This document is a bill of quantities for renovation works for Mr. John George. It lists 9 items of demolition work including removal of sanitary fixtures and breaking of walls. It also lists 13 new construction items such as laying block walls, rendering, painting, tiling floors and walls, installing doors and gypsum ceilings. External works include removing paving, tiling walls, painting and casting concrete. The total cost for the renovation is estimated to be N6,059,593.
Original Description:
Original Title
QUOTATION FOR GROUND BEAM TO STIFFING AN EXISTING FENC2
This document is a bill of quantities for renovation works for Mr. John George. It lists 9 items of demolition work including removal of sanitary fixtures and breaking of walls. It also lists 13 new construction items such as laying block walls, rendering, painting, tiling floors and walls, installing doors and gypsum ceilings. External works include removing paving, tiling walls, painting and casting concrete. The total cost for the renovation is estimated to be N6,059,593.
This document is a bill of quantities for renovation works for Mr. John George. It lists 9 items of demolition work including removal of sanitary fixtures and breaking of walls. It also lists 13 new construction items such as laying block walls, rendering, painting, tiling floors and walls, installing doors and gypsum ceilings. External works include removing paving, tiling walls, painting and casting concrete. The total cost for the renovation is estimated to be N6,059,593.
DEMOLISION 1 Removal of existing sanitary, carefully to be re-used. (a) W/C NR 3 800 2,400 (b) W/B NR 3 800 2,400 (c) Cubicle NR 3 1000 3,000 (d) Water Heater NR 3 700 2,100 2 Breaking of wall and cartaway from building to appropriate place. M2 38.55 1000 38,550 NEW WORKS (i) Lay a vibrated hollow sand crete block of 9” in a stretcher bond pattern. M2 56.62 5500 309,045 (ii) Rendering using 1:3 mix ratio of cement and sand and well range and level. M2 84.42 2000 168,840 (iii) Apply p.o.p on a well range wall in 15mm thick layer, M2 433.22 800 346,576 (iv) Ditto ceiling M2 126.86 800 101,488 (v) Apply appropriately two layers of dulux paint on the surface. M2 433.22 1200 519,864 (vi) Ditto ceiling M2 126.86 1200 152,160 (vii) Fix only the both ceramic and vitrified tiles on walls and floor appropriately with approved adhesive with cement. Including pre-grouting joints with matching cement. M2 103.1 1000 103,100 (viii) Supply and install gypsum pertition soffit ceiling with tape joint, well range and edge finished with corner bit to be ready to receive p.o.p skimming/screeding. M2 127 5500 693,000 (ix) Screed with 1:3 mix ratio of cement, sand, well range and level to receive floor tiles. M2 103.1 1200 123,720 SUB TOTAL PAGE 1 N2,566,243 BILL OF QUANTITY FOR MR JOHN GEORGE MODIFICATION/RENOVATION WORKS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
DOOR A 2 Leaf, Single, Swing timber panel door 15/8 thick complete with wrough hardwood frame and approved iron monger, using HDF. NR 5 58,750 293,750 B Refurbish doors, prepare and spray two coats oil based paint anti red oxide to metal panel door. NR 1 46,500 46,500 C Allow for patching all cracks on wall surfaces using DR fix it crack cement, joint tape, seal with p.o.p mix with top bond. Sum 150,000 D Repair of kitchen cabinet Sum 20,000 E EXTERNAL WORKS (i) Removal of existing interlock to appropriate place. M2 210 150 31,000 (ii) Supply and fix only the following 8mm ceramic wall tiles laid on wall with approved adhesive to cement and gum bid including pre-grouting joint with matching cement. M2 60 5,875 352,500 (iii) Apply p.o.p on wall in 15mm thick layers, then apply approximately two layers of dulux paint on the surface. M2 175.94 2,300 404,600 (iv) Casting of column to correct crack joint on fence. NR 1 15,000 (v) Casting of concrete design floor sloping towards the gate. M2 210 8,000 1,680,000 (vi) Electrical and Mechanical subject to review Sum 350,000 SUB TOTAL PAGE 2 N3,343,350 CONTIGENCIES N150,000 SUB TOTAL PAGE 1 N2,566,243 GRAND TOTAL N6,059,593