSE training.
- Ensure required LOA/PTW is available at site before starting the job.
- All equipment’s, tools & tackles shall be checked by HSEA before starting the job.
- Segregated access for equipment and workers shall be provided.
- Ensure enough drinking water is available at work site.
- Ensure work crew is provided with adequate transportation facilities.
- Ensure all employees are clear about their job, tasks and hazards involved.
- Ensure all the testing kits and tools to be used are in good working condition.
7.0 Responsibilities
- Construction Manager is over all responsible for Safety, Quality and Progress of the
Project.
- Testing Engineer shall be responsible for the site testing activities and implementation of
all testing plans.
- HSE Officer will be monitoring all works are being carried out in accordance with the
safety requirements on site.
8.0 Emergency
In case of Emergency,
- Stop the work.
- Turn off the power supply of the Testing kit.
- Alert the nearby workers to reach to the nearest assembly point.
- Don’t get panic and do not run.
- Inform the site HSE officer and other key personnel from the emergency contacts numbers
displayed in the site.
- Call emergency services if required.
- Supervisor shall make head count and report.
9.0 Records
- SAT (Site acceptance test) reports.
- Quality Records.
7|Page
METHOD OF STATEMENT
FOR LVAC PANELS
- Inspection forms/RFI.