You are on page 1of 1

Ganj Ali Bek Irrigation Canal, Taloqan,Takhar

UNIT COST OF MATERIAL & LABOUR


Description Rate USD Unit
Skilled Labour 15.00 MD
Unskilled Labour 6.00 MD
Sand 5.00 Cum.
Coarse aggregate 15.00 Cum.
Cement 0.110 Kg.
Stone 10.00 Cum.
Bond Stone 8.00 Cum.
Boulder 8.00 Cum.
Gravel 8.00 Cum.
Tor Steel 830.00 T.
Binding wire 1.20 Kg.
Nail 1.50 Kg.
Bitumen 1.50 Kg.
Clearing and levelling 500.00 L.S.
Setting alingment 600.00 L.S.
Mobilization 9000.00 L.S.
Demobilization 500.00 L.S.
Water diversion 300.00 L.S.
Equipment for drilling 50.00 LS
Formwork 10.00 Ls
Formwork for concrte 7.00 Sqm
I-beam 100mm 25.00 m
3"GI pipe 13.00 m
Equipment and welding materials 150.00 L.S.
Painting 4.00 Leter
Wood (local and seasoned) for formwork 400.00 Cum.
MS Gate 60 cm 90.00 NO
Axle 110.00 M
Cutting 4.00 Cum.
Metallic gate size (0.5)m 100.00 NO
Metallic gate size (0.6)m 100.00 NO
Metallic gate size (0.7)m 150.00 NO
Metallic gate size (0.8)m 150.00 NO
Metallic gate size (1.5)m 300.00 NO
Metallic gate size (1)m 220.00 NO
RCC Work (1:1.5:3) 200.00 Cum.
Gabion box wire 1.80 Kg.
Stone 8.00 Cum.
Skilled Labour 10.00 MD
Unskilled Labour 5.00 MD
Filling materials 3.00 Cum.
6" GI pipe 75.00 m