SOP-CS-01 SCF-01a

FIELD INSPECTION REPORT


FIR#:CED/CS/FIR/JFS/28896/005
Project Activity WAREHOUSE (G) + OFFICES (G), UG HOLDING & WATER Timescale category
codes:
Current Status of Project active
1=IMMEDIATE
Area Covered all 2=24 HOURS
Inspection Time 09:00hrs 3=3 DAYS
4=7 DAYS
Manpower 50

COMPANY/CONTRACTOR NAME: LOYAL BUILDING CONTRACTING LLC


CONSULTANT NAME : Corporate Planners Engineering Consultants

ADDRESS/PLOT NO: S20131JFS


DURING INSPECTION OF YOUR SITE THE FOLLOWING OBSERVATIONS WERE MADE WHICH ARE IN
BREACH OF UAE HEALTH AND SAFETY REGULATIONS

Sr NC Brief Description of Non Compliance Location Time Repeat


No. Code scale Item
Code Y/N

1 1 Adequately water was not sprinkled to avoid dust accumulation at 1 N


site from loose soil.
2 1 Social distance was not maintain from each other workers. 1 N

- Face mask and hand gloves was not issued or not used by site
workers which is increase infections to them from their work place.
- Non availability of hand sanitizers at different areas at site

3 1 All the above comments must be rectifying as immediately and 1 N


send the close out report through online, Noncompliance with the
above comments in future then appropriate action shall be taken
against project contractor/ consultant
INSPECTED BY
NAME SIVAKUMAR MOHAMRAM
POSITION EHS Officer
DATE 13-JUL-20

CC : Corporate Planners Engineering Consultants: corporateplanners.dxb12@gmail.com, Promat BD Middle East: vishant.menezes@promatbme.ae


EHS CS

REVISION 1 March 2009 Page No. 1